Critical gap analysis of merging sections at Kuala Lumpur middle ring road
At merging sections, drivers normally slow down and sometimes need to stop while seeking a suitable gap before merging with the mainstream. Thus, there will always be several observed rejected gaps and an accepted gap which can be used to determine the smallest average gap, so-called critical gap. T...
| Main Authors: | Sanik, M. E., Rahimi, N. F. L., Hamid, N. B., M. Nor, A. H., Prasetijo, J., Razali, N. F. |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit UTeM
2017
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/4540/ http://eprints.uthm.edu.my/4540/1/AJ%202017%20%28172%29%20Critical%20gap%20analysis%20of%20merging%20sections%20at%20Kuala%20Lumpur%20middle%20ring%20road.pdf |
Similar Items
Performance analysis of road section and unsignalized intersections on Jalan Cileungsi Setu and Jalan Raya Narogong
by: Isradi, Muhammad, et al.
Published: (2021)
by: Isradi, Muhammad, et al.
Published: (2021)
Numerical modelling in investigation of road failure on Malaysia peat soil
by: Bachok @ Andi Yusoff, Andi Norasyikin
Published: (2008)
by: Bachok @ Andi Yusoff, Andi Norasyikin
Published: (2008)
Evaluating Signalized Intersection Capacity Based On Malaysian Road Conditions [TE228. N974 2007 f rb].
by: Zainal Abidin, Nurikhwani Idayu
Published: (2007)
by: Zainal Abidin, Nurikhwani Idayu
Published: (2007)
Performance evaluation for high speed vehicle in VANET
by: Alwan, Mohammed Hasan, et al.
Published: (2018)
by: Alwan, Mohammed Hasan, et al.
Published: (2018)
Estimation Of Turning Adjustment Factors At Signalised Intersections According To Malaysian Traffic Conditions [TE228. H829 2007 f rb].
by: Hossain, Quazi Sazzad
Published: (2007)
by: Hossain, Quazi Sazzad
Published: (2007)
Recycling kinetic energy from speed bump to generate electricity
by: Atan, Farraniza
Published: (2013)
by: Atan, Farraniza
Published: (2013)
Penilaian nano zink oksida keatas campuran asfalt terhadap kerosakan kelembapan
by: Mohd Yunus, Khairul Nizam, et al.
Published: (2021)
by: Mohd Yunus, Khairul Nizam, et al.
Published: (2021)
Proses penjanaan profil permukaan jalanraya
by: Buhari, Rosnawati, et al.
Published: (2021)
by: Buhari, Rosnawati, et al.
Published: (2021)
Enhanced snr-based admission control algorithm for vehicular ad-hoc network
by: Alwan Alrubaye, Mohammed Hasan
Published: (2020)
by: Alwan Alrubaye, Mohammed Hasan
Published: (2020)
An efficient up-link load reduction model based on clustering in vanets
by: Abbas Al-Sallami, Ali Hashim
Published: (2019)
by: Abbas Al-Sallami, Ali Hashim
Published: (2019)
Asphalt binder and mixture performance using Batu Pahat soft clay as modifier
by: Al Allam, Allam Musbah
Published: (2017)
by: Al Allam, Allam Musbah
Published: (2017)
The effects of micro and nano size bauxite particles in modified asphalt binders and asphaltic mixtures
by: Abdulhamed Elghatas, Hamza Mohamed
Published: (2020)
by: Abdulhamed Elghatas, Hamza Mohamed
Published: (2020)
The influence of transmission range on the performance of Vehicular AD-HOC Network (VANET)
by: Mohammed Ghawbar, Fayad Mohammed
Published: (2015)
by: Mohammed Ghawbar, Fayad Mohammed
Published: (2015)
Numerical modelling in investigation of road failure on Malaysian peat soil
by: Bachok @ Andi Yusoff, Andi Norasyikin
Published: (2008)
by: Bachok @ Andi Yusoff, Andi Norasyikin
Published: (2008)
Developing new chemical–rheological models and chemical–durability indices of bitumen
by: Hermadi, Madi
Published: (2013)
by: Hermadi, Madi
Published: (2013)
The effect of bitumen rheology to the permanent deformation of an asphalt concrete mixture
by: Muhamad Tarmidi, Mahvidayanti
Published: (2005)
by: Muhamad Tarmidi, Mahvidayanti
Published: (2005)
The effect of bitumen rheology to the permanent deformation of an asphalt concrete mixture
by: Muhamad Tarmidi, Mahvidayanti
Published: (2005)
by: Muhamad Tarmidi, Mahvidayanti
Published: (2005)
First Semester Examination Academic Session 2018/2019
December 2018/January 2019 EAA483 – Construction Management (Pengurusan Binaan) Duration: 2 hours
(Masa: 2 jam)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2019)
Road maintenance management system by public work department / Mohamad Helmi Misdi
by: Misdi, Mohamad Helmi
Published: (2014)
by: Misdi, Mohamad Helmi
Published: (2014)
Repair of major road embankment failure using reinforced earth (re) wall
by: Jamalludin, Damanhuri, et al.
