Dispute resolution in relation to delay of construction project
Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues...
| Main Author: | Soon, Tan Kian |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/11232/ http://eprints.utm.my/11232/6/TanKianSoonMFKA2010.pdf |
Similar Items
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015)
by: Tan, Kean Wei
Published: (2015)
Minimising construction disputes
by: Wahi, Noraziah
Published: (2008)
by: Wahi, Noraziah
Published: (2008)
The profile of construction disputes
by: Abidin, Asniah
Published: (2007)
by: Abidin, Asniah
Published: (2007)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)
A study on the factor effecting project delay in the housing construction
by: Fatin Fazlinda, Hamzah
Published: (2016)
by: Fatin Fazlinda, Hamzah
Published: (2016)
Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2020)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2020)
Using mediation in project disputes based on theory of planned behavior and technology acceptance model
by: Lee, Chia Kuang, et al.
Published: (2020)
by: Lee, Chia Kuang, et al.
Published: (2020)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Using alternative dispute resolution for managing disputes in joint venture construction projects in Malaysia
by: Maidin, Ainul Jaria
Published: (2009)
by: Maidin, Ainul Jaria
Published: (2009)
Adjudication: Evolution of New Form of Dispute Resolution in Construction Industry?
by: Wong, Chen Hin
Published: (2011)
by: Wong, Chen Hin
Published: (2011)
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)
by: Tan, Chin Keng, et al.
Published: (2020)
Communication tools and issues among the construction project team
by: Nadia Izaty, Baharuddin
Published: (2015)
by: Nadia Izaty, Baharuddin
Published: (2015)
Understanding the Causes of Design Errors in Construction Projects: A DEMATEL-Based Framework
by: Lee, Chia Kuang, et al.
Published: (2024)
by: Lee, Chia Kuang, et al.
Published: (2024)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Client-related factors affecting delays in Malaysian school construction projects
by: Najuwa, Mohd Nasir
Published: (2018)
by: Najuwa, Mohd Nasir
Published: (2018)
A review on the implementation of QLASSIC in construction projects
by: Syeh Ameer Ali, Syarifah Firdaus, et al.
Published: (2011)
by: Syeh Ameer Ali, Syarifah Firdaus, et al.
Published: (2011)
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
The Effects of Project Triple Constraint on Malaysia Building Projects
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
The Application of Earned Value Management (EVM) in Construction Project Management
by: Tan, Chin Keng, et al.
Published: (2015)
by: Tan, Chin Keng, et al.
Published: (2015)
Overcoming causes of claim disputes in construction projects: a dematel based model
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Lean construction : knowledge and barriers in implementing into Malaysia construction industry
by: Lim, Victor Aik Jin
Published: (2008)
by: Lim, Victor Aik Jin
Published: (2008)
Adoption of lean tools to control delays in Malaysian construction projects
by: Ansha, Richard Hannis
Published: (2016)
by: Ansha, Richard Hannis
Published: (2016)
Efficiency in construction process
by: Taib, Tahrina
Published: (2010)
by: Taib, Tahrina
Published: (2010)
Challenges of international development projects in Yemen: Perspective of public work project / Hassan Mohammed Mohammed Lashuel
by: Hassan Mohammed, Mohammed Lashuel
Published: (2020)
by: Hassan Mohammed, Mohammed Lashuel
Published: (2020)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Project management during covid-19: the relevance of human skills and the infrastructure project performance in Klang Valley Malaysia
by: Priyadarsini, Palaniapan
Published: (2023)
by: Priyadarsini, Palaniapan
Published: (2023)
Employer's rights and contractor's liabilities in relation to construction defects after final certificate
by: Tan, Pei Ling
Published: (2007)
by: Tan, Pei Ling
Published: (2007)
Predicament in construction – an overlook to delays, cost overruns and risks
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)
Voidable and void construction contracts
by: Yow, Kah Lun
Published: (2006)
by: Yow, Kah Lun
Published: (2006)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
Evaluating the causes and effects of construction disputes in private sector projects
by: Lim, Kelly Kah Yee
Published: (2024)
by: Lim, Kelly Kah Yee
Published: (2024)
Problem facing by private developer involving abandoned projects in Malaysia
by: Muhamad Abdul Hadi, Ahmad Sabri
Published: (2019)
by: Muhamad Abdul Hadi, Ahmad Sabri
Published: (2019)
Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
by: Mohammad Waffy, Fazil, et al.
Published: (2024)
Risk management in construction projects
by: Muniandy, Sivasangkaran
Published: (2015)
by: Muniandy, Sivasangkaran
Published: (2015)
Similar Items
-
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015) -
Minimising construction disputes
by: Wahi, Noraziah
Published: (2008) -
The profile of construction disputes
by: Abidin, Asniah
Published: (2007) -
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015) -
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023)