The current practice and problems of contractual arrangement in construction industry

There are risks involved in any type of contract arrangement in any construction project. The most appropriate contract method for the project needed to ensure optimum efficiency in the future. The present tendency that numerous disputes are arising from contracts in the industry is an indication th...

Full description

Bibliographic Details
Main Author: Yow, Soon Keong
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/4606/
http://eprints.utm.my/4606/6/YowSoonKeongKPFKA2006.pdf
_version_ 1848890844957900800
author Yow, Soon Keong
author_facet Yow, Soon Keong
author_sort Yow, Soon Keong
building UTeM Institutional Repository
collection Online Access
description There are risks involved in any type of contract arrangement in any construction project. The most appropriate contract method for the project needed to ensure optimum efficiency in the future. The present tendency that numerous disputes are arising from contracts in the industry is an indication that aspect of the administration of contract needs to be strengthened. This project paper aims to determine the most prefer applicability and effectiveness of contracts in the industry. The methodologies used will consist of a literature review and questionnaire survey distributed to the prominent in the industry. The questionnaire survey for this study was using Likert Scale and the respondents would indicate how strong they agreed and disagreed with each question. The method of selecting respondents would be from the well known Group 1 ? Clients and developers, Group 2 ? Consultants and Group 3 ? Contractors and Sub-contractors working each other before and the unknown who is introduce through the recommendation of the above respondents. The paper briefly describes the types of contractual arrangement available and the criteria need to be considered in deciding the preferred contractual arrangement. The paper provides conclusions regarding the most appropriate contract arrangement and recommendations factors in selection of contractual arrangement to ensure optimum efficiency in the future.
first_indexed 2025-11-15T20:48:32Z
format Thesis
id utm-4606
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:48:32Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling utm-46062020-07-22T03:01:34Z http://eprints.utm.my/4606/ The current practice and problems of contractual arrangement in construction industry Yow, Soon Keong TA Engineering (General). Civil engineering (General) There are risks involved in any type of contract arrangement in any construction project. The most appropriate contract method for the project needed to ensure optimum efficiency in the future. The present tendency that numerous disputes are arising from contracts in the industry is an indication that aspect of the administration of contract needs to be strengthened. This project paper aims to determine the most prefer applicability and effectiveness of contracts in the industry. The methodologies used will consist of a literature review and questionnaire survey distributed to the prominent in the industry. The questionnaire survey for this study was using Likert Scale and the respondents would indicate how strong they agreed and disagreed with each question. The method of selecting respondents would be from the well known Group 1 ? Clients and developers, Group 2 ? Consultants and Group 3 ? Contractors and Sub-contractors working each other before and the unknown who is introduce through the recommendation of the above respondents. The paper briefly describes the types of contractual arrangement available and the criteria need to be considered in deciding the preferred contractual arrangement. The paper provides conclusions regarding the most appropriate contract arrangement and recommendations factors in selection of contractual arrangement to ensure optimum efficiency in the future. 2006-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/4606/6/YowSoonKeongKPFKA2006.pdf Yow, Soon Keong (2006) The current practice and problems of contractual arrangement in construction industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Yow, Soon Keong
The current practice and problems of contractual arrangement in construction industry
title The current practice and problems of contractual arrangement in construction industry
title_full The current practice and problems of contractual arrangement in construction industry
title_fullStr The current practice and problems of contractual arrangement in construction industry
title_full_unstemmed The current practice and problems of contractual arrangement in construction industry
title_short The current practice and problems of contractual arrangement in construction industry
title_sort current practice and problems of contractual arrangement in construction industry
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/4606/
http://eprints.utm.my/4606/6/YowSoonKeongKPFKA2006.pdf