Resource-driven scheduling : barriers to implementation

Resource-driven scheduling techniques focus on resource. Their objective is to schedule activities so that a project deadline is met using predefined resource availability limits. This research was carried out to investigate the method of project scheduling being adopted in the construction industry...

Full description

Bibliographic Details
Main Author: Hameed, Aftab
Format: Thesis
Language:English
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/3477/
http://eprints.utm.my/3477/1/AftabHameedMFKA2005.pdf
_version_ 1848890580181975040
author Hameed, Aftab
author_facet Hameed, Aftab
author_sort Hameed, Aftab
building UTeM Institutional Repository
collection Online Access
description Resource-driven scheduling techniques focus on resource. Their objective is to schedule activities so that a project deadline is met using predefined resource availability limits. This research was carried out to investigate the method of project scheduling being adopted in the construction industry, the status, factors affecting and barriers to implementation of resource-driven scheduling implementation in Malaysian construction industry. Survey was conducted to determine the level of resource-driven scheduling and factors affecting the concerned implementation. Construction Firms registered under G7 (A Class), G6 (B class) and G5 (C class) were used in the investigation. It is significant 59.6 percent firms are implementing resource-driven scheduling partially. The methods of project scheduling and resource options adopted were also investigated. A significant majority of construction firms (approximately 65%) adopted Microsoft project for scheduling. The research also focused on the barriers to implementation of resource-driven scheduling in construction projects. Lack of knowledge, no training session, budget allocation and uncertainty value were found very significant barriers
first_indexed 2025-11-15T20:44:20Z
format Thesis
id utm-3477
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:44:20Z
publishDate 2005
recordtype eprints
repository_type Digital Repository
spelling utm-34772018-06-26T07:56:30Z http://eprints.utm.my/3477/ Resource-driven scheduling : barriers to implementation Hameed, Aftab TA Engineering (General). Civil engineering (General) Resource-driven scheduling techniques focus on resource. Their objective is to schedule activities so that a project deadline is met using predefined resource availability limits. This research was carried out to investigate the method of project scheduling being adopted in the construction industry, the status, factors affecting and barriers to implementation of resource-driven scheduling implementation in Malaysian construction industry. Survey was conducted to determine the level of resource-driven scheduling and factors affecting the concerned implementation. Construction Firms registered under G7 (A Class), G6 (B class) and G5 (C class) were used in the investigation. It is significant 59.6 percent firms are implementing resource-driven scheduling partially. The methods of project scheduling and resource options adopted were also investigated. A significant majority of construction firms (approximately 65%) adopted Microsoft project for scheduling. The research also focused on the barriers to implementation of resource-driven scheduling in construction projects. Lack of knowledge, no training session, budget allocation and uncertainty value were found very significant barriers 2005-10 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/3477/1/AftabHameedMFKA2005.pdf Hameed, Aftab (2005) Resource-driven scheduling : barriers to implementation. Masters thesis, University Teknologi Malaysia, Faculty Of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Hameed, Aftab
Resource-driven scheduling : barriers to implementation
title Resource-driven scheduling : barriers to implementation
title_full Resource-driven scheduling : barriers to implementation
title_fullStr Resource-driven scheduling : barriers to implementation
title_full_unstemmed Resource-driven scheduling : barriers to implementation
title_short Resource-driven scheduling : barriers to implementation
title_sort resource-driven scheduling : barriers to implementation
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/3477/
http://eprints.utm.my/3477/1/AftabHameedMFKA2005.pdf