Development of unit commitment assessment technique based on Malaysia grid code requirement

Unit commitment is one of the pertinent analyses required in the scheduling and dispatch of power system. Various mathematical techniques have been developed to cater for the requirements of solving the unit commitment problems in power system. In scheduling of power generation, various requirements...

Full description

Bibliographic Details
Main Author: Hashim, Baharin
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/4436/
http://eprints.utm.my/4436/1/BaharinHashimMFKE2007.pdf
_version_ 1848890801566777344
author Hashim, Baharin
author_facet Hashim, Baharin
author_sort Hashim, Baharin
building UTeM Institutional Repository
collection Online Access
description Unit commitment is one of the pertinent analyses required in the scheduling and dispatch of power system. Various mathematical techniques have been developed to cater for the requirements of solving the unit commitment problems in power system. In scheduling of power generation, various requirements have been detailed out by countries in the forms of standards and codes. For Malaysian electricity sector, the process of scheduling and dispatch is governed by the requirements specified in the established Malaysia Grid Code 2006. This newly revised Code has detailed out the requirements and necessary procedure for the Unit Commitment process for the Malaysia electrical energy environment. The main objective of the project is to develop a systematic method in solving unit commitment problem in general and for Malaysia electricity sector in particular. The second objective is to utilize the method in order to minimize generating cost and at the same time fulfilling all the constraints related to the delivery of electrical energy from the generating companies to the consumers. The specific considerations to the requirements of the Malaysian Grid Code are fulfilling the scope of the project. The method has been programmed using Turbo Pascal language and tested on several test systems. The Dynamic Programming method has been chosen to solve the unit commitment process. The program has been successful applied to run the system base on Malaysia Grid Code requirement. The generations have been able to be optimized the operation of the system base on the load demand for the given day. The generating costs of the generation have been minimized besides fulfilling the load demands. Eventually, the program is capable to be used to analyze the Malaysia power system.
first_indexed 2025-11-15T20:47:51Z
format Thesis
id utm-4436
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:47:51Z
publishDate 2007
recordtype eprints
repository_type Digital Repository
spelling utm-44362018-01-28T07:07:12Z http://eprints.utm.my/4436/ Development of unit commitment assessment technique based on Malaysia grid code requirement Hashim, Baharin TK Electrical engineering. Electronics Nuclear engineering Unit commitment is one of the pertinent analyses required in the scheduling and dispatch of power system. Various mathematical techniques have been developed to cater for the requirements of solving the unit commitment problems in power system. In scheduling of power generation, various requirements have been detailed out by countries in the forms of standards and codes. For Malaysian electricity sector, the process of scheduling and dispatch is governed by the requirements specified in the established Malaysia Grid Code 2006. This newly revised Code has detailed out the requirements and necessary procedure for the Unit Commitment process for the Malaysia electrical energy environment. The main objective of the project is to develop a systematic method in solving unit commitment problem in general and for Malaysia electricity sector in particular. The second objective is to utilize the method in order to minimize generating cost and at the same time fulfilling all the constraints related to the delivery of electrical energy from the generating companies to the consumers. The specific considerations to the requirements of the Malaysian Grid Code are fulfilling the scope of the project. The method has been programmed using Turbo Pascal language and tested on several test systems. The Dynamic Programming method has been chosen to solve the unit commitment process. The program has been successful applied to run the system base on Malaysia Grid Code requirement. The generations have been able to be optimized the operation of the system base on the load demand for the given day. The generating costs of the generation have been minimized besides fulfilling the load demands. Eventually, the program is capable to be used to analyze the Malaysia power system. 2007-05 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/4436/1/BaharinHashimMFKE2007.pdf Hashim, Baharin (2007) Development of unit commitment assessment technique based on Malaysia grid code requirement. Masters thesis, Universiti Teknologi Malaysia, Faculty of Electrical Engineering.
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Hashim, Baharin
Development of unit commitment assessment technique based on Malaysia grid code requirement
title Development of unit commitment assessment technique based on Malaysia grid code requirement
title_full Development of unit commitment assessment technique based on Malaysia grid code requirement
title_fullStr Development of unit commitment assessment technique based on Malaysia grid code requirement
title_full_unstemmed Development of unit commitment assessment technique based on Malaysia grid code requirement
title_short Development of unit commitment assessment technique based on Malaysia grid code requirement
title_sort development of unit commitment assessment technique based on malaysia grid code requirement
topic TK Electrical engineering. Electronics Nuclear engineering
url http://eprints.utm.my/4436/
http://eprints.utm.my/4436/1/BaharinHashimMFKE2007.pdf