Scheduling on transportation for industrialized building systems
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...
| Main Author: | Foong, Kok Li |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/4582/ http://eprints.utm.my/4582/1/FoongKokLiMFKA2006.pdf |
Similar Items
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006)
by: Tay, Allan Eng Mian
Published: (2006)
Sales expense strategies for competitive pricing of industrial building system (IBS) components
by: Aziz, N. D., et al.
Published: (2021)
by: Aziz, N. D., et al.
Published: (2021)
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
The implementation of design and build procurement approach in local construction industry
by: Pang, Sheh Haur
Published: (2003)
by: Pang, Sheh Haur
Published: (2003)
Implementation strategy for industrialised building system
by: Lim, Pui Chung
Published: (2006)
by: Lim, Pui Chung
Published: (2006)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
Challenge of building information modelling (BIM) implementation in Malaysia AEC industry
by: Muhammad Khairul Anuar, Isa
Published: (2019)
by: Muhammad Khairul Anuar, Isa
Published: (2019)
A Study Of Steel Structure Design & Build System In Construction Industry
by: Sheng, Lee Kok
Published: (2015)
by: Sheng, Lee Kok
Published: (2015)
Special based isolation system for low-rise RC building
by: Hamid, N. H., et al.
Published: (2019)
by: Hamid, N. H., et al.
Published: (2019)
Effects Of Contractors’ Delay Factors On Building Project Performance Among Kuantan Malaysian Construction Industry
by: N.S.A, Samsudin, et al.
Published: (2020)
by: N.S.A, Samsudin, et al.
Published: (2020)
WELL building: Criteria for residential buildings in a developing country
by: Salma Husna, Zamani, et al.
Published: (2023)
by: Salma Husna, Zamani, et al.
Published: (2023)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
The implementation of industrialised building system in construction industry
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
The development of 3D model building information modelling (BIM) for commercial office building
by: Nur 'Atiqah, 'Ashri
Published: (2018)
by: Nur 'Atiqah, 'Ashri
Published: (2018)
Application of response surface methodology for chloride transport properties in nano metaclayed-UHPC
by: Mohd Faizal, Md Jaafar, et al.
Published: (2021)
by: Mohd Faizal, Md Jaafar, et al.
Published: (2021)
Building services in facility management
by: Nurul Shahira, Arbain
Published: (2018)
by: Nurul Shahira, Arbain
Published: (2018)
Assessing the vulnerability of Kota Kinabalu buildings
by: Noor Sheena Herayani, Harith, et al.
Published: (2021)
by: Noor Sheena Herayani, Harith, et al.
Published: (2021)
Lateral stability of high-rise building
by: Gan, Ming Ong
Published: (2005)
by: Gan, Ming Ong
Published: (2005)
Adoption of Building Information Modelling (BIM) on Railway Transportation Project in Malaysia
by: Ng, Wei Yean
Published: (2018)
by: Ng, Wei Yean
Published: (2018)
Significant usage of slab and wall form technique in industrialised building systems (IBS) for low cost highrise apartments construction
by: Abdul Rahman, Redzuan
Published: (2006)
by: Abdul Rahman, Redzuan
Published: (2006)
Study on economics of abandoned building in peninsular Malaysia
by: Muhamad Samrie, Sakkaran
Published: (2019)
by: Muhamad Samrie, Sakkaran
Published: (2019)
Solid waste management in building construction site
by: Juliana, Junaidi
Published: (2016)
by: Juliana, Junaidi
Published: (2016)
The evaluation of double story building considering earthquake
by: N., Rusli, et al.
Published: (2022)
by: N., Rusli, et al.
Published: (2022)
Study on lighting in office buildings Kuching area
by: Faizal, Abd. Rahman
Published: (2004)
by: Faizal, Abd. Rahman
Published: (2004)
Implementation of industrialised building system (BS) in Malaysia construction industry
by: Noorul Amimah, Ismail
Published: (2014)
by: Noorul Amimah, Ismail
Published: (2014)
Safety aspect in installation industrialized building system (IBS) component
by: Noor Yuhana, Maamor
Published: (2009)
by: Noor Yuhana, Maamor
Published: (2009)
WELL building: Key design features for office environments
by: Tan, Carmen Y. M., et al.
Published: (2023)
by: Tan, Carmen Y. M., et al.
Published: (2023)
Problems of building defects after handing over the key
by: Nur Darwani, Abd Rahman
Published: (2012)
by: Nur Darwani, Abd Rahman
Published: (2012)
Simulation of modular construction and cost analysis for the Martian building
by: Tung, Chee Fong
Published: (2024)
by: Tung, Chee Fong
Published: (2024)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Statistical characteristics for directional wind speed for design building structure
by: Nuraziatul Najwa, Rosli
Published: (2019)
by: Nuraziatul Najwa, Rosli
Published: (2019)
Seismic response of precast and IBS buildings under earthquake attacks
by: Hamid, N. H., et al.
Published: (2019)
by: Hamid, N. H., et al.
Published: (2019)
A multi-hazard risk assessment of buildings in Padang city
by: Mulyani, Rini, et al.
Published: (2015)
by: Mulyani, Rini, et al.
Published: (2015)
The consultancy fee for structural design changes of reinforced concrete buildings in Oman
by: Hamood Al-Harthy, Amur Salim
Published: (2006)
by: Hamood Al-Harthy, Amur Salim
Published: (2006)
Finite element analysis of office building steel structure by using ANSYS
by: Fathin Nur Ammalina, Norhasim
Published: (2018)
by: Fathin Nur Ammalina, Norhasim
Published: (2018)
Finite analysis of steel frame multi-storey building by using ANSYS
by: Lim, Yee Siang
Published: (2019)
by: Lim, Yee Siang
Published: (2019)
Applying problem-based learning in a building information modeling course
by: Abdul Rahimi, Abdul Rahman, et al.
Published: (2019)
by: Abdul Rahimi, Abdul Rahman, et al.
Published: (2019)
Study on factors that lead to the abandoned building project in Borneo (Sabah & Sarawak)
by: Izyana Jannati, Sabri
Published: (2019)
by: Izyana Jannati, Sabri
Published: (2019)
The earthquake effect of multi-storey building due to surrounding earthquake in Malaysia
by: Nuraziemah, Zainal
Published: (2016)
by: Nuraziemah, Zainal
Published: (2016)
Similar Items
-
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006) -
Sales expense strategies for competitive pricing of industrial building system (IBS) components
by: Aziz, N. D., et al.
Published: (2021) -
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018) -
The implementation of design and build procurement approach in local construction industry
by: Pang, Sheh Haur
Published: (2003) -
Implementation strategy for industrialised building system
by: Lim, Pui Chung
Published: (2006)