Computerised building cost estimating system
Estimating is an important process in order to prepare cost estimating for a proposed project. Cost estimate will give client an overview towards the total cost needed to be spent based on design. Due to the importance of the cost estimate for a proposed project, the utilization of computer to prepa...
| Main Author: | Marjuki, Mofti |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/1354/ http://eprints.utm.my/1354/1/MoftiMarjukiMFKA2006.pdf |
Similar Items
Identification of Critical Variables in Cost Estimating for Building Conservation Works.
by: Lim , Yoke Mui
by: Lim , Yoke Mui
Hidden Cost In Building Conservation Works
by: Wee, Li Woon
Published: (2011)
by: Wee, Li Woon
Published: (2011)
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)
by: Rauzana, Anita
Published: (2015)
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
The Mediating Effect Of Innovation Culture In Computerised Accounting Information System (Cais) Implementation Factors Towards Construction Companies Performance In Iraq
by: Al Hashmy, Hisham Noori Hussain
Published: (2023)
by: Al Hashmy, Hisham Noori Hussain
Published: (2023)
Literature review on green cost premium of sustainable building construction
by: Mat Russ, Nazirah, et al.
Published: (2018)
by: Mat Russ, Nazirah, et al.
Published: (2018)
Identifying methodology to investigate cost data input in life cycle cost analysis of a building
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Competency-driven benefits realization model for minimization of post-contract transaction costs in design-build (d&b) delivery systems
by: Raji, Abdulazeez Umar
Published: (2017)
by: Raji, Abdulazeez Umar
Published: (2017)
The development of cost estimation model for Indonesian state building: The case of West Sumatera province / Dwi Fitra Yenti Jumas
by: Dwi Fitra Yenti, Jumas
Published: (2019)
by: Dwi Fitra Yenti, Jumas
Published: (2019)
Quality and satisfaction of house owners for industrialised building system and conventional building system
by: Mohammad, Hairuddin
Published: (2009)
by: Mohammad, Hairuddin
Published: (2009)
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Project cost performance forecasting system
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
by: Mohd. Nasira, Siti Rashidah, et al.
Published: (2006)
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
by: Mohd Azrai, Azman
Published: (2012)
by: Mohd Azrai, Azman
Published: (2012)
Possibilities of using void to improve natural cross ventilation in high-rise low-cost residential building
by: Sapian, Abdul Razak
Published: (2004)
by: Sapian, Abdul Razak
Published: (2004)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Building structure works estimation program – BEST’s
by: Mohd Sarman, Asmawan, et al.
Published: (2008)
by: Mohd Sarman, Asmawan, et al.
Published: (2008)
Security determinants in building automation system
by: Shuib, Mohd Syamsyul, et al.
Published: (2017)
by: Shuib, Mohd Syamsyul, et al.
Published: (2017)
Urban Self-building Labour Cost Modelling In Cameroon
by: Manjia, Marcelline, et al.
Published: (2011)
by: Manjia, Marcelline, et al.
Published: (2011)
Cost implication for a residential high-rise project to achieve certified level Green Building Index (GBI) rating.
by: Lai, Wei Chian
Published: (2013)
by: Lai, Wei Chian
Published: (2013)
Simulation of Industrialised Building System components production
by: Marsono, Abdul Kadir, et al.
Published: (2006)
by: Marsono, Abdul Kadir, et al.
Published: (2006)
The implementation of industrialised building system in construction industry
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)
The application of industrialised building system in residential project
by: Syazana, Abdul Aziz
Published: (2010)
by: Syazana, Abdul Aziz
Published: (2010)
Factors Affecting Building Security Cost In Nigerian Urban Environment
by: Anifowose , Opeyemi Maroof
Published: (2016)
by: Anifowose , Opeyemi Maroof
Published: (2016)
Factors Affecting The Accuracy Of Pre-tender Cost Estimates In The
Gaza Strip
by: Enshassi, Adnan, et al.
Published: (2013)
by: Enshassi, Adnan, et al.
Published: (2013)
Issues and challenges in the implementation of Industrialised Building Systems in Malaysia
by: Abd. Rahman, Ahmad Baharuddin, et al.
Published: (2006)
by: Abd. Rahman, Ahmad Baharuddin, et al.
Published: (2006)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Cost comparison between the construction of conventional method and interlocking block system
by: Nik Farahiyah , Nik Mohamed
Published: (2014)
by: Nik Farahiyah , Nik Mohamed
Published: (2014)
Reviewing and identifying the green criteria in relation to the building cost: project management
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
BIM backed decision support system in the management of heritage building
by: Mustafa, Muhammad Hadi, et al.
Published: (2019)
by: Mustafa, Muhammad Hadi, et al.
Published: (2019)
Implementation of industrialised building system (BS) in Malaysia construction industry
by: Noorul Amimah, Ismail
Published: (2014)
by: Noorul Amimah, Ismail
Published: (2014)
Application of industrialised building system in school project in Malaysia: the challenge
by: Mohd. Aizad, Johari
Published: (2013)
by: Mohd. Aizad, Johari
Published: (2013)
Safety aspect in installation industrialized building system (IBS) component
by: Noor Yuhana, Maamor
Published: (2009)
by: Noor Yuhana, Maamor
Published: (2009)
The assessment of building defects maintenance in hospital building
by: Nordiyana, Ab.llah
Published: (2010)
by: Nordiyana, Ab.llah
Published: (2010)
A Study Of Steel Structure Design & Build System In Construction Industry
by: Sheng, Lee Kok
Published: (2015)
by: Sheng, Lee Kok
Published: (2015)
A Prospective Study on Building Quality: Relationship
between Workmanship Quality and Common Building
Defects of Low-cost Construction Projects
by: Othuman Mydin, M.A., et al.
Published: (2014)
by: Othuman Mydin, M.A., et al.
Published: (2014)
Similar Items
-
Identification of Critical Variables in Cost Estimating for Building Conservation Works.
by: Lim , Yoke Mui -
Hidden Cost In Building Conservation Works
by: Wee, Li Woon
Published: (2011) -
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015) -
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
by: Idrus, Arazi, et al.
Published: (2010) -
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)