Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia

Risk and uncertainty can potentially damage construction project. Hence, risk management is an important part in construction companies’ decision making process. It’s very useful for the parties involved in construction industry. This study reviews the housing industry and risk involved with a p...

Full description

Bibliographic Details
Main Author: Rusli, Norharnila
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/4601/
http://eprints.utm.my/4601/1/NorharnilaRusliMFKA2006.pdf
_version_ 1848890843610480640
author Rusli, Norharnila
author_facet Rusli, Norharnila
author_sort Rusli, Norharnila
building UTeM Institutional Repository
collection Online Access
description Risk and uncertainty can potentially damage construction project. Hence, risk management is an important part in construction companies’ decision making process. It’s very useful for the parties involved in construction industry. This study reviews the housing industry and risk involved with a particular reference to housing. Housing industry which is a part of construction industry is also exposed to various form of risk that may affect the project throughout the life cycle of the project. As abandoned projects can cause loss to customers, this study also reviews statistics on abandoned housing project in Malaysia. The interviews have been carried out and data have been collected from the Ministry of Local Government and Housing. The data includes the categories of abandoned project and factors that lead to the abandonment of the projects. The data was summarised using simple statistical methods. The finding of the study indicates that financial was the main risk in housing development. The study also highlights other significant risks upon which the findings of the study will provide a basis for strategies to minimise risks in housing projects.
first_indexed 2025-11-15T20:48:31Z
format Thesis
id utm-4601
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:48:31Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling utm-46012018-02-28T06:44:20Z http://eprints.utm.my/4601/ Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia Rusli, Norharnila TA Engineering (General). Civil engineering (General) Risk and uncertainty can potentially damage construction project. Hence, risk management is an important part in construction companies’ decision making process. It’s very useful for the parties involved in construction industry. This study reviews the housing industry and risk involved with a particular reference to housing. Housing industry which is a part of construction industry is also exposed to various form of risk that may affect the project throughout the life cycle of the project. As abandoned projects can cause loss to customers, this study also reviews statistics on abandoned housing project in Malaysia. The interviews have been carried out and data have been collected from the Ministry of Local Government and Housing. The data includes the categories of abandoned project and factors that lead to the abandonment of the projects. The data was summarised using simple statistical methods. The finding of the study indicates that financial was the main risk in housing development. The study also highlights other significant risks upon which the findings of the study will provide a basis for strategies to minimise risks in housing projects. 2006-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/4601/1/NorharnilaRusliMFKA2006.pdf Rusli, Norharnila (2006) Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Rusli, Norharnila
Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title_full Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title_fullStr Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title_full_unstemmed Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title_short Salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di Malaysia
title_sort salah urus risiko dalam projek pembangunan projek perumahan: kajian ke atas projek perumahan terbengkalai di malaysia
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/4601/
http://eprints.utm.my/4601/1/NorharnilaRusliMFKA2006.pdf