The use of photogrammetry techniques to evaluate the construction project progress
The modeling of 3D objects from image sequence is a challenging problem and has been an important research topic in the areas of photogrammetry and computer vision for many years. Photogrammetry is the science of calculating 3D object co-ordinates from image and provides a flexible and robust approa...
| Main Authors: | Ahmed Memon, Zubair, Abd. Majid, Muhd Zaimi, Mustaffar, Mushairry |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit UTM Press
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/5843/ http://eprints.utm.my/5843/1/bab1.pdf |
Similar Items
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006)
by: Memon, Zubair Ahmed, et al.
Published: (2006)
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007)
by: Ahmed Memon, Zubair, et al.
Published: (2007)
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006)
by: Zubair Ahmed Memon,, et al.
Published: (2006)
Application of digital photogrammetry to quantification of road surface distresses
by: Mustaffar, Mushairry, et al.
Published: (2004)
by: Mustaffar, Mushairry, et al.
Published: (2004)
Craniofacial Anthropometry : the comparison of accuracy between laser scanning and photogrammetry techniques
by: Fazli, Mohd. Kamil, et al.
Published: (2007)
by: Fazli, Mohd. Kamil, et al.
Published: (2007)
Measurement of the human face using close-range digital
photogrammetry technique
by: M. Ariff, M. Farid, et al.
Published: (2005)
by: M. Ariff, M. Farid, et al.
Published: (2005)
Evaluation of cracks and disintegrations using close-range digital photogrammetry and image processing technique
by: Ling, Tung Chai
Published: (2005)
by: Ling, Tung Chai
Published: (2005)
Calibration of digital camera for medical photogrammetry
by: Ahmad, Anuar, et al.
Published: (2004)
by: Ahmad, Anuar, et al.
Published: (2004)
Development of mobile mapping system using GPS and photogrammetry technique
by: Ses, Sahrum, et al.
Published: (2005)
by: Ses, Sahrum, et al.
Published: (2005)
Architectural Photogrammetry in Malaysia: An Experience
by: Ahmad, Anuar, et al.
Published: (1996)
by: Ahmad, Anuar, et al.
Published: (1996)
Strategies to measure progress and productivity in model-based construction projects
by: Ahmad Atif, Adzman
Published: (2019)
by: Ahmad Atif, Adzman
Published: (2019)
Photogrammetry and 3D laser scanning as spatial data capture techniques for a national craniofacial database
by: Majid, Zulkepli, et al.
Published: (2005)
by: Majid, Zulkepli, et al.
Published: (2005)
An approach to joint roughness measurement in Rock-A comparative study
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
by: Mohd. Amin, Mohd. For, et al.
Published: (2001)
Advances in photogrammetry for digital hand surface capture in swimming performance study
by: Chong, Albert K., et al.
Published: (2006)
by: Chong, Albert K., et al.
Published: (2006)
Techniques to develop forecasting model on low cost housing in urban area
by: Zainun, Noor Yasmin, et al.
Published: (2002)
by: Zainun, Noor Yasmin, et al.
Published: (2002)
Development of land based mobile mapping system using GPS and close range photogrammetry technique
by: Ses, Sahrum, et al.
Published: (2006)
by: Ses, Sahrum, et al.
Published: (2006)
Investigating the feasibility of photogrammetric area-based image matching technique in the measurement of three-dimensional deflections of structures
by: Mustaffar, Mushairry, et al.
Published: (2005)
by: Mustaffar, Mushairry, et al.
Published: (2005)
An overview: NIR imaging system for medical photogrammetry applications
by: M. Arif, M. Farid, et al.
Published: (2006)
by: M. Arif, M. Farid, et al.
Published: (2006)
An effectiveness of communication in project undertaking: problems and constraints
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
by: Mohd. Yusuf, Aminah, et al.
Published: (2001)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification
by: Che Puan, Othman, et al.
Published: (2007)
by: Che Puan, Othman, et al.
Published: (2007)
Automated pavement imaging program (APIP) for pavement cracks classification and quantification – a photogrammetric approach
by: Mustaffar, Mushairry, et al.
Published: (2008)
by: Mustaffar, Mushairry, et al.
Published: (2008)
Architectural photogrammetry for conservation and restoration of historical building : an experience with MPS-2 system
by: Ahmad, Anuar
Published: (2004)
by: Ahmad, Anuar
Published: (2004)
Neural Network Model For Design Constructability Assessment
by: Mohamad Zin, Rosli, et al.
Published: (2004)
by: Mohamad Zin, Rosli, et al.
Published: (2004)
Engineering doctorate (EngD) programme at Universiti Teknologi Malaysia
by: Abd. Majid, Muhd. Zaimi, et al.
Published: (2004)
by: Abd. Majid, Muhd. Zaimi, et al.
Published: (2004)
Performance indicators for public evaluation of environmental management plan implementation in highway construction projects
by: Nurol Huda, Dahalan, et al.
Published: (2023)
by: Nurol Huda, Dahalan, et al.
Published: (2023)
Study of deserted construction projects in Malaysia
by: Nazratul Izzana, Ishak
Published: (2015)
by: Nazratul Izzana, Ishak
Published: (2015)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
Photogrammetry
by: Sholarin, E., et al.
Published: (2015)
by: Sholarin, E., et al.
Published: (2015)
Evaluation Of Post EIA : Water Quality Due To The Construction Of The Sungai Kinta Dam Project, Perak
by: Ishak, Nurfaizahwati
Published: (2006)
by: Ishak, Nurfaizahwati
Published: (2006)
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014)
by: Sorooshian, Shahryar
Published: (2014)
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
Impacts of poor management on construction project in Malaysia
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
Factors effecting the cost management in construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
To review the effectiveness of project management in construction process
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
A Study On Variations In Sewerage Construction Projects
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
BIM in Kenyan construction industry: Benefits, challenges, and adoption processes in sustainable construction projects
by: Alakhali, Ahmed K., et al.
Published: (2024)
by: Alakhali, Ahmed K., et al.
Published: (2024)
Performance of photogrammetry-based makeshift 3D scanning system for geometrical object in reverse engineering
by: Muhammad Nur Farhan, Saniman, et al.
Published: (2023)
by: Muhammad Nur Farhan, Saniman, et al.
Published: (2023)
Improving safety performance in constructions project in Malaysia ( case study : in Kuantan )
by: Iradatul Hanis, Abd Hamid
Published: (2017)
by: Iradatul Hanis, Abd Hamid
Published: (2017)
Similar Items
-
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006) -
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007) -
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006) -
Application of digital photogrammetry to quantification of road surface distresses
by: Mustaffar, Mushairry, et al.
Published: (2004)