Development of transmission use of system charges scheme for Malaysia transmission network

Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmi...

Full description

Bibliographic Details
Main Author: Samsudin, Noor Azam
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/6409/
http://eprints.utm.my/6409/1/NoorAzamSamsudinMFKE2007.pdf
_version_ 1848891259784003584
author Samsudin, Noor Azam
author_facet Samsudin, Noor Azam
author_sort Samsudin, Noor Azam
building UTeM Institutional Repository
collection Online Access
description Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmission and distribution. One of the outstanding issues in unbundling of electricity supply industry is transmission service pricing. This project is focus on the development transmission use of system charges scheme for Malaysia transmission network in restructuring environment. This project required to identify the costs of transmission services provided by the transmission utility and evaluating the transmission assets. The several alternatives of the allocation methods that can be used to evaluate the usage of transmission services have been studied. From this study, a suitable usage allocation method is identified. This project also involved study the transmission pricing methodologies. As the result, the transmission access pricing for Malaysia transmission will classify. The transmission access pricing must be non discrimination, transparent, economically, efficiency and allow full recovery of costs. Finally, the transmission service charge percentage is allocated between customers and generators. The developed scheme is tested on the bus systems and the TNB system to evaluate its effectiveness providing a fair transmission charges to the users.
first_indexed 2025-11-15T20:55:08Z
format Thesis
id utm-6409
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:55:08Z
publishDate 2007
recordtype eprints
repository_type Digital Repository
spelling utm-64092018-08-29T07:51:02Z http://eprints.utm.my/6409/ Development of transmission use of system charges scheme for Malaysia transmission network Samsudin, Noor Azam TK Electrical engineering. Electronics Nuclear engineering HD61 Risk Management Presently, the trend of electricity industry is towards restructuring of electricity supply industry, as a means to increase operation efficiency and lower energy costs. Restructuring environment is referring to unbundling of electricity utilities into its basic component such as generation, transmission and distribution. One of the outstanding issues in unbundling of electricity supply industry is transmission service pricing. This project is focus on the development transmission use of system charges scheme for Malaysia transmission network in restructuring environment. This project required to identify the costs of transmission services provided by the transmission utility and evaluating the transmission assets. The several alternatives of the allocation methods that can be used to evaluate the usage of transmission services have been studied. From this study, a suitable usage allocation method is identified. This project also involved study the transmission pricing methodologies. As the result, the transmission access pricing for Malaysia transmission will classify. The transmission access pricing must be non discrimination, transparent, economically, efficiency and allow full recovery of costs. Finally, the transmission service charge percentage is allocated between customers and generators. The developed scheme is tested on the bus systems and the TNB system to evaluate its effectiveness providing a fair transmission charges to the users. 2007-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/6409/1/NoorAzamSamsudinMFKE2007.pdf Samsudin, Noor Azam (2007) Development of transmission use of system charges scheme for Malaysia transmission network. Masters thesis, Universiti Teknologi Malaysia, Faculty of Electrical Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62273
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
HD61 Risk Management
Samsudin, Noor Azam
Development of transmission use of system charges scheme for Malaysia transmission network
title Development of transmission use of system charges scheme for Malaysia transmission network
title_full Development of transmission use of system charges scheme for Malaysia transmission network
title_fullStr Development of transmission use of system charges scheme for Malaysia transmission network
title_full_unstemmed Development of transmission use of system charges scheme for Malaysia transmission network
title_short Development of transmission use of system charges scheme for Malaysia transmission network
title_sort development of transmission use of system charges scheme for malaysia transmission network
topic TK Electrical engineering. Electronics Nuclear engineering
HD61 Risk Management
url http://eprints.utm.my/6409/
http://eprints.utm.my/6409/
http://eprints.utm.my/6409/1/NoorAzamSamsudinMFKE2007.pdf