Management factors affecting time and cost performance of construction projects
This study was to investigate management related factors affecting time and cost performance of construction projects and also to uncover in-depth information on time and cost overruns faced by construction companies. Data collection for this study was carried out through questionnaire survey. Li...
| Main Author: | Chin Foo, Lee |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/6441/ http://eprints.uthm.edu.my/6441/1/24p%20LEE%20CHIN%20FOO.pdf http://eprints.uthm.edu.my/6441/2/LEE%20CHIN%20FOO%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/6441/3/LEE%20CHIN%20FOO%20WATERMARK.pdf |
Similar Items
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
by: Shaikh, Haseeb Halim
Published: (2021)
by: Shaikh, Haseeb Halim
Published: (2021)
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018)
by: Alnadish, Adham, et al.
Published: (2018)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
The challenges Of quantity surveying practice in
sustainable construction project
by: Che Haron, Roziha, et al.
Published: (2017)
by: Che Haron, Roziha, et al.
Published: (2017)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan
by: Kong, H. P., et al.
Published: (2018)
by: Kong, H. P., et al.
Published: (2018)
Impact of procurement methods and project types on construction projects performance / Jimoh Richard, Oyewobi Luqman and Aliu Nurayn
by: Richard, Jimoh, et al.
Published: (2015)
by: Richard, Jimoh, et al.
Published: (2015)
Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
Kajian terhadap kepentingan dan penggunaan kawasan lapang bagi kawasan perumahan awam / Syamsuri Daud
by: Daud, Syamsuri
Published: (1999)
by: Daud, Syamsuri
Published: (1999)
Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
A generic process of documentation and data management for historical Malay architecture using BIM
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
Improvement of constructability guidelines for design phase in highway project / Siti Hafizan Hassan, Nadira Ahzahar and Hazrina Ahmad
by: Hassan, Siti Hafizan, et al.
Published: (2009)
by: Hassan, Siti Hafizan, et al.
Published: (2009)
New towns in Peninsular Malaysia: planning and development / Dasimah Omar
by: Omar, Dasimah
Published: (2004)
by: Omar, Dasimah
Published: (2004)
Influential factors affecting materials management in construction projects
by: Mat Jusoh, Zairra, et al.
Published: (2017)
by: Mat Jusoh, Zairra, et al.
Published: (2017)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Safety management among contractor g7 in the construction of high rise building / Zulaikha Ismail
by: Ismail, Zulaikha
Published: (2013)
by: Ismail, Zulaikha
Published: (2013)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Factors affecting time performance of refurbishment projects in Singapore / Chew Lee Fuan
by: Chew, Lee Fuan
Published: (2012)
by: Chew, Lee Fuan
Published: (2012)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
External factors affecting construction project performance in Iraq using pestle factors
by: Khalid, Layth Salman
Published: (2020)
by: Khalid, Layth Salman
Published: (2020)
Kesan pengangkutan LRT (Transit Laju Ringan) terhadap mobiliti penduduk bandar (kes kajian: Kuala Lumpur) / Maimoon Zainal
by: Zainal, Maimoon
Published: (1998)
by: Zainal, Maimoon
Published: (1998)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022)
by: Saleh Almansoori, Maitha Taher
Published: (2022)
Pengurusan penyelenggaraan bangunan ITM Kelantan yang baru / Mohd. Aminudin Abdul Muluk
by: Abdul Muluk, Mohd. Aminudin
Published: (1996)
by: Abdul Muluk, Mohd. Aminudin
Published: (1996)
Factors Affecting Malaysia–China Construction Joint Venture Projects
by: Mo , Xuan
Published: (2012)
by: Mo , Xuan
Published: (2012)
Factors Affecting Contractors' Bidding Decisions for Construction
Projects in Nigeria
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
by: Oyeyipo, Opeyemi Olanrewaju, et al.
Published: (2016)
Penilaian tahap keberkesanan program publisiti dalam penyediaan draf rancangan tempatan daerah Temerloh, Maran, dan Jerantut Pahang / Norshahidayah Sulaiman dan Zurina Mohd Sadali
by: Sulaiman, Norshahidayah, et al.
Published: (2011)
by: Sulaiman, Norshahidayah, et al.
Published: (2011)
Time Delay and Cost Overrun of Road over Bridge (ROB)
Construction Projects in India
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
by: Venkateswaran, Chandrasekaran Balaji, et al.
Published: (2017)
Factors that affect the performance of public project in Malaysia
by: Norsyahidatul Nazirah , Ismail
Published: (2012)
by: Norsyahidatul Nazirah , Ismail
Published: (2012)
Similar Items
-
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019) -
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020) -
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015) -
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)