Penyediaan indeks kos bangunan

The development of tender price index for housing is necessary as guidance for. quantity surveyors in estimating the tender price for housing projects. This research was executed to generate the tender price index for housing. The Jadual Kadar Harga Jabatan Keija Raya (JKR) 2001 (JKR 20800-117-2001)...

Full description

Bibliographic Details
Main Authors: Khalid, Abdul Ghani, M. Yusof, Zakaria, A. Hamid, Razali, Misnan, Mohd. Saidin
Format: Monograph
Language:English
Published: Universiti Teknologi Malaysia 2003
Subjects:
Online Access:http://eprints.utm.my/2888/
http://eprints.utm.my/2888/1/68854.pdf
_version_ 1848890458388824064
author Khalid, Abdul Ghani
M. Yusof, Zakaria
A. Hamid, Razali
Misnan, Mohd. Saidin
author_facet Khalid, Abdul Ghani
M. Yusof, Zakaria
A. Hamid, Razali
Misnan, Mohd. Saidin
author_sort Khalid, Abdul Ghani
building UTeM Institutional Repository
collection Online Access
description The development of tender price index for housing is necessary as guidance for. quantity surveyors in estimating the tender price for housing projects. This research was executed to generate the tender price index for housing. The Jadual Kadar Harga Jabatan Keija Raya (JKR) 2001 (JKR 20800-117-2001) was used as a base year. This is caused by the lack of data collected which is compulsory to develop the base rate of 2001. The base index value for the year of 2001 was assumed to be 100. The Methodology of Construction of Tender Price Index and Work Example, Building Cost Information Centre, Institution of Surveyor, Malaysia (ISM was applied with some modifications including the arrangement of elements in accordance to Elemental Cost Analysis and excluding the external works element. The Bill of Quantity of a double storey terrace house for the year of 1999 utilized as a sample to demonstrate the index calculations. Analysis on the intermediate unit of a double storey terrace house projects in the year of 1997 to 2000 have been executed and a tender price indices was successfully developed. The result shows that the price of a tender can be affected by the economics strength of the country.
first_indexed 2025-11-15T20:42:23Z
format Monograph
id utm-2888
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:42:23Z
publishDate 2003
publisher Universiti Teknologi Malaysia
recordtype eprints
repository_type Digital Repository
spelling utm-28882017-07-26T07:03:34Z http://eprints.utm.my/2888/ Penyediaan indeks kos bangunan Khalid, Abdul Ghani M. Yusof, Zakaria A. Hamid, Razali Misnan, Mohd. Saidin TH Building construction The development of tender price index for housing is necessary as guidance for. quantity surveyors in estimating the tender price for housing projects. This research was executed to generate the tender price index for housing. The Jadual Kadar Harga Jabatan Keija Raya (JKR) 2001 (JKR 20800-117-2001) was used as a base year. This is caused by the lack of data collected which is compulsory to develop the base rate of 2001. The base index value for the year of 2001 was assumed to be 100. The Methodology of Construction of Tender Price Index and Work Example, Building Cost Information Centre, Institution of Surveyor, Malaysia (ISM was applied with some modifications including the arrangement of elements in accordance to Elemental Cost Analysis and excluding the external works element. The Bill of Quantity of a double storey terrace house for the year of 1999 utilized as a sample to demonstrate the index calculations. Analysis on the intermediate unit of a double storey terrace house projects in the year of 1997 to 2000 have been executed and a tender price indices was successfully developed. The result shows that the price of a tender can be affected by the economics strength of the country. Universiti Teknologi Malaysia 2003-07-01 Monograph NonPeerReviewed application/pdf en http://eprints.utm.my/2888/1/68854.pdf Khalid, Abdul Ghani and M. Yusof, Zakaria and A. Hamid, Razali and Misnan, Mohd. Saidin (2003) Penyediaan indeks kos bangunan. Project Report. Universiti Teknologi Malaysia, Universiti Teknologi Malaysia. (Unpublished)
spellingShingle TH Building construction
Khalid, Abdul Ghani
M. Yusof, Zakaria
A. Hamid, Razali
Misnan, Mohd. Saidin
Penyediaan indeks kos bangunan
title Penyediaan indeks kos bangunan
title_full Penyediaan indeks kos bangunan
title_fullStr Penyediaan indeks kos bangunan
title_full_unstemmed Penyediaan indeks kos bangunan
title_short Penyediaan indeks kos bangunan
title_sort penyediaan indeks kos bangunan
topic TH Building construction
url http://eprints.utm.my/2888/
http://eprints.utm.my/2888/1/68854.pdf