Predicting the performance of design-bid-build projects: a neural-network based approach

Several studies had shown that many project managers are facing difficulties in predicting the performance of Design- bid-build (DBB) projects. This is due to the fact that there are many factors that affect DBB project success. This research is carried out to identify these factors. In addition, a...

Full description

Bibliographic Details
Main Author: Tan, Caren Cai Loon
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/3837/
http://eprints.utm.my/3837/1/TanCaiLoonMFKA2006.pdf
_version_ 1848890657597292544
author Tan, Caren Cai Loon
author_facet Tan, Caren Cai Loon
author_sort Tan, Caren Cai Loon
building UTeM Institutional Repository
collection Online Access
description Several studies had shown that many project managers are facing difficulties in predicting the performance of Design- bid-build (DBB) projects. This is due to the fact that there are many factors that affect DBB project success. This research is carried out to identify these factors. In addition, a model to predict the performance of DBB project was developed based on time. Through literature research, a total of forty-four factors that affect DBB project success had been established. The degree of importance for these factors had been determined through questionnaire survey. Eight out of forty-four factors that affecting project performance were found to be the most important factors ITom the viewpoint of project managers and contractors in the Malaysia construction industry. The outcome of the survey formed a basis for the model development. Artificial neural network (ANN) technique is used to construct the models to predict construction project performance based on time. The best performance model was the multiplayer back-propagation neural network model, which consisted of eight input nodes, five hidden nodes and three output nodes. These models were tested by using data ITom nine new projects. The results indicated that the developed model can give a good prediction. In this study, it was concluded that the ANN prediction model can be an efficient tool for predicting the performance ofDBB project from the time aspect.
first_indexed 2025-11-15T20:45:33Z
format Thesis
id utm-3837
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:45:33Z
publishDate 2006
recordtype eprints
repository_type Digital Repository
spelling utm-38372018-01-10T08:31:40Z http://eprints.utm.my/3837/ Predicting the performance of design-bid-build projects: a neural-network based approach Tan, Caren Cai Loon TA Engineering (General). Civil engineering (General) Several studies had shown that many project managers are facing difficulties in predicting the performance of Design- bid-build (DBB) projects. This is due to the fact that there are many factors that affect DBB project success. This research is carried out to identify these factors. In addition, a model to predict the performance of DBB project was developed based on time. Through literature research, a total of forty-four factors that affect DBB project success had been established. The degree of importance for these factors had been determined through questionnaire survey. Eight out of forty-four factors that affecting project performance were found to be the most important factors ITom the viewpoint of project managers and contractors in the Malaysia construction industry. The outcome of the survey formed a basis for the model development. Artificial neural network (ANN) technique is used to construct the models to predict construction project performance based on time. The best performance model was the multiplayer back-propagation neural network model, which consisted of eight input nodes, five hidden nodes and three output nodes. These models were tested by using data ITom nine new projects. The results indicated that the developed model can give a good prediction. In this study, it was concluded that the ANN prediction model can be an efficient tool for predicting the performance ofDBB project from the time aspect. 2006-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/3837/1/TanCaiLoonMFKA2006.pdf Tan, Caren Cai Loon (2006) Predicting the performance of design-bid-build projects: a neural-network based approach. Masters thesis, Universiti Teknologi Malaysia.
spellingShingle TA Engineering (General). Civil engineering (General)
Tan, Caren Cai Loon
Predicting the performance of design-bid-build projects: a neural-network based approach
title Predicting the performance of design-bid-build projects: a neural-network based approach
title_full Predicting the performance of design-bid-build projects: a neural-network based approach
title_fullStr Predicting the performance of design-bid-build projects: a neural-network based approach
title_full_unstemmed Predicting the performance of design-bid-build projects: a neural-network based approach
title_short Predicting the performance of design-bid-build projects: a neural-network based approach
title_sort predicting the performance of design-bid-build projects: a neural-network based approach
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/3837/
http://eprints.utm.my/3837/1/TanCaiLoonMFKA2006.pdf