A case study on the management of UTM new hostel based on design and build arrangement
This study attempts to get the insight into the management design and build of UTM hostel. The objectives of the research are to identify the dominant procurement system in Malaysia, to study the management of design and build in UTM and to identify problems in UTM’s project related to design and...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2005
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/3806/ http://eprints.utm.my/3806/1/NurulHidayahMohamedMFKA2005.pdf |
| _version_ | 1848890651264942080 |
|---|---|
| author | Mohamed, Nurul Hidayati |
| author_facet | Mohamed, Nurul Hidayati |
| author_sort | Mohamed, Nurul Hidayati |
| building | UTeM Institutional Repository |
| collection | Online Access |
| description | This study attempts to get the insight into the management design and build of UTM hostel. The objectives of the research are to identify the dominant procurement system in Malaysia, to study the management of design and build in UTM and to identify problems in UTM’s project related to design and build. This can be achieved by semi-structured interviews, unstructured discussion and questionnaires to garner a better understanding. This paper covers the traditional system is the most dominant procurement system in Malaysia followed by design and build and management contracting. While the management of the UTM hostel project was conducted fully by the project management consultant from the initial until the completion of the project and the main contractor was acted as the construction manager. The client just observed the activities and get involved when there is changes in cost and contract. The analysis of the problems encountered provides lessons to be learned for application to future projects. |
| first_indexed | 2025-11-15T20:45:27Z |
| format | Thesis |
| id | utm-3806 |
| institution | Universiti Teknologi Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T20:45:27Z |
| publishDate | 2005 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | utm-38062018-01-10T07:54:20Z http://eprints.utm.my/3806/ A case study on the management of UTM new hostel based on design and build arrangement Mohamed, Nurul Hidayati TA Engineering (General). Civil engineering (General) This study attempts to get the insight into the management design and build of UTM hostel. The objectives of the research are to identify the dominant procurement system in Malaysia, to study the management of design and build in UTM and to identify problems in UTM’s project related to design and build. This can be achieved by semi-structured interviews, unstructured discussion and questionnaires to garner a better understanding. This paper covers the traditional system is the most dominant procurement system in Malaysia followed by design and build and management contracting. While the management of the UTM hostel project was conducted fully by the project management consultant from the initial until the completion of the project and the main contractor was acted as the construction manager. The client just observed the activities and get involved when there is changes in cost and contract. The analysis of the problems encountered provides lessons to be learned for application to future projects. 2005-10 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/3806/1/NurulHidayahMohamedMFKA2005.pdf Mohamed, Nurul Hidayati (2005) A case study on the management of UTM new hostel based on design and build arrangement. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. |
| spellingShingle | TA Engineering (General). Civil engineering (General) Mohamed, Nurul Hidayati A case study on the management of UTM new hostel based on design and build arrangement |
| title | A case study on the management of UTM new hostel based on design and build arrangement |
| title_full | A case study on the management of UTM new hostel based on design and build arrangement |
| title_fullStr | A case study on the management of UTM new hostel based on design and build arrangement |
| title_full_unstemmed | A case study on the management of UTM new hostel based on design and build arrangement |
| title_short | A case study on the management of UTM new hostel based on design and build arrangement |
| title_sort | case study on the management of utm new hostel based on design and build arrangement |
| topic | TA Engineering (General). Civil engineering (General) |
| url | http://eprints.utm.my/3806/ http://eprints.utm.my/3806/1/NurulHidayahMohamedMFKA2005.pdf |