Guidelines for the preparation and submission of work schedule for construction project
The lack of standardised guidelines for the preparation and submission of work schedule has contributed to several problems in construction project especially the extra efforts that have to be put in before parties involved in the project accept the work plan. This paper explores the current practic...
| Main Authors: | Mohamad Zin, Rosli, Mohamad, Mohamad Ibrahim, Mansur, Shaiful Amri, Chan Donald, Bing Tee |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Faculty of Civil Engineering, Universiti Teknologi Malaysia
2008
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/579/ http://eprints.utm.my/579/1/RosliMohamadZin2008_GuidelinesFor_ThePreparation.pdf |
Similar Items
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004)
by: Mansur, Shaiful Amri
Published: (2004)
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
Thesis Submission Guideline
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2017)
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2017)
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994)
by: Mohamad Nor, Norazman
Published: (1994)
Submission to Parliamentary Standing Committee on Public Works – Australian War Memorial Development Project, submission no. 62, June 2020.
by: Morris, Narrelle
Published: (2020)
by: Morris, Narrelle
Published: (2020)
The turnbull guidelines revisited
by: Shair Mohamad, Mohd Akram
Published: (2010)
by: Shair Mohamad, Mohd Akram
Published: (2010)
Online undergraduate project proposal submission
by: Asmak, Mat Daud
Published: (2005)
by: Asmak, Mat Daud
Published: (2005)
Productivity Assessment and Schedule Compression Index (PASCI) for project planning
by: Mansur, Shaiful Amri, et al.
Published: (2003)
by: Mansur, Shaiful Amri, et al.
Published: (2003)
MBA DISSERTATION - Company based Group Project Individual work submission - Cloud Computing
by: Rajasagi, G
Published: (2013)
by: Rajasagi, G
Published: (2013)
Project meeting and guidelines: the impact on time performance of construction projects in Malaysia
by: Zulkiflee Abdul-Samad,, et al.
Published: (2023)
by: Zulkiflee Abdul-Samad,, et al.
Published: (2023)
Computerized assignment / project submission system for F.S.K.T.M.
by: Phillomeana, Anak Limbang
Published: (2006)
by: Phillomeana, Anak Limbang
Published: (2006)
IPS USM Guide Book: A Guide to the preparation submission and examination of Thesis
by: IPS, Institut Pengajian Siswazah
Published: (2010)
by: IPS, Institut Pengajian Siswazah
Published: (2010)
Thesis Submission Procedures
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Electronic submission in construction: Government approval practice and potential issues in Malaysia
by: Nurillya, Zahimi, et al.
Published: (2024)
by: Nurillya, Zahimi, et al.
Published: (2024)
Probability distribution fitting of schedule overruns in construction projects
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Systematic approach for developing as-built schedule for
construction project
by: Zubair Ahmed Memon,, et al.
Published: (2006)
by: Zubair Ahmed Memon,, et al.
Published: (2006)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
Sexual harassment complaints: guidelines for the parties
by: Ali Mohamed, Ashgar Ali
Published: (2011)
by: Ali Mohamed, Ashgar Ali
Published: (2011)
An assessment tool for monitoring project performance
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
FORM: Submission of IR UMPSA
by: Noorul Farina, Arifin
Published: (2019)
by: Noorul Farina, Arifin
Published: (2019)
Final Submission of Thesis Form
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
Notice for Submission of Thesis Form
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
Student Workflow for Thesis Submission
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2016)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Knowledge transferring process in earthwork contracting firms
by: Mansur, Shaiful Amri, et al.
Published: (2008)
by: Mansur, Shaiful Amri, et al.
Published: (2008)
North West Shelf Project Extension Proposal Appeal - Further Submissions (August 2023)
by: Finn, Hugh, et al.
Published: (2023)
by: Finn, Hugh, et al.
Published: (2023)
Reliability and construct validity of practice of medical doctors on smoking cessation guidelines
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2016)
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2016)
Malaysian Competition Commission releases guidelines on Competition Law
by: Ahamat, Haniff
Published: (2012)
by: Ahamat, Haniff
Published: (2012)
Final Year Project Guideline
by: Nawanir, Gusman, et al.
Published: (2020)
by: Nawanir, Gusman, et al.
Published: (2020)
Final Year Project Guideline
by: Nawanir, Gusman, et al.
Published: (2019)
by: Nawanir, Gusman, et al.
Published: (2019)
Valuing the Teaching Profession Inquiry - Submission from the Teachers’ Work in Schools Research Team
by: McGrath-Champ, Susan, et al.
Published: (2020)
by: McGrath-Champ, Susan, et al.
Published: (2020)
Submission to Treasury: Early Release of Superannuation
by: Hodgson, Helen
Published: (2018)
by: Hodgson, Helen
Published: (2018)
Submission to Treasury Retirement Income Review
by: Hodgson, Helen
Published: (2020)
by: Hodgson, Helen
Published: (2020)
An introduction to sports law in Malaysia : legal guidelines for sportspersons and sports administrators
by: Hassim, Zaidi
Published: (2005)
by: Hassim, Zaidi
Published: (2005)
Reliability and construct validity of knowledge, attitude, and practice of medical doctors on smoking cessation guidelines
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2017)
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2017)
Reliability and construct validity of knowledge, attitude and practice of medical doctors on smoking cessation guidelines
by: Md Aris, Mohd Aznan, et al.
Published: (2016)
by: Md Aris, Mohd Aznan, et al.
Published: (2016)
Reliability and construct validity of knowledge, attitude and practice of medical doctors on smoking cessation guidelines
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2018)
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2018)
Reliability and construct validity of knowledge, attitude and practice of medical doctors on smoking cessation guidelines
by: Md Aris, Mohd Aznan, et al.
Published: (2016)
by: Md Aris, Mohd Aznan, et al.
Published: (2016)
Reliability and construct validity Of knowledge, attitude and
practice of medical doctors on smoking cessation guidelines
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2016)
by: Shalihin, Mohd Shaiful Ehsan, et al.
Published: (2016)
Similar Items
-
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004) -
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006) -
Thesis Submission Guideline
by: Universiti Malaysia Sarawak, Centre for Graduate Studies
Published: (2017) -
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994) -
Submission to Parliamentary Standing Committee on Public Works – Australian War Memorial Development Project, submission no. 62, June 2020.
by: Morris, Narrelle
Published: (2020)