Application of structural equation modelling in construction management research
This paper, based on Deming’s quality management (QM) theory embodied in ISO 9001, uses structural equation modelling (SEM) in a construction management research. Based on 100 usable responses collected from a nationwide survey carried out from 14th February to 30th May 2008 on all key players in th...
| Main Authors: | Sia, Mal Kong, Gomez, Christy Pathrose, Abd. Hamid, Zuhairi |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
David Publishing
2010
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/3529/ http://eprints.uthm.edu.my/3529/1/AJ%202017%20%2873%29%20Application%20of%20structural%20equation%20modelling.pdf |
Similar Items
Countrywide survey on ISO 9001-certified companies in Malaysian construction industry
by: Sia, Mal Kong, et al.
Published: (2009)
by: Sia, Mal Kong, et al.
Published: (2009)
Structural equation modelling of construction waste root causes and waste generation rate in Malaysian construction industry
by: Kaliannan, Suaathi
Published: (2021)
by: Kaliannan, Suaathi
Published: (2021)
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Improving communication between client and contractor during construction project in Nigerian construction industry
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
by: Ishaq, Ishaq Muktar, et al.
Published: (2019)
Overview of empirical equation prediction for ultimate axial load of precast lightweight foamed concrete sandwich panel (PLFP)
by: Goh, Wan Inn, et al.
Published: (2016)
by: Goh, Wan Inn, et al.
Published: (2016)
The impact of material management on construction project delivery in Somalia
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021)
The awareness of ICT implementation for materials management in construction projects
by: Kasim, Narimah, et al.
Published: (2010)
by: Kasim, Narimah, et al.
Published: (2010)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Factors affecting quality in Construction Project Life Cycle (CPLC)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
by: Yaman, Siti Khalijah, et al.
Published: (2022)
Study on promote occupational safety and health practices in construction projects
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018)
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
by: Abdullah, Fatehi Mansoor Saad
Published: (2018)
Use of waste optical disc in concrete to promote Sustainable development in construction industry
by: Chee Kang, Neo, et al.
Published: (2018)
by: Chee Kang, Neo, et al.
Published: (2018)
Work safety behaviour model for improving safety in construction industry using Bayesian Network
by: Zid, Chaher
Published: (2020)
by: Zid, Chaher
Published: (2020)
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)
by: Ismail, Hassan
Published: (2020)
Technology of crack detection in reinforced concrete structures
by: Wan Jusoh, Wan Arnizah, et al.
Published: (2020)
by: Wan Jusoh, Wan Arnizah, et al.
Published: (2020)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
Relationship between ae signal strength and absolute energy in determining damage classification of concrete structures
by: Shahidan, Shahiron Sh, et al.
Published: (2016)
by: Shahidan, Shahiron Sh, et al.
Published: (2016)
Structural analysis of long arm excavator boom for optimization performance under maximum breakout condition
by: A. Rashid, Mohamad Syafiq, et al.
Published: (2020)
by: A. Rashid, Mohamad Syafiq, et al.
Published: (2020)
Proceedings of the Sustainable Concrete Materials and Structures in Construction 2020
by: Mohd Zuki, Sharifah Salwa, et al.
Published: (2020)
by: Mohd Zuki, Sharifah Salwa, et al.
Published: (2020)
Flexural strength of concrete prism strengthened using CFRP with modified mortar
by: Radzuan, Nurshafiqah, et al.
Published: (2020)
by: Radzuan, Nurshafiqah, et al.
Published: (2020)
Reinforced Concrete Beams with Opening Strengthened using
CFRP Sheets
by: Ali, Noorwirdawati, et al.
Published: (2019)
by: Ali, Noorwirdawati, et al.
Published: (2019)
Nonlinear finite element analysis of reinforced concrete beams strengthened with textile fine grained mortar
by: Jamellodin, Zalipah, et al.
Published: (2020)
by: Jamellodin, Zalipah, et al.
Published: (2020)
Performance of independent horizontal and inclined bars as shear reinforcement for reinforced concrete beams
by: Abdul Hamid, Noor Azlina, et al.
Published: (2020)
by: Abdul Hamid, Noor Azlina, et al.
Published: (2020)
A study on the characteristic of an eco-brick as a replacement to the conventional brick
by: Ali, Roslinda, et al.
Published: (2020)
by: Ali, Roslinda, et al.
Published: (2020)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Cooling panel wall system with difference types of cooling mediums
by: Salleh, Norhafizah, et al.
Published: (2020)
by: Salleh, Norhafizah, et al.
Published: (2020)
Concrete brick properties incorporating EPS and POFA as replacement materials
by: Adnan, Suraya Hani, et al.
Published: (2021)
by: Adnan, Suraya Hani, et al.
Published: (2021)
Flexural capacity of CFRP-strengthened reinforced concrete beam with circular web openings in flexure zone
by: Abdul Hamid, Noor Azlina, et al.
Published: (2020)
by: Abdul Hamid, Noor Azlina, et al.
Published: (2020)
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
by: Musaa, M. K., et al.
Published: (2021)
by: Musaa, M. K., et al.
Published: (2021)
Removal of phosphorus from synthetic wastewater using recycled concrete aggregates as a filter medium
by: Adnan, Suraya Hani, et al.
Published: (2018)
by: Adnan, Suraya Hani, et al.
Published: (2018)
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
Effect of rubber powder particle on the strength of foamed concrete
by: Abdullah, Siti Radziah, et al.
Published: (2017)
by: Abdullah, Siti Radziah, et al.
Published: (2017)
Determinants of contractor satisfaction
by: Masrom, M. A .N., et al.
Published: (2013)
by: Masrom, M. A .N., et al.
Published: (2013)
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
Similar Items
-
Countrywide survey on ISO 9001-certified companies in Malaysian construction industry
by: Sia, Mal Kong, et al.
Published: (2009) -
Structural equation modelling of construction waste root causes and waste generation rate in Malaysian construction industry
by: Kaliannan, Suaathi
Published: (2021) -
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021) -
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012) -
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)