Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
The construction industry has rapidly grown in Saudi Arabia and there are many upcoming projects to be finished in a limited time to meet the Saudi Vision 2030. Due to the shortage of time, most of the projects are managed by fast track system. It has been observed that the number and amount of c...
| Main Author: | Shaikh, Haseeb Halim |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/6439/ http://eprints.uthm.edu.my/6439/1/24p%20HASEEB%20HALEEM%20SHAIKH.pdf http://eprints.uthm.edu.my/6439/2/HASEEB%20HALEEM%20SHAIKH%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/6439/3/HASEEB%20HALEEM%20SHAIKH%20WATERMARK.pdf |
Similar Items
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018)
by: Alnadish, Adham, et al.
Published: (2018)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
The challenges Of quantity surveying practice in
sustainable construction project
by: Che Haron, Roziha, et al.
Published: (2017)
by: Che Haron, Roziha, et al.
Published: (2017)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan
by: Kong, H. P., et al.
Published: (2018)
by: Kong, H. P., et al.
Published: (2018)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Complexity of Construction Mega Infrastructure Project
by: Wu, Changzhi, et al.
Published: (2018)
by: Wu, Changzhi, et al.
Published: (2018)
Impact of procurement methods and project types on construction projects performance / Jimoh Richard, Oyewobi Luqman and Aliu Nurayn
by: Richard, Jimoh, et al.
Published: (2015)
by: Richard, Jimoh, et al.
Published: (2015)
Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
by: Shabir Hussain Khahro, Shabir Hussain Khahro, et al.
Published: (2023)
Delay in Decision-Making Affecting Construction Projects:
A Sustainable Decision-Making Model for Mega Projects
by: Khahro, Shabir Hussain, et al.
Published: (2023)
by: Khahro, Shabir Hussain, et al.
Published: (2023)
Incentive Mechanisms for Supplier Development in Mega Construction Projects
by: Zeng, W., et al.
Published: (2018)
by: Zeng, W., et al.
Published: (2018)
Improvement of constructability guidelines for design phase in highway project / Siti Hafizan Hassan, Nadira Ahzahar and Hazrina Ahmad
by: Hassan, Siti Hafizan, et al.
Published: (2009)
by: Hassan, Siti Hafizan, et al.
Published: (2009)
Exploring the Construction of Professional Selves of Non-native EFL Teachers at a Saudi
Arabian University
by: Ahmad, Hussain, et al.
Published: (2017)
by: Ahmad, Hussain, et al.
Published: (2017)
A discrete firefly algorithm for the scaffolding modular construction in mega projects
by: Liu, J., et al.
Published: (2014)
by: Liu, J., et al.
Published: (2014)
Conflicts and delays in mega construction projects – Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
Effect of mega railway projects on small and medium construction companies: Impact and problems
by: Nurul Atiqah, Ab Hakim, et al.
Published: (2024)
by: Nurul Atiqah, Ab Hakim, et al.
Published: (2024)
Structural model of factors affecting pmo performance in uae mega construction projects
by: Saleh Almansoori, Maitha Taher
Published: (2022)
by: Saleh Almansoori, Maitha Taher
Published: (2022)
Safety management among contractor g7 in the construction of high rise building / Zulaikha Ismail
by: Ismail, Zulaikha
Published: (2013)
by: Ismail, Zulaikha
Published: (2013)
Mega-project engineering-management processes: pre-planning phase evaluation for construction and mining
by: Albishri, Abdulaziz Ali M
Published: (2015)
by: Albishri, Abdulaziz Ali M
Published: (2015)
New towns in Peninsular Malaysia: planning and development / Dasimah Omar
by: Omar, Dasimah
Published: (2004)
by: Omar, Dasimah
Published: (2004)
Saudi Arabian Politics Takes on Machiavellian Nuance
by: Rich, Ben
Published: (2017)
by: Rich, Ben
Published: (2017)
Overcoming causes of claim disputes in construction projects: a dematel based model
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
Construction Claim Types and Causes for a Large-Scale
Hydropower Project in Bhutan
by: Hadikusumo, Bonaventura H.W., et al.
Published: (2015)
by: Hadikusumo, Bonaventura H.W., et al.
Published: (2015)
Safety compliance for hihg rise projects in Nigerian construction Industry
by: Mohammed Kabir, Kaigama
Published: (2015)
by: Mohammed Kabir, Kaigama
Published: (2015)
Performance management practices in the Saudi Arabian public sector
by: Alkahtani, Moshobab, et al.
Published: (2013)
by: Alkahtani, Moshobab, et al.
Published: (2013)
Psychological Adjustment Of Saudi Arabian Postgraduate Students In Malaysia
by: Khalaf A., Alshammari Majid
Published: (2023)
by: Khalaf A., Alshammari Majid
Published: (2023)
Similar Items
-
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020) -
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015) -
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016) -
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)