Simulation of Industrialised Building System components production

The construction of IBS building should starts with the production of the IBS components and the production process is the main activity concerned in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusab...

Full description

Bibliographic Details
Main Authors: Marsono, Abdul Kadir, Md. Tap, Masine, Ng, Soon Ching, Makhtar, Ahmad Mahir
Format: Conference or Workshop Item
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/557/
http://eprints.utm.my/557/1/AbdulKadirMarsono2006_Simulationofindustrialisedbuildingsystemcomponents.pdf
_version_ 1848889947486945280
author Marsono, Abdul Kadir
Md. Tap, Masine
Ng, Soon Ching
Makhtar, Ahmad Mahir
author_facet Marsono, Abdul Kadir
Md. Tap, Masine
Ng, Soon Ching
Makhtar, Ahmad Mahir
author_sort Marsono, Abdul Kadir
building UTeM Institutional Repository
collection Online Access
description The construction of IBS building should starts with the production of the IBS components and the production process is the main activity concerned in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel mould is very important. In this study, workstation organization method has been adopted in the production of IBS component of beam and column. Witness 2001 simulation software has been used to model and simulate the most optimum production line set up. Here, two production lines set up have been proposed to complete the production of IBS beam and column between two and three months time with limited number of reusable steel mould to supply for the construction of medium size single storey IBS housing project ranging from 100 to 300 units. A contingency production line set up which able to complete the production of required IBS components within a month time with increased number of reusable steel mould has also been proposed. Number of resources such as workstation, tool, storage area and labour has been determined from the proposal. The proposed production line can be applied in the planning and cost estimating of IBS production plant set up.
first_indexed 2025-11-15T20:34:16Z
format Conference or Workshop Item
id utm-557
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:34:16Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling utm-5572017-06-22T04:14:33Z http://eprints.utm.my/557/ Simulation of Industrialised Building System components production Marsono, Abdul Kadir Md. Tap, Masine Ng, Soon Ching Makhtar, Ahmad Mahir TH Building construction The construction of IBS building should starts with the production of the IBS components and the production process is the main activity concerned in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel mould is very important. In this study, workstation organization method has been adopted in the production of IBS component of beam and column. Witness 2001 simulation software has been used to model and simulate the most optimum production line set up. Here, two production lines set up have been proposed to complete the production of IBS beam and column between two and three months time with limited number of reusable steel mould to supply for the construction of medium size single storey IBS housing project ranging from 100 to 300 units. A contingency production line set up which able to complete the production of required IBS components within a month time with increased number of reusable steel mould has also been proposed. Number of resources such as workstation, tool, storage area and labour has been determined from the proposal. The proposed production line can be applied in the planning and cost estimating of IBS production plant set up. 2006-09 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/557/1/AbdulKadirMarsono2006_Simulationofindustrialisedbuildingsystemcomponents.pdf Marsono, Abdul Kadir and Md. Tap, Masine and Ng, Soon Ching and Makhtar, Ahmad Mahir (2006) Simulation of Industrialised Building System components production. In: 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006), 5-6 September 2006, Kuala Lumpur, Malaysia. http://civil.utm.my/apsec2015/about-apsec/
spellingShingle TH Building construction
Marsono, Abdul Kadir
Md. Tap, Masine
Ng, Soon Ching
Makhtar, Ahmad Mahir
Simulation of Industrialised Building System components production
title Simulation of Industrialised Building System components production
title_full Simulation of Industrialised Building System components production
title_fullStr Simulation of Industrialised Building System components production
title_full_unstemmed Simulation of Industrialised Building System components production
title_short Simulation of Industrialised Building System components production
title_sort simulation of industrialised building system components production
topic TH Building construction
url http://eprints.utm.my/557/
http://eprints.utm.my/557/
http://eprints.utm.my/557/1/AbdulKadirMarsono2006_Simulationofindustrialisedbuildingsystemcomponents.pdf