Theoretical framework of the causes of construction time and cost overruns
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption fro...
| Main Authors: | Ullah, Kaleem, Abdullah, Abd Hadi, Nagapan, Sasitharan, Suhoo, S, Khan, M S |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
IOP Publishing
2017
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/5891/ http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf |
Similar Items
Sustainable Construction: Material Onsite
Management
by: Ariffin, Anita
Published: (2006)
by: Ariffin, Anita
Published: (2006)
Architectural building safety and health performance model for stratified low-cost housing: education and management tool for building managers
by: Akasah, Zainal Abidin, et al.
Published: (2015)
by: Akasah, Zainal Abidin, et al.
Published: (2015)
Development of a conceptual integrated influential factors (IIF) model of internal stakeholder for construction projects successful completion in Yemen
by: Al-Fadhal, Najib, et al.
Published: (2018)
by: Al-Fadhal, Najib, et al.
Published: (2018)
A Model of Housing Quality Determinants (HQD) for Affordable Housing
by: Chohan, Afaq Hyder, et al.
Published: (2015)
by: Chohan, Afaq Hyder, et al.
Published: (2015)
Develop the concept of sustainable residential college: study a room space
by: Buyung, Mohd Reduan, et al.
Published: (2018)
by: Buyung, Mohd Reduan, et al.
Published: (2018)
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen
by: AL-Fadhali,, Najib, et al.
Published: (2018)
by: AL-Fadhali,, Najib, et al.
Published: (2018)
Green roof performance under Malaysia tropical climates : a review
by: Isa, Nur Fitriah, et al.
Published: (2020)
by: Isa, Nur Fitriah, et al.
Published: (2020)
Perubahan Seni Bina Dalam Konteks
Budaya Merantau Dan Kesannya
Terhadap Rumah Tradisional Negeri
Sembilan, Malaysia
by: Wahab, Mohamad Hanif Abdul
Published: (2019)
by: Wahab, Mohamad Hanif Abdul
Published: (2019)
Pembangunan teknik instrumentasi baharu bagi penilaian keadaan bangunan muzium
by: Zuraidi, Siti Nor Fatimah
Published: (2022)
by: Zuraidi, Siti Nor Fatimah
Published: (2022)
A case study of green building in Malaysia: cost saving analysis
by: Soon, C. K., et al.
Published: (2017)
by: Soon, C. K., et al.
Published: (2017)
Structural modelling of cause and effect factors of construction waste generation in Malaysian Construction Industry
by: Nagapan, Sasitharan
Published: (2014)
by: Nagapan, Sasitharan
Published: (2014)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAS454 – Advanced Structural Engineering [Kejuruteraan Struktur Lanjutan]
Duration: 3 hours [Masa: 3 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAS457 – Structural Steel Design (Rekabentuk Struktur Keluli) Duration: 2 hours
(Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Application of Structural Equation Modeling (SEM) in quantitative research
by: Ahmad@Mohamad, Md. Fauzi
Published: (2017)
by: Ahmad@Mohamad, Md. Fauzi
Published: (2017)
Development of prefabricated building implementation framework for addressing housing needs in libya/ Khaled M. Amtered El-Abidi
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2018)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2018)
Reinforcement-concrete ratio of building frames
by: Tan, Chin Keng
Published: (2010)
by: Tan, Chin Keng
Published: (2010)
Green infrastructure as green health promotion agenda for urban community
by: Mansor, Mazlina, et al.
Published: (2012)
by: Mansor, Mazlina, et al.
Published: (2012)
User requirements for virtual reality in architectural heritage learning
by: Abu Bakar, Juliana Aida, et al.
Published: (2013)
by: Abu Bakar, Juliana Aida, et al.
Published: (2013)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Application of universe design in the built environment
by: Abdul Rahim, Asiah
Published: (2010)
by: Abdul Rahim, Asiah
Published: (2010)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019)
by: A. M., Faten Albtoush, et al.
Published: (2019)
Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Structural modelling of cost overrun factors in construction industry
by: Memon, Aftab Hameed
Published: (2013)
by: Memon, Aftab Hameed
Published: (2013)
Mass flow rate induced by combined roof solar roof collector and vertical stack in hot humid climate
by: Mohammad Yusoff, Wardah Fatimah, et al.
Published: (2014)
by: Mohammad Yusoff, Wardah Fatimah, et al.
Published: (2014)
The mosque institution in history: Lessons for today
by: Omer, Spahic
Published: (2012)
by: Omer, Spahic
Published: (2012)
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2016/2017 Academic Session June 2017 EAS356 – Reinforced Concrete Structural Design II [Rekabentuk Struktur Konkrit Bertetulang II] Duration: 2 hours [Masa: 2 jam]
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2017)
Second Semester Examination 2018/2019 Academic Session
June 2019 EAS456 – Advanced Structural Analysis
(Analisis Struktur Lanjutan) Duration: 2 hours (Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Cost overrun of construction project in Pahang : causes and solution
by: Nurafiqah, Abu Hasan
Published: (2017)
by: Nurafiqah, Abu Hasan
Published: (2017)
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
by: Muhammad, Muhammad Tahir, et al.
Published: (2017)
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017)
by: Sohu, S, et al.
Published: (2017)
Reinventing the passive design framework in the
tropics: the experience of green rating systems and
passive strategies
by: Jahn Kassim, Puteri Shireen, et al.
Published: (2019)
by: Jahn Kassim, Puteri Shireen, et al.
Published: (2019)
Modeling the factors causing cost overrun in UAE construction industry
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
A genealogy of Malay architecture: ‘the public realm’
by: Jahn Kassim, Puteri Shireen
Published: (2019)
by: Jahn Kassim, Puteri Shireen
Published: (2019)
Mitigation measures for significant factors instigating cost overrun in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Effect of tropical climate condition to compressive strength and microstructure properties of High Performance Fiber Reinforced Concrete (HPFRC)
by: Saad , Siti Asmahani, et al.
Published: (2014)
by: Saad , Siti Asmahani, et al.
Published: (2014)
Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia
by: Harisaweni, Harisaweni
Published: (2007)
by: Harisaweni, Harisaweni
Published: (2007)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Similar Items
-
Sustainable Construction: Material Onsite
Management
by: Ariffin, Anita
Published: (2006) -
Architectural building safety and health performance model for stratified low-cost housing: education and management tool for building managers
by: Akasah, Zainal Abidin, et al.
Published: (2015) -
Development of a conceptual integrated influential factors (IIF) model of internal stakeholder for construction projects successful completion in Yemen
by: Al-Fadhal, Najib, et al.
Published: (2018) -
A Model of Housing Quality Determinants (HQD) for Affordable Housing
by: Chohan, Afaq Hyder, et al.
Published: (2015) -
Develop the concept of sustainable residential college: study a room space
by: Buyung, Mohd Reduan, et al.
Published: (2018)