Bim: the setback or solution to project cost issues in Malaysia construction industry?
Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (B...
| Main Authors: | Ang, P S E, Pung, Y L, Tsai, K L, Zulkaply, M NA, Tey, J S, Kasim, N B, Osman, M H, Musa, M K, Abdul Rahman, M A |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2020
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/4684/ http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf |
Similar Items
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018)
by: Alnadish, Adham, et al.
Published: (2018)
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
by: Shaikh, Haseeb Halim
Published: (2021)
by: Shaikh, Haseeb Halim
Published: (2021)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan
by: Kong, H. P., et al.
Published: (2018)
by: Kong, H. P., et al.
Published: (2018)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
The challenges Of quantity surveying practice in
sustainable construction project
by: Che Haron, Roziha, et al.
Published: (2017)
by: Che Haron, Roziha, et al.
Published: (2017)
A generic process of documentation and data management for historical Malay architecture using BIM
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
Overcoming setback
by: UMP, PNC
Published: (2020)
by: UMP, PNC
Published: (2020)
New towns in Peninsular Malaysia: planning and development / Dasimah Omar
by: Omar, Dasimah
Published: (2004)
by: Omar, Dasimah
Published: (2004)
Impact of procurement methods and project types on construction projects performance / Jimoh Richard, Oyewobi Luqman and Aliu Nurayn
by: Richard, Jimoh, et al.
Published: (2015)
by: Richard, Jimoh, et al.
Published: (2015)
Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
A Kinetic and electrochemical study of the dissolution of gold in aerated cyanide solutions: the role of solid and solution phase purity
by: Jeffrey, Matthew I.
Published: (1997)
by: Jeffrey, Matthew I.
Published: (1997)
Kesan pengangkutan LRT (Transit Laju Ringan) terhadap mobiliti penduduk bandar (kes kajian: Kuala Lumpur) / Maimoon Zainal
by: Zainal, Maimoon
Published: (1998)
by: Zainal, Maimoon
Published: (1998)
Kajian terhadap kepentingan dan penggunaan kawasan lapang bagi kawasan perumahan awam / Syamsuri Daud
by: Daud, Syamsuri
Published: (1999)
by: Daud, Syamsuri
Published: (1999)
An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review
by: Vigneault, M.A., et al.
Published: (2019)
by: Vigneault, M.A., et al.
Published: (2019)
Earthquake induced pounding response between two adjacent buildings with setback
by: Bi, Kaiming, et al.
Published: (2016)
by: Bi, Kaiming, et al.
Published: (2016)
The Establishment Of Setback Distance For Malodour Mitigation From Palm Oil Mill
by: Yaacof, Nurashikin
Published: (2017)
by: Yaacof, Nurashikin
Published: (2017)
Faktor Sosio-Ekonomi Dan Demografi Yang Mempengaruhi Pilihan Pekerjaan Di Sumatera Selatan, Indonesia : Identifikasi, Analisis Dan Implikasinya [HD5701.5. T216 2007 f rb].
by: Abdul Madjid Sariman, Tatang
Published: (2007)
by: Abdul Madjid Sariman, Tatang
Published: (2007)
MY SAY: Replacing foreign maids with local home managers
by: Abd Razak, Dzulkifli
Published: (2010)
by: Abd Razak, Dzulkifli
Published: (2010)
Sometimes, it doesn't figure
by: Abd Razak, Dzulkifli
Published: (2005)
by: Abd Razak, Dzulkifli
Published: (2005)
Hala tuju graduan vokasional : kajian ke atas keperluan dan kesesuaian kursus elektrikal di Institut Kemahiran Belia Negara (IKBN) [HD5706. N737 2008 f rb].
by: Mohamed Salleh, Mohamed Nizam
Published: (2008)
by: Mohamed Salleh, Mohamed Nizam
Published: (2008)
JKE 214E/ JKE 314E - Labour Economics [Ekonomi Buruh]
by: PPSKM, Pusat Pengajian Sains Kemasyarakatan
Published: (2017)
by: PPSKM, Pusat Pengajian Sains Kemasyarakatan
Published: (2017)
JKP214E/JKP314E – Labour Economics [Ekonomi Buruh]
by: PPSKM, Pusat Pengajian Sains Kemasyarakatan
Published: (2019)
by: PPSKM, Pusat Pengajian Sains Kemasyarakatan
Published: (2019)
Preliminary contractual framework for BIM-enabled projects
by: Chong, Heap Yih, et al.
Published: (2017)
by: Chong, Heap Yih, et al.
Published: (2017)
Radiographic condylar changes following vertical subsigmoid osteotomy in different setback magnitudes
by: Subramaniam, Pram Kumar, et al.
Published: (2015)
by: Subramaniam, Pram Kumar, et al.
Published: (2015)
Pengurusan penyelenggaraan bangunan ITM Kelantan yang baru / Mohd. Aminudin Abdul Muluk
by: Abdul Muluk, Mohd. Aminudin
Published: (1996)
by: Abdul Muluk, Mohd. Aminudin
Published: (1996)
A combinatorial investigation of sputtered Ta-Al-C thin films
by: Tucker, Mark, et al.
Published: (2014)
by: Tucker, Mark, et al.
Published: (2014)
Compact City and Mayoral Entrepreneurship: A Study of Success and Setbacks in Two Japanese Cities
by: Takao, Yasuo
Published: (2024)
by: Takao, Yasuo
Published: (2024)
Seismic Fragility Assessment Of Moment-Resisting Concrete Frame With Setback Under Repeated Earthquake
by: Lau, Ji Wei
Published: (2017)
by: Lau, Ji Wei
Published: (2017)
Similar Items
-
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015) -
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018) -
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020) -
In-success factor for project management in high-rise building project
by: Yahya Al-Tawil, Yahya Mohsen
Published: (2019)