Theoretical framework of the causes of construction time and cost overruns

Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption fro...

Full description

Bibliographic Details
Main Authors: Ullah, Kaleem, Abdullah, Abd Hadi, Nagapan, Sasitharan, Suhoo, S, Khan, M S
Format: Article
Language:English
Published: IOP Publishing 2017
Subjects:
Online Access:http://eprints.uthm.edu.my/5891/
http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf
_version_ 1848888662423502848
author Ullah, Kaleem
Abdullah, Abd Hadi
Nagapan, Sasitharan
Suhoo, S
Khan, M S
author_facet Ullah, Kaleem
Abdullah, Abd Hadi
Nagapan, Sasitharan
Suhoo, S
Khan, M S
author_sort Ullah, Kaleem
building UTHM Institutional Repository
collection Online Access
description Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
first_indexed 2025-11-15T20:13:51Z
format Article
id uthm-5891
institution Universiti Tun Hussein Onn Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:13:51Z
publishDate 2017
publisher IOP Publishing
recordtype eprints
repository_type Digital Repository
spelling uthm-58912022-01-24T07:30:50Z http://eprints.uthm.edu.my/5891/ Theoretical framework of the causes of construction time and cost overruns Ullah, Kaleem Abdullah, Abd Hadi Nagapan, Sasitharan Suhoo, S Khan, M S TH845-895 Architectural engineering. Structural engineering of buildings Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects. IOP Publishing 2017 Article PeerReviewed text en http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf Ullah, Kaleem and Abdullah, Abd Hadi and Nagapan, Sasitharan and Suhoo, S and Khan, M S (2017) Theoretical framework of the causes of construction time and cost overruns. IOP Conference Series: Materials Science and Engineering (MSE), 271 (NIL). pp. 1-8. ISSN 1757-8982 https://dx.doi.org/10.1088/1757-899X/271/1/012032
spellingShingle TH845-895 Architectural engineering. Structural engineering of buildings
Ullah, Kaleem
Abdullah, Abd Hadi
Nagapan, Sasitharan
Suhoo, S
Khan, M S
Theoretical framework of the causes of construction time and cost overruns
title Theoretical framework of the causes of construction time and cost overruns
title_full Theoretical framework of the causes of construction time and cost overruns
title_fullStr Theoretical framework of the causes of construction time and cost overruns
title_full_unstemmed Theoretical framework of the causes of construction time and cost overruns
title_short Theoretical framework of the causes of construction time and cost overruns
title_sort theoretical framework of the causes of construction time and cost overruns
topic TH845-895 Architectural engineering. Structural engineering of buildings
url http://eprints.uthm.edu.my/5891/
http://eprints.uthm.edu.my/5891/
http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf