Nature of delay in nominated subcontracting
Construction delay is a results of occurrence beyond the control of either the contractor or the employer. Delay can be categorized as excusable, non-excusable, compensable and concurrent. There are many causes that can contribute delay in construction. However, delay in nominated subcontracting are...
| Main Author: | Nasid Masrom, Md. Asrul |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2007
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/4439/ http://eprints.utm.my/4439/1/MdAsrulNasidMFAB2007.pdf |
Similar Items
Perbandingan kepuasan penghuni terhadap penyelenggaraan fasiliti perumahan bertingkat di Pantai Dalam Kuala Lumpur
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020)
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020)
Penyelenggaraan struktur penahan cerun rock shed: langkah mitigasi runtuhan tanah di Simpang Pulai - Blue Valley, Perak
by: Abu Bakar, Nor Athirah, et al.
Published: (2020)
by: Abu Bakar, Nor Athirah, et al.
Published: (2020)
Kajian penyelenggaraan jalan raya disebabkan sink hole di Johor Bahru
by: Bahar, Mohd Dzul Nizam Assrens, et al.
Published: (2020)
by: Bahar, Mohd Dzul Nizam Assrens, et al.
Published: (2020)
Labour Subcontracting in the Construction Industries of Developing Countries:
An Assessment from Two Perspectives
by: Wells, Jill
Published: (2006)
by: Wells, Jill
Published: (2006)
Why do contractors subcontract work to subcontractors?
by: Abdul Rashid, Khairuddin
Published: (2012)
by: Abdul Rashid, Khairuddin
Published: (2012)
Assessing causes of contractual disputes from different type of condition of contracts
by: Che Haron, Roziha, et al.
Published: (2021)
by: Che Haron, Roziha, et al.
Published: (2021)
The impact of material management on construction project delivery in Somalia
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Causes of time delay in construction Sarawak, Malaysia
by: Harrison Yan, Rolland Duat
Published: (2014)
by: Harrison Yan, Rolland Duat
Published: (2014)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Case study on delay factors in steel bridge construction
by: Hazim Adly Harun, Harun
Published: (2015)
by: Hazim Adly Harun, Harun
Published: (2015)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Study of factors influencing construction delays at rural area in Malaysia
by: Ramli, M Z, et al.
Published: (2018)
by: Ramli, M Z, et al.
Published: (2018)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
A study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur
by: Yap, Qing Fu
Published: (2013)
by: Yap, Qing Fu
Published: (2013)
Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
by: T.J., Deepak, et al.
Published: (2017)
by: T.J., Deepak, et al.
Published: (2017)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Simulation of natural ventilation system in chemistry laboratory of faculty chemical and natural resources engineering lab building
by: Ruhama, Walled
Published: (2010)
by: Ruhama, Walled
Published: (2010)
A Dynamic Model Of Contractor-induced Delays In India
by: Das, Dillip Kumar, et al.
Published: (2017)
by: Das, Dillip Kumar, et al.
Published: (2017)
Causes of construction delay: a case study in Libya
by: Fackroon, Ellafi H., et al.
Published: (2008)
by: Fackroon, Ellafi H., et al.
Published: (2008)
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
Delay Mitigation in the Malaysian Housing Industry: A Structural
Equation Modelling Approach
by: Chang , Saar Chai, et al.
Published: (2015)
by: Chang , Saar Chai, et al.
Published: (2015)
An investigation on current green design practices towards net-zero energy buildings (NZEBs) application in Malaysia healthcare projects
by: Abdellah, Roy Hazli, et al.
Published: (2018)
by: Abdellah, Roy Hazli, et al.
Published: (2018)
Soil reinforcement with synthetic and natural fibres: a review
by: Tuan Ismail, Tuan Noor Hasanah, et al.
Published: (2020)
by: Tuan Ismail, Tuan Noor Hasanah, et al.
Published: (2020)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
Synthetic and Natural Fibrous Scaffolds for Soft Tissue Engineering Applications
by: Khoo, Weily, et al.
Published: (2017)
by: Khoo, Weily, et al.
Published: (2017)
Assessment of Influential Causes of Construction Project
Delay in Malaysian Private Housing from Developer’s
Viewpoint
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Dual phase role of composite adsorbents made from cockleshell and natural zeolite in treating river water
by: Siti Nur Fatihah, Moideen, et al.
Published: (2017)
by: Siti Nur Fatihah, Moideen, et al.
Published: (2017)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
A review of important considerations in the compression molding process of short natural fiber composites
by: Jaafar, Jamiluddin, et al.
Published: (2019)
by: Jaafar, Jamiluddin, et al.
Published: (2019)
Analysis Of Non-excusable Delay Factors Influencing Contractors'
Performance In Lagos State, Nigeria
by: Ibironke, Olajide Timothy, et al.
Published: (2013)
by: Ibironke, Olajide Timothy, et al.
Published: (2013)
Time Delay and Cost Overrun of Road over Bridge (ROB)
Construction Projects in India
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
Attitudes Of People In The Thai Construction Industry Sector
On Issues Related To Delay In The Approval Of Submittals
by: Chovichien, Visuth, et al.
Published: (2011)
by: Chovichien, Visuth, et al.
Published: (2011)
Similar Items
-
Perbandingan kepuasan penghuni terhadap penyelenggaraan fasiliti perumahan bertingkat di Pantai Dalam Kuala Lumpur
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020) -
Penyelenggaraan struktur penahan cerun rock shed: langkah mitigasi runtuhan tanah di Simpang Pulai - Blue Valley, Perak
by: Abu Bakar, Nor Athirah, et al.
Published: (2020) -
Kajian penyelenggaraan jalan raya disebabkan sink hole di Johor Bahru
by: Bahar, Mohd Dzul Nizam Assrens, et al.
Published: (2020) -
Labour Subcontracting in the Construction Industries of Developing Countries:
An Assessment from Two Perspectives
by: Wells, Jill
Published: (2006) -
Why do contractors subcontract work to subcontractors?
by: Abdul Rashid, Khairuddin
Published: (2012)