Comparison between ANN and multiple linear regression models for prediction of warranty cost
Nowadays, warranty has its own priority in business strategy for a manufacturer to protect their benefit as well as the intense competition between the manufacturers. In fact, warranty is a contract between manufacturer and buyer in which the manufacturer gives the buyer certain assurances as the co...
| Main Authors: | Darmawan, Mohd Faaizie, Jamahir, NurIzzati, Saedudin, Rd. Rohmat, Kasim, Shahreen |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit UTHM
2018
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/3656/ http://eprints.uthm.edu.my/3656/1/AJ%202018%20%28710%29%20Comparison%20between%20ANN%20and%20multiple%20linear%20regression%20models%20for%20prediction%20of%20warranty%20cost.pdf |
Similar Items
Comparison between ANN and multiple linear regression models for prediction of warranty cost
by: Mohd Faaizie, Darmawan, et al.
Published: (2018)
by: Mohd Faaizie, Darmawan, et al.
Published: (2018)
Strategic factors on interpreting remanufacturing quality-
Certifying framework to address warranty aftermarket for
Malaysian industry
by: N, Mohamed, et al.
Published: (2018)
by: N, Mohamed, et al.
Published: (2018)
Design optimization of ANN-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
Diagnosis of bivariate process variation using an integrated mspc-ann scheme
by: Masood, Ibrahim, et al.
Published: (2016)
by: Masood, Ibrahim, et al.
Published: (2016)
Design optimization of ann-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
A study on extrusion of multiple material bonding for fused depostion modeling
by: Azahari, Mohamad Azhar
Published: (2014)
by: Azahari, Mohamad Azhar
Published: (2014)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Investigation of curing silver conductive inks on fabrics using dlp projector and hot plate
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
Printing and curing of conductive ink track on fabric using syringe deposition system with DLP projector and hot plate
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
by: Khirotdin, Rd. Khairilhijra, et al.
Published: (2017)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Printing and curing silver conductive ink tracks from modified on-shelf inkjet printer on fabric
by: Khirotdin, Rd Khairilhijra', et al.
Published: (2017)
by: Khirotdin, Rd Khairilhijra', et al.
Published: (2017)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN -APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204-ATW222 - PENGURUSAN PENGELUARAN - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
EMG 240 - TEKNOLOGI PEMBUATAN I SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
EMG 340 - TEKNOLOGI PEMBUATAN II SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
Similar Items
-
Comparison between ANN and multiple linear regression models for prediction of warranty cost
by: Mohd Faaizie, Darmawan, et al.
Published: (2018) -
Strategic factors on interpreting remanufacturing quality-
Certifying framework to address warranty aftermarket for
Malaysian industry
by: N, Mohamed, et al.
Published: (2018) -
Design optimization of ANN-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013) -
Diagnosis of bivariate process variation using an integrated mspc-ann scheme
by: Masood, Ibrahim, et al.
Published: (2016) -
Design optimization of ann-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)