Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA

It is quite common phenomenon for government projects to experience delay. Numbers of studies been carried out to investigate the matter. The attitude of contractors possibly contributed to delay in project delivery. Similar attitude also significantly affecting MARA Educational projects. This study...

Full description

Bibliographic Details
Main Author: Alias, Idris
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/5056/
http://eprints.utm.my/5056/1/IdrisAliasMFKA2006.pdf
_version_ 1848890959524265984
author Alias, Idris
author_facet Alias, Idris
author_sort Alias, Idris
building UTeM Institutional Repository
collection Online Access
description It is quite common phenomenon for government projects to experience delay. Numbers of studies been carried out to investigate the matter. The attitude of contractors possibly contributed to delay in project delivery. Similar attitude also significantly affecting MARA Educational projects. This study explores sources of delay in the completions of MARA Educational projects. Conceptually, this study highlights three types of delay, compensable delay, excusable delay and nonexcusable delays. A survey on architects and project consulting for MARA projects had successful shown that for 14 educational projects, the most critical leading factors are increase in prices of materials and failure to comply to the working schedule. Additionally, shortage in professional team, unsystematic site management and delay in appointing sub contractor have also contributed to delay. As the analysis indicates that considered in granting Extension of Time (EOT) included infrastructure works, changes in design, material shortage and Variation Order (VO). It is clear that apart from weather and materials delays are contributed by contractors and client. Therefore MARA must ensure that only capable contractors will be appointed in MARA’s project undertaking. More importantly, MARA must be aware and consistent with theirs needs so as not to impose much changes during constructions. Thus a good cooperation is needed to ensure the successfully completed projects could be delivered and benefited by the community.
first_indexed 2025-11-15T20:50:21Z
format Thesis
id utm-5056
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:50:21Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling utm-50562018-02-28T06:51:08Z http://eprints.utm.my/5056/ Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA Alias, Idris TH Building construction TA Engineering (General). Civil engineering (General) It is quite common phenomenon for government projects to experience delay. Numbers of studies been carried out to investigate the matter. The attitude of contractors possibly contributed to delay in project delivery. Similar attitude also significantly affecting MARA Educational projects. This study explores sources of delay in the completions of MARA Educational projects. Conceptually, this study highlights three types of delay, compensable delay, excusable delay and nonexcusable delays. A survey on architects and project consulting for MARA projects had successful shown that for 14 educational projects, the most critical leading factors are increase in prices of materials and failure to comply to the working schedule. Additionally, shortage in professional team, unsystematic site management and delay in appointing sub contractor have also contributed to delay. As the analysis indicates that considered in granting Extension of Time (EOT) included infrastructure works, changes in design, material shortage and Variation Order (VO). It is clear that apart from weather and materials delays are contributed by contractors and client. Therefore MARA must ensure that only capable contractors will be appointed in MARA’s project undertaking. More importantly, MARA must be aware and consistent with theirs needs so as not to impose much changes during constructions. Thus a good cooperation is needed to ensure the successfully completed projects could be delivered and benefited by the community. 2006-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/5056/1/IdrisAliasMFKA2006.pdf Alias, Idris (2006) Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TH Building construction
TA Engineering (General). Civil engineering (General)
Alias, Idris
Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title_full Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title_fullStr Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title_full_unstemmed Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title_short Faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan MARA
title_sort faktor-faktor kelewatan dalam projek pembinaan bangunan pendidikan mara
topic TH Building construction
TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/5056/
http://eprints.utm.my/5056/1/IdrisAliasMFKA2006.pdf