Time is one of the main important elements which should be taken into consideration during implementation of construction industry projects and project management life cycle as a whole and can be considered as one of the most significant parameters of a project and the main critical factor that dete...
| Main Authors: | Ahmed Al-Fadhali, Najib Mohammed, Zainal, Rozlin |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Medwell Jommls
2017
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/4583/ http://eprints.uthm.edu.my/4583/1/AJ%202017%20%28202%29%20A%20theoretical%20framework%20on%20factors%20causing%20delay.pdf |
Similar Items
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
Structural equation modelling of construction waste root causes and waste generation rate in Malaysian construction industry
by: Kaliannan, Suaathi
Published: (2021)
by: Kaliannan, Suaathi
Published: (2021)
Improving communication between client and contractor during construction project in Nigerian construction industry
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
The impact of material management on construction project delivery in Somalia
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
The awareness of ICT implementation for materials management in construction projects
by: Kasim, Narimah, et al.
Published: (2010)
by: Kasim, Narimah, et al.
Published: (2010)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Factors affecting quality in Construction Project Life Cycle (CPLC)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
Study on promote occupational safety and health practices in construction projects
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
Decision-making process framework at the planning phase of housing development project
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)
by: Ismail, Hassan
Published: (2020)
Assessing causes of contractual disputes from different type of condition of contracts
by: Che Haron, Roziha, et al.
Published: (2021)
by: Che Haron, Roziha, et al.
Published: (2021)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Perceptions of developers in green home project in Kuala Lumpur
by: Alsaeedi, Yaser Abdulwahab Ali
Published: (2019)
by: Alsaeedi, Yaser Abdulwahab Ali
Published: (2019)
Application of structural equation modelling in construction management research
by: Sia, Mal Kong, et al.
Published: (2010)
by: Sia, Mal Kong, et al.
Published: (2010)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
Examining risk as guideline in design stage for green
retrofits projects: a review
by: M. S. N., Lee, et al.
Published: (2020)
by: M. S. N., Lee, et al.
Published: (2020)
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
Countrywide survey on ISO 9001-certified companies in Malaysian construction industry
by: Sia, Mal Kong, et al.
Published: (2009)
by: Sia, Mal Kong, et al.
Published: (2009)
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
Use of waste optical disc in concrete to promote Sustainable development in construction industry
by: Chee Kang, Neo, et al.
Published: (2018)
by: Chee Kang, Neo, et al.
Published: (2018)
Work safety behaviour model for improving safety in construction industry using Bayesian Network
by: Zid, Chaher
Published: (2020)
by: Zid, Chaher
Published: (2020)
Critical success factor model framework for lean management application in industrialised building system (IBS) production
by: Mohd Noor, Siti Rahimah
Published: (2020)
by: Mohd Noor, Siti Rahimah
Published: (2020)
Assessing the level of community involvement in post-disaster
housing reconstruction and current green design practices towards
net-zero energy buildings
by: M, Sulzakimin, et al.
Published: (2020)
by: M, Sulzakimin, et al.
Published: (2020)
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
Effect of river indus sand on concrete tensile strength
by: Lakhiar, Muhammad Tahir, et al.
Published: (2018)
by: Lakhiar, Muhammad Tahir, et al.
Published: (2018)
Thermo‑mechanical properties of various densities of foamed concrete incorporating polypropylene fibres
by: Ahmed Jhatial, Ashfaque, et al.
Published: (2020)
by: Ahmed Jhatial, Ashfaque, et al.
Published: (2020)
Utilization of palm oil fuel ash and eggshell powder as partial cement replacement - a review
by: Ahmed Jhatial, Ashfaque, et al.
Published: (2016)
by: Ahmed Jhatial, Ashfaque, et al.
Published: (2016)
Mechanical properties of the concrete containing porcelain waste as sand
by: Jamal, Mohammed, et al.
Published: (2018)
by: Jamal, Mohammed, et al.
Published: (2018)
Influence of Crisscross Fiberglass Strip on Axial Compressive Strength of Lightweight Foamed Concrete
by: Md Azree Othuman Mydin, Md Azree Othuman Mydin, et al.
Published: (2023)
by: Md Azree Othuman Mydin, Md Azree Othuman Mydin, et al.
Published: (2023)
Durability Properties of Lightweight Foamed Concrete Reinforced With ‘Musa Acuminate’ Fibre
by: Othuman Mydin, Md Azree, et al.
Published: (2023)
by: Othuman Mydin, Md Azree, et al.
Published: (2023)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
by: Musaa, M. K., et al.
Published: (2021)
by: Musaa, M. K., et al.
Published: (2021)
Concrete brick properties incorporating EPS and POFA as replacement materials
by: Adnan, Suraya Hani, et al.
Published: (2021)
by: Adnan, Suraya Hani, et al.
Published: (2021)
Removal of phosphorus from synthetic wastewater using recycled concrete aggregates as a filter medium
by: Adnan, Suraya Hani, et al.
Published: (2018)
by: Adnan, Suraya Hani, et al.
Published: (2018)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
Effect of rubber powder particle on the strength of foamed concrete
by: Abdullah, Siti Radziah, et al.
Published: (2017)
by: Abdullah, Siti Radziah, et al.
Published: (2017)
Determinants of contractor satisfaction
by: Masrom, M. A .N., et al.
Published: (2013)
by: Masrom, M. A .N., et al.
Published: (2013)
Similar Items
-
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019) -
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020) -
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021) -
Structural equation modelling of construction waste root causes and waste generation rate in Malaysian construction industry
by: Kaliannan, Suaathi
Published: (2021) -
Improving communication between client and contractor during construction project in Nigerian construction industry
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)