Tool path generation of contour parallel based on ant colony optimisation
In today’s competitive market of manufacturing industry, shorter machining time is one of important factor for reducing the manufacturer’s cost. This paper presents the minimisation of machining time of computer numerical control (CNC) by eliminating the uncut region of sharp corner based on contour...
| Main Authors: | Abdullah, Haslina, Ramli, Rizauddin, Abd Wahab, Dzuraidah, Abu Qudeiri, Jaber |
|---|---|
| Format: | Article |
| Published: |
UTM Press.
2016
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/3623/ |
Similar Items
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018)
by: Abdullah, Haslina, et al.
Published: (2018)
Minimizing machining airtime motion with an ant colony algorithm
by: Abdullah, Haslina, et al.
Published: (2016)
by: Abdullah, Haslina, et al.
Published: (2016)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
A review on the selection of lean production tools and techniques
by: Yahya, Mohd Shahir, et al.
Published: (2016)
by: Yahya, Mohd Shahir, et al.
Published: (2016)
Lean tools and techniques: a comparison between Malaysian manufacturing and services organisations
by: Yahya, Mohd Shahir, et al.
Published: (2018)
by: Yahya, Mohd Shahir, et al.
Published: (2018)
A contingency-based decision support instrument for selecting lean production tools and techniques
by: Yahya, Mohd Shahir
Published: (2021)
by: Yahya, Mohd Shahir
Published: (2021)
Optimisation deep drawing process parameters using FE simulation
by: Katimon, Mohd Nizam
Published: (2008)
by: Katimon, Mohd Nizam
Published: (2008)
Cost optimisation of Malaysia medicine inventory through demand forecasting and nonlinear inventory model
by: Mathelinea, Devy
Published: (2021)
by: Mathelinea, Devy
Published: (2021)
Elements and materials improve the FDM products: a review
by: Bala, Abduladim Salem, et al.
Published: (2016)
by: Bala, Abduladim Salem, et al.
Published: (2016)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
Quality control improvement at Jana DCS Sdn. Bhd.
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN -APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204-ATW222 - PENGURUSAN PENGELUARAN - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
EMG 240 - TEKNOLOGI PEMBUATAN I SEPT 1997.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (1997)
Similar Items
-
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018) -
Minimizing machining airtime motion with an ant colony algorithm
by: Abdullah, Haslina, et al.
Published: (2016) -
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021) -
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015) -
A review on the selection of lean production tools and techniques
by: Yahya, Mohd Shahir, et al.
Published: (2016)