Optimized preference of security staff scheduling using integer linear programming approach
This paper proposes an optimized schedule for security staff using integer linear programming approach. It is important to improve the life quality of the security staff since the negative social life such as family problems, less social support or even stress following from a poor work schedule. Th...
| Main Authors: | Ang, Shin Yin, Mohd Razali, Siti Noor Asyikin, Kek, Sie Long |
|---|---|
| Format: | Article |
| Published: |
COMPUSOFT
2019
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/4603/ |
Similar Items
Integer linear programming on preference maximized of workforce scheduling
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Comparison between ANN and multiple linear regression models for prediction of warranty cost
by: Darmawan, Mohd Faaizie, et al.
Published: (2018)
by: Darmawan, Mohd Faaizie, et al.
Published: (2018)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Investigation of curing silver conductive inks on fabrics using dlp projector and hot plate
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Effects of two-step post heat-treatment in palm oil on the properties of oil palm trunk particleboard
by: Hua, Lee Seng, et al.
Published: (2018)
by: Hua, Lee Seng, et al.
Published: (2018)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
Similar Items
-
Integer linear programming on preference maximized of workforce scheduling
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018) -
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)