Published: (2010)
by: Jamalludin, Damanhuri, et al.
Published: (2010)
A framework for sustainable construction in railway infrastructure projects / Assa Amiril
by: Amiril, Assa
Published: (2017)
by: Amiril, Assa
Published: (2017)
Maintenance of highway elevated structure in Malaysia / Nadeah Khairunnisa Noor Kamal
by: Noor Kamal, Nadeah Khairunnisa
Published: (2010)
by: Noor Kamal, Nadeah Khairunnisa
Published: (2010)
Pengurusan penyelenggaraan lebuhraya Malaysia dalam menyediakan laluan yang selamat, selesa dan sempurna. Kes kajian : Lebuhraya Wilayah Tengah / Mohamad Nurul Azmi Mat Nor
by: Mat Nor, Mohamad Nurul Azmi
Published: (1999)
by: Mat Nor, Mohamad Nurul Azmi
Published: (1999)
Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
by: Jumali, Saiful
Published: (2014)
by: Jumali, Saiful
Published: (2014)
Kajian sistem penyenggaraan jalan raya Shah Alam dari aspek keselamatan dan keselesaan / Hilman Tulot
by: Tulot, Hilman
Published: (2000)
by: Tulot, Hilman
Published: (2000)
Comparative study of life cycle cost and pavement performance on road rehabilitation methods
by: Ayob, Mohd Fairullazi, et al.
Published: (2015)
by: Ayob, Mohd Fairullazi, et al.
Published: (2015)
Modelling Malaysian road accident deaths : an econometric approach / Wan Fairos Wan Yaacob and Wan Zakiyatussariroh Wan Husin
by: Wan Yaacob, Wan Fairos, et al.
Published: (2006)
by: Wan Yaacob, Wan Fairos, et al.
Published: (2006)
Investigation of Life Cycle Cost (LCC) data inputs of flexible pavement in Klang Valley
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Investigation of quality of data input in life cycle cost analysis of rigid pavement type
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2015)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2015)
Safe avoidance path detection using multi sensor integration for small unmanned aerial vehicle
by: Ramli, Muhammad Faiz, et al.
Published: (2018)
by: Ramli, Muhammad Faiz, et al.
Published: (2018)
Protocol of Life Cycle Cost (LCC) data input requirements process of road pavement types.
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
A method and system for road pavement life cycle cost analysis
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
A review on the state of cost data inputs of Life Cycle Cost (LCC) for rigid pavement maintenance and rehabilitation in Malaysia
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2018)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2018)
A methodology to investigate the readiness of cost data inputs for the estimation of total cost of a new flexible pavement construction in Malaysia
by: Bidi, Nor Khalisah, et al.
Published: (2017)
by: Bidi, Nor Khalisah, et al.
Published: (2017)
A review on the quality of data inputs in life cycle cost analysis of rigid pavement maintenance in Malaysia
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2017)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2017)
Road and Railway Foundation Response to Moisture Content and Drainage
by: Chu, Xuanxuan
Published: (2023)
by: Chu, Xuanxuan
Published: (2023)
A solar assisted desalination system using heat pump
by: Hawlader, Mohammad Nurul Alam, et al.
Published: (2011)
by: Hawlader, Mohammad Nurul Alam, et al.
Published: (2011)
Optimization of an integrated solar heat-pump system
by: Hawlader, Mohammad Nurul Alam, et al.
Published: (2011)
by: Hawlader, Mohammad Nurul Alam, et al.
Published: (2011)
Relationship between merging lane length and motorcyclist’s head check behavior during merging in
expressway
by: Ammar, Adnan, et al.
Published: (2018)
by: Ammar, Adnan, et al.
Published: (2018)
Repair of major road embankment failure using reinforced earth (RE) wall / Damanhuri Jamalludin ... [et al.]
by: Jamalludin, Damanhuri, et al.
Published: (2015)
by: Jamalludin, Damanhuri, et al.
Published: (2015)
Similar Items
-
Performance analysis of road section and unsignalized intersections on Jalan Cileungsi Setu and Jalan Raya Narogong
by: Isradi, Muhammad, et al.
Published: (2021) -
Numerical modelling in investigation of road failure on Malaysia peat soil
by: Bachok @ Andi Yusoff, Andi Norasyikin
Published: (2008) -
Evaluating Signalized Intersection Capacity Based On Malaysian Road Conditions [TE228. N974 2007 f rb].
by: Zainal Abidin, Nurikhwani Idayu
Published: (2007) -
Performance evaluation for high speed vehicle in VANET
by: Alwan, Mohammed Hasan, et al.
Published: (2018) -
Estimation Of Turning Adjustment Factors At Signalised Intersections According To Malaysian Traffic Conditions [TE228. H829 2007 f rb].
by: Hossain, Quazi Sazzad
Published: (2007)