Identifying energy saving opportunities in a process plant through preliminary energy audit

Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope...

Full description

Bibliographic Details
Main Author: Abdul Manan, Zainuddin
Format: Article
Language:English
Published: Penerbit UTM Press 2003
Subjects:
Online Access:http://eprints.utm.my/1452/
http://eprints.utm.my/1452/1/JT38A%5B4%5D.pdf
_version_ 1848890140752084992
author Abdul Manan, Zainuddin
author_facet Abdul Manan, Zainuddin
author_sort Abdul Manan, Zainuddin
building UTeM Institutional Repository
collection Online Access
description Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented.
first_indexed 2025-11-15T20:37:21Z
format Article
id utm-1452
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:37:21Z
publishDate 2003
publisher Penerbit UTM Press
recordtype eprints
repository_type Digital Repository
spelling utm-14522017-11-01T04:17:40Z http://eprints.utm.my/1452/ Identifying energy saving opportunities in a process plant through preliminary energy audit Abdul Manan, Zainuddin TD Environmental technology. Sanitary engineering Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented. Penerbit UTM Press 2003-06 Article PeerReviewed application/pdf en http://eprints.utm.my/1452/1/JT38A%5B4%5D.pdf Abdul Manan, Zainuddin (2003) Identifying energy saving opportunities in a process plant through preliminary energy audit. Jurnal Teknologi A (38A). pp. 37-48. ISSN 0127-9696 http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf
spellingShingle TD Environmental technology. Sanitary engineering
Abdul Manan, Zainuddin
Identifying energy saving opportunities in a process plant through preliminary energy audit
title Identifying energy saving opportunities in a process plant through preliminary energy audit
title_full Identifying energy saving opportunities in a process plant through preliminary energy audit
title_fullStr Identifying energy saving opportunities in a process plant through preliminary energy audit
title_full_unstemmed Identifying energy saving opportunities in a process plant through preliminary energy audit
title_short Identifying energy saving opportunities in a process plant through preliminary energy audit
title_sort identifying energy saving opportunities in a process plant through preliminary energy audit
topic TD Environmental technology. Sanitary engineering
url http://eprints.utm.my/1452/
http://eprints.utm.my/1452/
http://eprints.utm.my/1452/1/JT38A%5B4%5D.pdf