Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
The re-entrant flow shop environment has become prominent in the manufacturing industries and has recently attracted researchers attention. Typical examples of re-entrant flow shops are the printed circuit board manufacturing and furniture painting processes where components or processed parts...
| Main Author: | Sh Ahmad, Sh Salleh |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/7448/ http://eprints.uthm.edu.my/7448/1/24p%20SH%20SALLEH%20SH%20AHMAD.pdf http://eprints.uthm.edu.my/7448/2/SH%20SALLEH%20SH%20AHMAD%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/7448/3/SH%20SALLEH%20SH%20AHMAD%20WATERMARK.pdf |
Similar Items
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
by: Bareduan, Salleh Ahmad, et al.
Published: (2012)
by: Bareduan, Salleh Ahmad, et al.
Published: (2012)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Machine Maintenance Management System
by: Heng, Cheng Bu
Published: (2001)
by: Heng, Cheng Bu
Published: (2001)
Improvement design of existing threshing machine at Kilang Sawit Risda, Ulu Keratong
by: Gelau, Daryl, et al.
Published: (2020)
by: Gelau, Daryl, et al.
Published: (2020)
Tribological evaluations of modified RBD palm olein-based lubricants in machining processes
by: T., Norfazillah, et al.
Published: (2018)
by: T., Norfazillah, et al.
Published: (2018)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Machining feature-based system for supporting step-compliant milling process
by: Chen, Wong Keong
Published: (2017)
by: Chen, Wong Keong
Published: (2017)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
Similar Items
-
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004) -
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)