Measures for mitigating the delay in high-rise building construction projects in Dubai
Construction industry faces several challenges such as low labour productivity, cost overrun, time overrun, and extreme weather condition. Globally, the most severe challenge is project delay, particularly in Dubai where the construction industry is booming rapidly than other parts of the world, esp...
| Main Author: | Bhatti, Imtiaz Ali |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/519/ http://eprints.uthm.edu.my/519/1/24p%20IMTIAZ%20ALI%20BHATTI.pdf http://eprints.uthm.edu.my/519/2/IMTIAZ%20ALI%20BHATTI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/519/3/IMTIAZ%20ALI%20BHATTI%20WATERMARK.pdf |
Similar Items
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Design and construction of attire dryer for high-rise building
by: Lam, Chin Yueh
Published: (2004)
by: Lam, Chin Yueh
Published: (2004)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Cost implication for a residential high-rise project to achieve certified level Green Building Index (GBI) rating.
by: Lai, Wei Chian
Published: (2013)
by: Lai, Wei Chian
Published: (2013)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
Project Performance And Delays In Sudan
Construction Industry
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
by: Elhassan, Salma Abdalrahman Mohamed
Published: (2009)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Agreement Options in Multi-person Decision Optimizing High-rise Buildings Columns
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Implementation of building information modeling (BIM) in Pakistan construction industry
by: Bhatti, Imtiaz Ali, et al.
Published: (2018)
by: Bhatti, Imtiaz Ali, et al.
Published: (2018)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Possibilities of using void to improve natural cross ventilation in high-rise low-cost residential building
by: Sapian, Abdul Razak
Published: (2004)
by: Sapian, Abdul Razak
Published: (2004)
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)
by: Samarghandi, Hamed, et al.
Published: (2016)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
Incorporation of Risk Index for Risk Response and Risk Mitigation Strategies of Public-Private Partnership (PPP) Housing Construction Project in Malaysia
by: Putri Zulaiha, Razi, et al.
Published: (2020)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
Causes of time delay in construction Sarawak, Malaysia
by: Harrison Yan, Rolland Duat
Published: (2014)
by: Harrison Yan, Rolland Duat
Published: (2014)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
Lateral stability of high-rise building
by: Gan, Ming Ong
Published: (2005)
by: Gan, Ming Ong
Published: (2005)
Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
by: Irfanullah, Irfanullah, et al.
Published: (2023)
by: Irfanullah, Irfanullah, et al.
Published: (2023)
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010)
by: Soon, Tan Kian
Published: (2010)
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)
by: Jasmani, Ismail
Published: (2016)
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013)
by: Alinaitwe, Henry, et al.
Published: (2013)
Examine the perception on the integration of building information modelling and artificial intelligence in construction projects
by: Lee, Jie Anne
Published: (2021)
by: Lee, Jie Anne
Published: (2021)
Best practices in managing goal and strategies for multi-projects in building construction industry
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
User's perceptions on thermal comfort and the effects of radiation in Skycourts of high rise buildings.
by: Abdullah, Aldrin
Published: (2014)
by: Abdullah, Aldrin
Published: (2014)
Case study on delay factors in steel bridge construction
by: Hazim Adly Harun, Harun
Published: (2015)
by: Hazim Adly Harun, Harun
Published: (2015)
The relationship between preventive maintenance characteristics and the maintenance performance of high-rise office buildings in Malaysia / Au Yong Cheong Peng
by: Au Yong, Cheong Peng
Published: (2013)
by: Au Yong, Cheong Peng
Published: (2013)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Similar Items
-
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008) -
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018) -
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018) -
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010) -
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)