Minimizing variation order on construction project due to design change
There are several issues frequently exist in the process of project implementation in Malaysia. Those issues typically affect the project performance through the occurrence of variation order during the construction phase and resulting in cost overrun and delays in project completion. Nowadays varia...
| Main Author: | Hamdan, Hazrin |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/1411/ http://eprints.utm.my/1411/1/HazrinHamdanMFKA2012.pdf |
Similar Items
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
by: Ibrahim, Nor Hayati
Published: (2006)
by: Ibrahim, Nor Hayati
Published: (2006)
Variation orders in transmission projects of Tenaga Nasional Berhad
by: Abdul Kudus, Baharuddin
Published: (2005)
by: Abdul Kudus, Baharuddin
Published: (2005)
A Framework Design for Construction Waste Minimization In Malaysia
by: Lew, Kar Hui
Published: (2021)
by: Lew, Kar Hui
Published: (2021)
A Study On Variations In Sewerage Construction Projects
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
The role of building information modelling design application in mitigating the variation order in Jordanian construction industry
by: Ja’far, Al-Diabat Al-Btoosht
Published: (2018)
by: Ja’far, Al-Diabat Al-Btoosht
Published: (2018)
A study on the causes of design changes effecting the construction project performance
by: Nur Arfahanem, Mohamad Umpandi
Published: (2016)
by: Nur Arfahanem, Mohamad Umpandi
Published: (2016)
Evaluation Of Post EIA : Water Quality Due To The Construction Of The Sungai Kinta Dam Project, Perak
by: Ishak, Nurfaizahwati
Published: (2006)
by: Ishak, Nurfaizahwati
Published: (2006)
Tensile strength variation of pre-strained aluminium alloy due to annealing
by: Afdila, Aziz
Published: (2007)
by: Afdila, Aziz
Published: (2007)
Waste minimization by recycling construction waste
by: Mohamad Shariff, Ramli
Published: (2012)
by: Mohamad Shariff, Ramli
Published: (2012)
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
by: Btoush, Mohammed, et al.
Published: (2017)
by: Btoush, Mohammed, et al.
Published: (2017)
Increment of material usage in construction of four storey reinforced concrete building due to seismic design
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
by: Putra Jaya, Ramadhansyah, et al.
Published: (2021)
Deformation of wood in compression due to moisture content changes
by: Chew, Meng Yew
Published: (2006)
by: Chew, Meng Yew
Published: (2006)
Strength variation of pre-strain aluminium alloys (axial compression) due to isochronal annealing
by: Jantie, Beatrice Connie
Published: (2007)
by: Jantie, Beatrice Connie
Published: (2007)
Strength variation of pre-strained (transverse compressive) aluminium alloy due to isochronal annealing
by: Liza, Ranggi
Published: (2007)
by: Liza, Ranggi
Published: (2007)
Investigation Of Structural Behavior of Selected Timber Species Due To Moisture Changes
by: Abu Bakar, Badorul Hisham, et al.
Published: (2013)
by: Abu Bakar, Badorul Hisham, et al.
Published: (2013)
Strategies in Minimizing Dependency on Foreign Workers in Malaysian Construction Industry
by: Lim, Cai Xuan
Published: (2021)
by: Lim, Cai Xuan
Published: (2021)
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
by: C.T, Ramanathan, et al.
Published: (2009)
by: C.T, Ramanathan, et al.
Published: (2009)
Key drivers for adopting design-build in public construction projects: Malaysian perspective
by: Zheng, Ping Lee, et al.
Published: (2021)
by: Zheng, Ping Lee, et al.
Published: (2021)
Integration of circular economy into design and construction of infrastructure projects in Malaysia: Barriers and countermeasures
by: Nor Helmie Shahreen, Mohd Ali, et al.
Published: (2024)
by: Nor Helmie Shahreen, Mohd Ali, et al.
Published: (2024)
Causes of Construction Wastes and Capabilities of Building Information Modelling (BIM) in Minimizing the Wastes
by: Kong, Sio Kah, et al.
Published: (2020)
by: Kong, Sio Kah, et al.
Published: (2020)
A Study on the Common Variation Occuring in the Residental Projects in Malaysia
by: Chia, Yuan Heng
Published: (2015)
by: Chia, Yuan Heng
Published: (2015)
Study of deserted construction projects in Malaysia
by: Nazratul Izzana, Ishak
Published: (2015)
by: Nazratul Izzana, Ishak
Published: (2015)
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014)
by: Sorooshian, Shahryar
Published: (2014)
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
Impacts of poor management on construction project in Malaysia
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
Factors effecting the cost management in construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
To review the effectiveness of project management in construction process
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
Determination of Earthquake Design Ratio for Fixed Offshore Platform Due to Aceh Earthquake in Malaysia
by: Saffuan, Wan Ahmad, et al.
Published: (2017)
by: Saffuan, Wan Ahmad, et al.
Published: (2017)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
Factors Affecting Concrete Recycling Adoption in the Construction Projects
by: Badraddin, A. K., et al.
Published: (2021)
by: Badraddin, A. K., et al.
Published: (2021)
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019)
by: A. M., Faten Albtoush, et al.
Published: (2019)
Risk factors affecting the construction projects in the developing countries
by: R. A., Bahamid, et al.
Published: (2019)
by: R. A., Bahamid, et al.
Published: (2019)
Exploitation of contract document for construction project planning and controlling
by: Ali, Aminudin
Published: (2006)
by: Ali, Aminudin
Published: (2006)
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006)
by: Ahmed Memon, Zubair, et al.
Published: (2006)
Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
by: Syahir Amri, Musa
Published: (2014)
by: Syahir Amri, Musa
Published: (2014)
The Masar Project: Design and Development
by: Koo, Voon Chet, et al.
Published: (2005)
by: Koo, Voon Chet, et al.
Published: (2005)
Projection the future changes of rainfall and temperature at Pahang state
by: Nur Hanani Farhah, Mohd Hilmi
Published: (2016)
by: Nur Hanani Farhah, Mohd Hilmi
Published: (2016)
Comparison On Success Factors Over The Malaysian And Mauritian Constructions Projects
by: Yashweenee, Bundhun
Published: (2018)
by: Yashweenee, Bundhun
Published: (2018)
Similar Items
-
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017) -
Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
by: Ibrahim, Nor Hayati
Published: (2006) -
Variation orders in transmission projects of Tenaga Nasional Berhad
by: Abdul Kudus, Baharuddin
Published: (2005) -
A Framework Design for Construction Waste Minimization In Malaysia
by: Lew, Kar Hui
Published: (2021) -
A Study On Variations In Sewerage Construction Projects
by: Kassim, Mohd. Azraai, et al.
Published: (2002)