Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach

Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued i...

Full description

Bibliographic Details
Main Authors: Baharom, Md Nor Ramdon, Mahmod, Luqman Hakim, Zainal, Zainab, Ullah, Irshad, Ali, Irfan
Format: Article
Language:English
Published: Asian Research Publishing Network (ARPN) 2015
Subjects:
Online Access:http://eprints.uthm.edu.my/5639/
http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf
_version_ 1848888602263552000
author Baharom, Md Nor Ramdon
Mahmod, Luqman Hakim
Zainal, Zainab
Ullah, Irshad
Ali, Irfan
author_facet Baharom, Md Nor Ramdon
Mahmod, Luqman Hakim
Zainal, Zainab
Ullah, Irshad
Ali, Irfan
author_sort Baharom, Md Nor Ramdon
building UTHM Institutional Repository
collection Online Access
description Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued if it does not violates the right of ways in any aspect. This project compares available conductors in the market to determine which will provide better performance in terms of current and sag for 275 kV lattice tower.
first_indexed 2025-11-15T20:12:53Z
format Article
id uthm-5639
institution Universiti Tun Hussein Onn Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T20:12:53Z
publishDate 2015
publisher Asian Research Publishing Network (ARPN)
recordtype eprints
repository_type Digital Repository
spelling uthm-56392022-01-19T07:15:47Z http://eprints.uthm.edu.my/5639/ Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach Baharom, Md Nor Ramdon Mahmod, Luqman Hakim Zainal, Zainab Ullah, Irshad Ali, Irfan T Technology (General) Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued if it does not violates the right of ways in any aspect. This project compares available conductors in the market to determine which will provide better performance in terms of current and sag for 275 kV lattice tower. Asian Research Publishing Network (ARPN) 2015 Article PeerReviewed text en http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf Baharom, Md Nor Ramdon and Mahmod, Luqman Hakim and Zainal, Zainab and Ullah, Irshad and Ali, Irfan (2015) Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach. ARPN Journal of Engineering and Applied Sciences, 10 (19). pp. 8547-8555. ISSN 1819-6608
spellingShingle T Technology (General)
Baharom, Md Nor Ramdon
Mahmod, Luqman Hakim
Zainal, Zainab
Ullah, Irshad
Ali, Irfan
Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title_full Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title_fullStr Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title_full_unstemmed Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title_short Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
title_sort improvement of the sag ampacity carrying level of existing 275 kv overhead line tower by using the re-conductoring approach
topic T Technology (General)
url http://eprints.uthm.edu.my/5639/
http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf