Contractor's application for an extension of time
Invariably an evaluation of extension of time (EOT) will be made based on the information submitted by the contractor such as work programme and architect's instructions. Lack of information of delay is one of the common mistakes by the contractor in the application of EOT and this can lead to...
| Main Author: | Danial, Norhana |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2007
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/6413/ http://eprints.utm.my/6413/1/NorhanaDanialMFKA2007.pdf |
Similar Items
Payment woes among Malaysian contractors
by: Che Munaaim, Muhammad Ehsan
Published: (2006)
by: Che Munaaim, Muhammad Ehsan
Published: (2006)
Late payment problems among contractors in Malaysia
by: Mohd. Nazir, Noor Zarina
Published: (2006)
by: Mohd. Nazir, Noor Zarina
Published: (2006)
Extension of time and acceleration claims
by: Oon, Dennis Soon Lee
Published: (2006)
by: Oon, Dennis Soon Lee
Published: (2006)
A framework for cost assessment of qms for building contractors based on biological immune system
by: Keyvanfar, Ali
Published: (2009)
by: Keyvanfar, Ali
Published: (2009)
Drivers in the implementation of sustainable construction management among main contractors
by: Nur Syamimi, Zulkefli, et al.
Published: (2017)
by: Nur Syamimi, Zulkefli, et al.
Published: (2017)
Awareness of Green Building Index (GBI) Implementation among Malaysian Contractors
by: Zarith Sufia, Azlan, et al.
Published: (2015)
by: Zarith Sufia, Azlan, et al.
Published: (2015)
Problems in implementation of ISO 9001 quality management system among Malaysian contractors
by: Tan, Chin Keng, et al.
Published: (2010)
by: Tan, Chin Keng, et al.
Published: (2010)
Intention to engage in inter-contractor cooperation: A belief elicitation study in the construction industry
by: Moshood, Taofeeq D., et al.
Published: (2024)
by: Moshood, Taofeeq D., et al.
Published: (2024)
Organizational factors and risk management practice of Malaysian contractors: the moderating role of coercive pressure
by: Manal Suliman, Omer Tagad
Published: (2023)
by: Manal Suliman, Omer Tagad
Published: (2023)
Legal approach on assessment of contractors' entitlement to extension of time
by: Chong, Heap Yih, et al.
Published: (2012)
by: Chong, Heap Yih, et al.
Published: (2012)
Research trends on early contractor involvement in construction projects: A bibliometric analysis
by: Osuizugbo, Innocent Chigozie, et al.
Published: (2024)
by: Osuizugbo, Innocent Chigozie, et al.
Published: (2024)
Six sigma approach to real time cast in-situ slab concreting process improvement
by: Niaraki, Seyed Ali Mousavi
Published: (2010)
by: Niaraki, Seyed Ali Mousavi
Published: (2010)
Awareness of risk management among contractors in the government construction project
by: Wan Azwanfakhrul, Wan Ibrahim
Published: (2018)
by: Wan Azwanfakhrul, Wan Ibrahim
Published: (2018)
The synergy between human factors and risk attitudes of Malaysian contractors’: Moderating effect of government policy
by: Taofeeq, D. M., et al.
Published: (2020)
by: Taofeeq, D. M., et al.
Published: (2020)
Contractor’s technology acceptance for firm sustainability performance
by: Bamgbaded, J. A., et al.
Published: (2019)
by: Bamgbaded, J. A., et al.
Published: (2019)
Development of conceptual framework on the occupational stress for the construction projects management staff of China contractors / Yang Zi Fan
by: Yang, Zi Fan
Published: (2022)
by: Yang, Zi Fan
Published: (2022)
Project risk management in Malaysian oil and gas industry: Implementation by EPC local Contractor / Zaim Aiman Che Rosli
by: Zaim Aiman, Che Rosli
Published: (2020)
by: Zaim Aiman, Che Rosli
Published: (2020)
The Moderating Role of Government Policy on Contractors’ Risk Attitudes in Malaysia Construction Companies
by: Taofeeq, D. M., et al.
Published: (2019)
by: Taofeeq, D. M., et al.
