Makespan algorithms and heuristic for internet-based collaborative manufacturing process using bottleneck approach
This paper presents makespan algorithms and scheduling heuristic for an Internet-based collaborative design and manufacturing process using bottleneck approach. The collaborative manufacturing process resembles a permutation re-entrant flow shop environment with four machines executing the proce...
| Main Authors: | Bareduan, Sallehahmad, Hasan, Sulaiman |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Scientific Research
2010
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/7846/ http://eprints.uthm.edu.my/7846/1/J4740_2515f1bd53ce29482839d411544fe9ee.pdf |
Similar Items
Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
by: Bareduan, Salleh Ahmad, et al.
Published: (2012)
by: Bareduan, Salleh Ahmad, et al.
Published: (2012)
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020)
by: Isa, Noor Amira, et al.
Published: (2020)
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017)
by: Isa, Noor Amira
Published: (2017)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)
Modified Neh Heuristic On Makespan Reduction In Permutation Flow Shop Problems
by: Chong, Zheng Ziao
Published: (2015)
by: Chong, Zheng Ziao
Published: (2015)
A whale optimization algorithm approach for flow shop scheduling to minimize makespan
by: Mohd Abdul Hadi, Osman, et al.
Published: (2024)
by: Mohd Abdul Hadi, Osman, et al.
Published: (2024)
Scalable workflow scheduling algorithm for minimizing makespan and failure probability
by: Abdul Aziz, Maslina, et al.
Published: (2019)
by: Abdul Aziz, Maslina, et al.
Published: (2019)
An efficient VM scheduling algorithm to minimize the makespan and maximize the profit
by: Ibrahim, Aws Fadhil
Published: (2019)
by: Ibrahim, Aws Fadhil
Published: (2019)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
by: Mohd Ariffin, Mohd Khairol Anuar, et al.
Published: (2015)
by: Mohd Ariffin, Mohd Khairol Anuar, et al.
Published: (2015)
Mathematics: the bottleneck of cancer research
by: Win, Shoon Lei, et al.
Published: (2014)
by: Win, Shoon Lei, et al.
Published: (2014)
Breaking the DNA-vaccine bottleneck
by: Danquah, Michael, et al.
Published: (2011)
by: Danquah, Michael, et al.
Published: (2011)
MILP Model in Minimizing Makespan with Priority for Unrelated Parallel Machines
by: Caccetta, Louis, et al.
Published: (2010)
by: Caccetta, Louis, et al.
Published: (2010)
Modelling Bottleneck Factors In A Production Line Using Hybrid Approach
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
by: Desa, Wan Laailatul Hanim Mat
Published: (2016)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
Online scheduling in Minimizing Makespan on Identical Parallel Processor with Release Date
by: Nordin, S., et al.
Published: (2014)
by: Nordin, S., et al.
Published: (2014)
Hyper-heuristic approaches for data stream-based iIntrusion detection in the Internet of Things
by: Hadi, Ahmed Adnan
Published: (2022)
by: Hadi, Ahmed Adnan
Published: (2022)
Optimization of granular chute flow with two bottlenecks
by: Liu, Q., et al.
Published: (2014)
by: Liu, Q., et al.
Published: (2014)
Dewatering of microalgal cultures: A major bottleneck to algae-based fuels
by: Uduman, N., et al.
Published: (2010)
by: Uduman, N., et al.
Published: (2010)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
Heuristics-in-use in industrial interfirm-collaborating clusters
by: Lai, W., et al.
Published: (2015)
by: Lai, W., et al.
Published: (2015)
MTTDFR-SJFR: A Combinatorial Rule Approach To Balance Tradeoff Between Flowtime, Makespan, Delayed Jobs, Total Tardiness And Utilization
by: Zafril Rizal, M Azmi, et al.
Published: (2018)
by: Zafril Rizal, M Azmi, et al.
Published: (2018)
Experimental evaluation of bottleneck link utilization with new-additive increase multiplicative decrease congestion avoidance and control algorithm.
by: Jasem , Hayder Natiq, et al.
Published: (2009)
by: Jasem , Hayder Natiq, et al.
Published: (2009)
A macro model for traffic flow with consideration of static bottleneck
by: Tang, T., et al.
Published: (2012)
by: Tang, T., et al.
Published: (2012)
Heuristic algorithms for routing problems.
by: Chong, Yen N.
Published: (2001)
by: Chong, Yen N.
Published: (2001)
Time series predictive analysis based on hybridization of meta-heuristic algorithms
by: Zuriani, Mustaffa, et al.
Published: (2018)
by: Zuriani, Mustaffa, et al.
Published: (2018)
Time series predictive analysis based on hybridization
of meta-heuristic algorithms
by: Mustaffa, Zuriani, et al.
Published: (2018)
by: Mustaffa, Zuriani, et al.
Published: (2018)
An Enhanced Artificial Immune System
Approach For Assembly Line Balancing
Problem Through Shifting Bottleneck
Identification
by: Khalid, Mohd Nor Akmal
Published: (2018)
by: Khalid, Mohd Nor Akmal
Published: (2018)
A heuristics approach for classroom scheduling using genetic algorithm technique
by: Ahmad, Izah R., et al.
Published: (2017)
by: Ahmad, Izah R., et al.
Published: (2017)
Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions
by: Han, X. S., et al.
Published: (2003)
by: Han, X. S., et al.
Published: (2003)
Nonselective bottlenecks control the divergence and diversification of phase-variable bacterial populations
by: Aidley, Jack B., et al.
Published: (2017)
by: Aidley, Jack B., et al.
Published: (2017)
Investigation into the bottlenecks of conducting research in faculty of resource science and technology (FRST)
by: Chong, Christa
Published: (2012)
by: Chong, Christa
Published: (2012)
Minimizing makespan of multimachine production system in flow shop environment by means of mixed integer programming model
by: Abdul Rahman, Nur Salihah, et al.
Published: (2018)
by: Abdul Rahman, Nur Salihah, et al.
Published: (2018)
A heuristic algorithm based on multiassignment procedures for nurse scheduling
by: Constantino, Ademir Aparecido, et al.
Published: (2014)
by: Constantino, Ademir Aparecido, et al.
Published: (2014)
Product structure initialization, the bottleneck of ERP implementation in customer driven environments: a case study
by: Niestanak, S. Abedi, et al.
Published: (2011)
by: Niestanak, S. Abedi, et al.
Published: (2011)
A Node Routing Problem with Intermediate Facilities:
A Managerial Approach Based on a Heuristic Algorithm
by: Nafezi, Nima
Published: (2013)
by: Nafezi, Nima
Published: (2013)
A system design approach for overcoming heat exchanger fouling bottlenecks - a study on a refinery preheat train
by: Abdul Manan, Zainuddin, et al.
Published: (2003)
by: Abdul Manan, Zainuddin, et al.
Published: (2003)
Heuristic approaches to urban livability
by: Wyatt, Ray
Published: (2009)
by: Wyatt, Ray
Published: (2009)
Similar Items
-
Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
by: Bareduan, Salleh Ahmad, et al.
Published: (2012) -
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020) -
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
by: Md Amin Hamzas, Mohd Fidzwan, et al.
Published: (2012)