Causative factors of cost overrun in highway projects of Sindh province of Pakistan
Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway p...
| Main Authors: | Sohu, S, Halid, A, Nagapan, Sasitharan, Fattah, A, Latif, I, Ullah, K |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
IOP Publishing
2017
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/5893/ http://eprints.uthm.edu.my/5893/1/AJ%202017%20%28701%29.pdf |
Similar Items
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007)
by: Sanik, Mohd Erwan
Published: (2007)
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005)
by: Haron, Suria
Published: (2005)
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003)
by: Othman, Asri
Published: (2003)
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)
by: Hartatik, Nurani, et al.
Published: (2021)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAL431 – Highway Design
(Reka Bentuk Lebuh Raya) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Second Semester Examination 2018/2019 Academic Session
June 2019 EAL235 – Highway and Traffic Engineering
(Kejuruteraan Lebuh Raya dan Lalu Lintas) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat pengajian Kejuruteraan
Published: (2019)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL235 – Highway and Traffic Engineering [Kejuruteraan Lebuh Raya dan Lalu Lintas] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
REG 463 - REKABENTUK JALAN DAN LABUH RAYA APRIL 1993.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1993)
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)
by: Ammar, Adnan, et al.
Published: (2018)
Effect of hatched marking length on entering position among motorcyclists during merging in expressway
by: Adnan, Ammar, et al.
Published: (2018)
by: Adnan, Ammar, et al.
Published: (2018)
Carbon nanomaterials derived from Malaysia’s highway road asphalt waste as electrode for supercapacitor
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
by: Mohd Abid, Mohd Asyadi Azam, et al.
Published: (2018)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAL432 –Advanced Transportation and Highway Engineering [Kejuruteraan Lebuhraya dan Pengangkutan Lanjutan] Duration: 3 hours
[Masa: 3 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015)
by: Asmalia, Che Ahmad, et al.
Published: (2015)
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
by: Maslan, Masfarizan
Published: (2003)
by: Maslan, Masfarizan
Published: (2003)
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996)
by: Ya'cub, Mohamad
Published: (1996)
Estimation of the design elements of horizontal alignment by the method of least squares/Jalina Rabi
by: Rabi, Jalina
Published: (2006)
by: Rabi, Jalina
Published: (2006)
Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
by: Samsudin, Muhamad Fairul
Published: (2006)
by: Samsudin, Muhamad Fairul
Published: (2006)
Mitigation measures for significant factors instigating cost overrun in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010)
by: Razali, Roziawati
Published: (2010)
A structural model for mitigation measures of critical cost overrun factors in highway projects in sindh province
by: Sohu, Samiullah
Published: (2018)
by: Sohu, Samiullah
Published: (2018)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Commuters’ travel characteristics, modal choice and performance of public transport options in Lagos, Nigeria / Wale Alade, Mobolaji Olaseni and Olufemi Adeniji.
by: Alade, Wale, et al.
Published: (2019)
by: Alade, Wale, et al.
Published: (2019)
Assessment of physicochemical parameters for the drinking water quality in the vicinity of Nawabshah City, Sindh, Pakistan
by: Mangi, Sajjad Ali, et al.
Published: (2017)
by: Mangi, Sajjad Ali, et al.
Published: (2017)
Design phase constructability concepts in highway projects
by: Hassan, Siti Hafizan
Published: (2005)
by: Hassan, Siti Hafizan
Published: (2005)
The effectiveness of pavement rehabilitation at Kuala Lumpur Karak Highway
by: Abdul Rani, Onn
Published: (2007)
by: Abdul Rani, Onn
Published: (2007)
A Comparative Study on the Readiness Parameters of Highway Construction Projects
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
Influence of pavement condition towards accident number on Malaysian highway
by: Baskara, S. N., et al.
Published: (2019)
by: Baskara, S. N., et al.
Published: (2019)
Decision making in highway construction: a systematic review and future directions
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
Pavement technology elements in green highway
by: Wan Azahar, Wan Nur Aifa, et al.
Published: (2015)
by: Wan Azahar, Wan Nur Aifa, et al.
Published: (2015)
aintenance management consideration in highway operation case study : east coast expressway
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
Assessment index tool for green highway in Malaysia
by: Balubaid, Saeed, et al.
Published: (2015)
by: Balubaid, Saeed, et al.
Published: (2015)
Subsidence prediction along the karak highway by 2-d electrical imaging geophysical method
by: Saad, Rosli, et al.
Published: (2008)
by: Saad, Rosli, et al.
Published: (2008)
Empowerment among small farmers of Sindh province, Pakistan
by: Khushk, Ghulam Mujtaba, et al.
Published: (2016)
by: Khushk, Ghulam Mujtaba, et al.
Published: (2016)
The most important centrality measures in plus highway traffic network: an approach based on effective variance
by: Mohd Asrah, Norhaidah, et al.
Published: (2018)
by: Mohd Asrah, Norhaidah, et al.
Published: (2018)
Level of service (LOS) for multilane highway and road accident information system development of Batu Pahat area
by: Abdullah, Mohd Ezree
Published: (2005)
by: Abdullah, Mohd Ezree
Published: (2005)
Level of service (LOS) for multilane highway and road accident information system development of Batu Pahat area
by: Abdullah, Moho Ezree
Published: (2005)
by: Abdullah, Moho Ezree
Published: (2005)
Wind energy potential in Pakistan : A feasibility study in sindh province
by: Asghar, Rafiq, et al.
Published: (2022)
by: Asghar, Rafiq, et al.
Published: (2022)
EAL 235 HIGHWAY AND TRAFFIC ENGINEERING (JUN 2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2016)
Assessment framework for pavement material and technology elements in green highway index
by: Bujang, Mastura, et al.
Published: (2018)
by: Bujang, Mastura, et al.
Published: (2018)
Similar Items
-
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018) -
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007) -
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005) -
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003) -
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)