Published: (2019)
A study of construction waste material management in Malaysia : a contractor point of view
by: Hilmi Hakim, Bakri
Published: (2017)
by: Hilmi Hakim, Bakri
Published: (2017)
The performance of Felda Plantations Sdn. Bhd. contractors
by: Ibrahim, Ramzi
Published: (2006)
by: Ibrahim, Ramzi
Published: (2006)
Sustaining factors for lean manufacturing excellence : an explanatory mixed methods study
by: Norhana, Mohd Aripin
Published: (2023)
by: Norhana, Mohd Aripin
Published: (2023)
Effectiveness of construction industry payment and Adjudication Act (CIPAA) in remedying payment issues among sub-contractors
by: Tay, Zi Keng, et al.
Published: (2018)
by: Tay, Zi Keng, et al.
Published: (2018)
New approach of process cycle time measurement system with sensor application
by: Chulakit, Saranjuu, et al.
Published: (2024)
by: Chulakit, Saranjuu, et al.
Published: (2024)
Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers
by: Lee, Zheng Ping, et al.
Published: (2022)
by: Lee, Zheng Ping, et al.
Published: (2022)
Application of BIM in sustainability analysis
by: Golzarpoor, Hamed
Published: (2010)
by: Golzarpoor, Hamed
Published: (2010)
Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies
by: Taofeeq, D. M., et al.
Published: (2020)
by: Taofeeq, D. M., et al.
Published: (2020)
Employer's rights and contractor's liabilities in relation to construction defects after final certificate
by: Tan, Pei Ling
Published: (2007)
by: Tan, Pei Ling
Published: (2007)
Tendering and estimating strategies In contractor organization
by: Liana Syafawati, Mohamad Azmi
Published: (2017)
by: Liana Syafawati, Mohamad Azmi
Published: (2017)
Using artificial neural network to predict power plant turbine hall key cost drivers
by: Ng, Choo Geon
Published: (2007)
by: Ng, Choo Geon
Published: (2007)
Variation control affecting construction works for Lembaga Kemajuan Tanah Persekutuan(FELDA)
by: Mohd. Yunus, Nurul Ayun
Published: (2007)
by: Mohd. Yunus, Nurul Ayun
Published: (2007)
The level of compliance to safety audit in construction industry
by: Awang, Ahmad Fauzi
Published: (2007)
by: Awang, Ahmad Fauzi
Published: (2007)
Management of Melana watershed using multicriteria decision making approaches
by: Yaccob, Ahmad Amzari
Published: (2007)
by: Yaccob, Ahmad Amzari
Published: (2007)
Emergent trend of Malaysian construction industry : the rise of facilities management
by: Mohd. Kamin, Norazlina
Published: (2007)
by: Mohd. Kamin, Norazlina
Published: (2007)
The study of dependency factors on foreign worker in construction industry : contractor perspective
by: Nur Hidayah, Aliman
Published: (2017)
by: Nur Hidayah, Aliman
Published: (2017)
Problem and dilemma faced by Malaysia contractor when handling international project
by: Marhazlin, Mohamad
Published: (2017)
by: Marhazlin, Mohamad
Published: (2017)
The impact of safety and health towards construction workforce productivity
by: Wong, Queenie, et al.
Published: (2023)
by: Wong, Queenie, et al.
Published: (2023)
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019)
by: Siti Nurfarahin, Samsudin
Published: (2019)
Factors affecting site supervision in improving IBS productivity
by: Wan Ramizah, Wan Salleh
Published: (2019)
by: Wan Ramizah, Wan Salleh
Published: (2019)
The impacts of social responsibility on the environmental sustainability performance of the Malaysian construction industry
by: W. A., Ajibike, et al.
Published: (2021)
by: W. A., Ajibike, et al.
Published: (2021)
Study on the effectiveness of mergers and acquisitions in the construction industry
by: Nur Sabrina, Mohd Khasren
Published: (2018)
by: Nur Sabrina, Mohd Khasren
Published: (2018)
Similar Items
-
Payment woes among Malaysian contractors
by: Che Munaaim, Muhammad Ehsan
Published: (2006) -
Late payment problems among contractors in Malaysia
by: Mohd. Nazir, Noor Zarina
Published: (2006) -
Extension of time and acceleration claims
by: Oon, Dennis Soon Lee
Published: (2006) -
A framework for cost assessment of qms for building contractors based on biological immune system
by: Keyvanfar, Ali
Published: (2009) -
Drivers in the implementation of sustainable construction management among main contractors
by: Nur Syamimi, Zulkefli, et al.
Published: (2017)