Impact of unplanned schedule compression on project cost
The implementation of unplanned schedule compression is common in the construction environment. When necessary, contractors would need to select methods that also minimize the cost impact on the project. Unfortunately, a limited knowledge exists for determining the methods to be employed in mitigati...
| Main Authors: | Mansur, Shaiful Amri, Mohamad Zin, Rosli, Sea, E. N. |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/541/ http://eprints.utm.my/541/1/SAMansur2006_Impactofunplannedschedulecompression.pdf |
Similar Items
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)
by: Mohamad Zin, Rosli, et al.
Published: (2008)
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004)
by: Mansur, Shaiful Amri
Published: (2004)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
Comparative study in construction scheduling by using primavera P6 and microsoft project
by: Nor Farahin, Baharudin
Published: (2014)
by: Nor Farahin, Baharudin
Published: (2014)
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)
by: Rauzana, Anita
Published: (2015)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
Compressed concrete block using crushed laterite brick as sand substitution
by: Che Amri, Che Azmi
Published: (2012)
by: Che Amri, Che Azmi
Published: (2012)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Impact of Variation Orders on Time and Cost in Mega Hydropower
Projects of Pakistan
by: Hanif, Hashim, et al.
Published: (2016)
by: Hanif, Hashim, et al.
Published: (2016)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Productivity Assessment and Schedule Compression Index (PASCI) for project planning
by: Mansur, Shaiful Amri, et al.
Published: (2003)
by: Mansur, Shaiful Amri, et al.
Published: (2003)
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Identification Of Factors Influencing Costs In Green Projects
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
by: Zainul Abidin, Nazirah, et al.
Published: (2016)
Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
by: Lim, Celia Han Jia
Published: (2014)
by: Lim, Celia Han Jia
Published: (2014)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
The Impact of Material Management on Construction Project Delivery in Maldives
by: Zaha, Ahmed
Published: (2017)
by: Zaha, Ahmed
Published: (2017)
Understanding Management Roles and Organisational Behaviours
in Planning and Scheduling Based on Construction Projects in
Oman
by: Nasseri , Hammad Al, et al.
Published: (2016)
by: Nasseri , Hammad Al, et al.
Published: (2016)
Cost implication for a residential high-rise project to achieve certified level Green Building Index (GBI) rating.
by: Lai, Wei Chian
Published: (2013)
by: Lai, Wei Chian
Published: (2013)
Planning & scheduling by using Microsoft Project a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang"
by: Mohd Johari, Othman
Published: (2006)
by: Mohd Johari, Othman
Published: (2006)
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010)
by: Ameh, Oko John, et al.
Published: (2010)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Effect of mismanagement towards abandoned project in Malaysia
by: Saidah An'nisaa, Salam, et al.
Published: (2020)
by: Saidah An'nisaa, Salam, et al.
Published: (2020)
Reviewing and identifying the green criteria in relation to the building cost: project management
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Relation between density and compressive strength of foamed concrete
by: Rokiah, Othman, et al.
Published: (2021)
by: Rokiah, Othman, et al.
Published: (2021)
A study on impact of employee training on project performance in construction industry in Kota Bharu, Kelantan
by: Nik Alia Haifaa, Nik Adik
Published: (2014)
by: Nik Alia Haifaa, Nik Adik
Published: (2014)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
A review of important considerations in the compression molding process of short natural fiber composites
by: Jaafar, Jamiluddin, et al.
Published: (2019)
by: Jaafar, Jamiluddin, et al.
Published: (2019)
Axial compression behaviour of reinforced wallettes
fabricated using wood-wool cement panel
by: Md. Noh, M. S., et al.
Published: (2018)
by: Md. Noh, M. S., et al.
Published: (2018)
Process flow for work breakdown structure in plannning and scheduling : a comparative case study
by: Nurulzanna, Idris
Published: (2014)
by: Nurulzanna, Idris
Published: (2014)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
A Review of Porous Concrete Pavement: Compressive Strength and Clogging Investigation
by: Amminudin, Ab Latif, et al.
Published: (2023)
by: Amminudin, Ab Latif, et al.
Published: (2023)
Compressive strength of concrete containing eggshell powder as partial cement replacement
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
Time Delay and Cost Overrun of Road over Bridge (ROB)
Construction Projects in India
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
Similar Items
-
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008) -
Productivity assessment and schedule compression index for construction project planning
by: Mansur, Shaiful Amri
Published: (2004) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018) -
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014) -
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)