Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
This paper presents a bottleneck-based methodology to solve scheduling problem of M1,M2,M3,M4,M3,M4 re-entrant flow shop where M1 and M4 have high tendency of being the dominant machines. Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck...
| Main Authors: | Bareduan, Salleh Ahmad, Hasan, Sulaiman |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/8049/ http://eprints.uthm.edu.my/8049/1/J4741_d0bca5a4021271c23fab3726ebba24d6.pdf |
Similar Items
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020)
by: Isa, Noor Amira, et al.
Published: (2020)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Makespan algorithms and heuristic for internet-based collaborative manufacturing process using bottleneck approach
by: Bareduan, Sallehahmad, et al.
Published: (2010)
by: Bareduan, Sallehahmad, et al.
Published: (2010)
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017)
by: Isa, Noor Amira
Published: (2017)
Optimization of granular chute flow with two bottlenecks
by: Liu, Q., et al.
Published: (2014)
by: Liu, Q., et al.
Published: (2014)
Optimization Of Fuzzy Logic Controllers With Genetic Algorithm For Two-Part-Type And Re-Entrant Production Systems
by: Homayouni, Seyed Mahdi
Published: (2008)
by: Homayouni, Seyed Mahdi
Published: (2008)
Performance measure in a probabilistic re-entrant stress testing line
by: Kumar, , S, et al.
Published: (2005)
by: Kumar, , S, et al.
Published: (2005)
Performance analysis in a probabilistic re-entrant for an environmental stress testing operation
by: OMAR, M, et al.
Published: (2008)
by: OMAR, M, et al.
Published: (2008)
Basic concept of implementing Artificial Bee Colony (ABC) system in flow shop scheduling
by: Ho, Yoong Chow, et al.
Published: (2013)
by: Ho, Yoong Chow, et al.
Published: (2013)
Performance Analysis Of A Probalistic Re-Entrant Line In An Environment Stress Testing Operation
by: -, Suresh Kumar
Published: (2007)
by: -, Suresh Kumar
Published: (2007)
Stochastic re-entrant line modeling for an environment stress testing in a semiconductor assembly industry
by: KUMAR, S, et al.
Published: (2006)
by: KUMAR, S, et al.
Published: (2006)
Analysis re-entrant honeycomb auxetic structure for lumbar vertebrae using finite element analysis
by: Ai’man A’siqin, Zulkefli, et al.
Published: (2024)
by: Ai’man A’siqin, Zulkefli, et al.
Published: (2024)
A macro model for traffic flow with consideration of static bottleneck
by: Tang, T., et al.
Published: (2012)
by: Tang, T., et al.
Published: (2012)
Modified Neh Heuristic On Makespan Reduction In Permutation Flow Shop Problems
by: Chong, Zheng Ziao
Published: (2015)
by: Chong, Zheng Ziao
Published: (2015)
Mathematics: the bottleneck of cancer research
by: Win, Shoon Lei, et al.
Published: (2014)
by: Win, Shoon Lei, et al.
Published: (2014)
Breaking the DNA-vaccine bottleneck
by: Danquah, Michael, et al.
Published: (2011)
by: Danquah, Michael, et al.
Published: (2011)
Development of Simulated Annealing Based Scheduling Algorithm for Two Machines Flow Shop Problem
by: M., Muziana, et al.
Published: (2015)
by: M., Muziana, et al.
Published: (2015)
Body mass index (BMI) of Institute of Medicine (1) entrants
by: Thandar, Myat, et al.
Published: (2003)
by: Thandar, Myat, et al.
Published: (2003)
Performance measure in a probabilistic re-entrant stress testing line using mean value analysis / Suresh Kumar and Mohamed Khaled Omar
Published: (2006)
Published: (2006)
Studying thermal performance of split-type air conditioners at building re-entrant via computer simulation / Fauziah Jerai and Ow Chee Sheng
by: Jerai, Fauziah, et al.
Published: (2011)
by: Jerai, Fauziah, et al.
Published: (2011)
Age, gender and sociodemographic differences in school entrants' social and emotional competence
by: Nelson, Helen
Published: (2012)
by: Nelson, Helen
Published: (2012)
Hybrid flow shop scheduling with energy consumption in machine shop using moth flame optimization
by: M. F. F., Ab Rashid, et al.
Published: (2022)
by: M. F. F., Ab Rashid, et al.
Published: (2022)
Effect of adopting different dispatching rules on the mean flow time in a two machine batch-shop problem
by: Abdelraheem Elhaj, Hazir Farouk
Published: (2005)
by: Abdelraheem Elhaj, Hazir Farouk
Published: (2005)
Business Strategy of New Entrants in Telecommunications Industry : Case Study from Malaysia
by: Hue, Fatt Seng
Published: (2012)
by: Hue, Fatt Seng
Published: (2012)
Flexible job shop scheduling using priority heuristics and genetic algorithm
by: Farashahi, Hamid Ghaani
Published: (2010)
by: Farashahi, Hamid Ghaani
Published: (2010)
Machine learning for improving heuristic optimisation
by: Asta, Shahriar
Published: (2015)
by: Asta, Shahriar
Published: (2015)
National Prison Entrants’ Bloodborne Virus & Risk Behaviour Survey 2004, 2007, And 2010
by: Butler, Tony, et al.
Published: (2011)
by: Butler, Tony, et al.
Published: (2011)
Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
by: Siti Nurhazwani Husna, Mohd Hata, et al.
Published: (2025)
by: Siti Nurhazwani Husna, Mohd Hata, et al.
Published: (2025)
Scheduling Incompatible Job Families on A Single Machine: A Two-Level Heuristic Approach
by: Mohamed K., Omar, et al.
Published: (2008)
by: Mohamed K., Omar, et al.
Published: (2008)
Hybrid flow shop scheduling problem with energy utilization using non-dominated sorting genetic algorithm-III (NSGA-III) optimization
by: Muhammad Ammar, Nik Mu’tasim, et al.
Published: (2023)
by: Muhammad Ammar, Nik Mu’tasim, et al.
Published: (2023)
Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions
by: Han, X. S., et al.
Published: (2003)
by: Han, X. S., et al.
Published: (2003)
Nonselective bottlenecks control the divergence and diversification of phase-variable bacterial populations
by: Aidley, Jack B., et al.
Published: (2017)
by: Aidley, Jack B., et al.
Published: (2017)
Dewatering of microalgal cultures: A major bottleneck to algae-based fuels
by: Uduman, N., et al.
Published: (2010)
by: Uduman, N., et al.
Published: (2010)
Investigation into the bottlenecks of conducting research in faculty of resource science and technology (FRST)
by: Chong, Christa
Published: (2012)
by: Chong, Christa
Published: (2012)
Modelling Bottleneck Factors In A Production Line Using Hybrid Approach
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
Product structure initialization, the bottleneck of ERP implementation in customer driven environments: a case study
by: Niestanak, S. Abedi, et al.
Published: (2011)
by: Niestanak, S. Abedi, et al.
Published: (2011)
A comparative representation approach to modern
heuristic search methods in a job shop
by: Dominic P, Dhanapal Durai, et al.
Published: (2008)
by: Dominic P, Dhanapal Durai, et al.
Published: (2008)
Similar Items
-
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009) -
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Makespan algorithms and heuristic for internet-based collaborative manufacturing process using bottleneck approach
by: Bareduan, Sallehahmad, et al.
Published: (2010) -
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)