Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
This paper proposes a heuristic that introduces the application of bottleneck-based concept at the beginning of an initial sequence determination with the objective of makespan minimization. Earlier studies found that the scheduling activity become complicated when dealing with machine, m greate...
| Main Authors: | N. A., Isa, S. A., Bareduan, A. S., Zainudin, M., Marsudi |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2939/ http://eprints.uthm.edu.my/2939/1/J12577_4adb3f68f2c5cba610f42e5e2629dbe9.pdf |
Similar Items
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020)
by: Isa, Noor Amira, et al.
Published: (2020)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017)
by: Isa, Noor Amira
Published: (2017)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Needs analysis of thinking style and higher order thinking skills for solving problems in producing products
by: Yee, Mei Heong, et al.
Published: (2022)
by: Yee, Mei Heong, et al.
Published: (2022)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Experimental study of welded joints on steel plate cold-rolledsheet metal using different electrode tips
by: Omar, N.I., et al.
Published: (2018)
by: Omar, N.I., et al.
Published: (2018)
Production management and improvement initiatives: case studies of two Malaysian manufacturing companies
by: Ab Latif, Mohd Noor Hisyam
Published: (2013)
by: Ab Latif, Mohd Noor Hisyam
Published: (2013)
Tribological evaluations of modified RBD palm olein-based lubricants in machining processes
by: T., Norfazillah, et al.
Published: (2018)
by: T., Norfazillah, et al.
Published: (2018)
Computerized value stream system (CVSS) to reduce waste in lean manufacturing operation
by: Hasan, S., et al.
Published: (2015)
by: Hasan, S., et al.
Published: (2015)
Development of new lean manufacturing approach through people development and process improvement as a mediator in the libyan companies
by: M. A. Ataalah, Abdurezzag
Published: (2019)
by: M. A. Ataalah, Abdurezzag
Published: (2019)
Tensile properties of Poly Lactic Acid (PLA)–Tungsten Trioxide (WO3) nano composites for 3D printing process
by: Shaath, M. L. M., et al.
Published: (2019)
by: Shaath, M. L. M., et al.
Published: (2019)
Integer linear programming on preference maximized of workforce scheduling
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
Control chart pattern recognition using small window size for identifying bivariate process mean shifts
by: Kasmin, A., et al.
Published: (2021)
by: Kasmin, A., et al.
Published: (2021)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
Cyber value stream system reduced waste and non-value added of manufacturing operation
by: Ahmad, A.N. Aizat, et al.
Published: (2015)
by: Ahmad, A.N. Aizat, et al.
Published: (2015)
Computerized value stream system (CVSS) untuk mengurangi limbah pada operasi lean manufaktur
by: Hasan, Sulaiman, et al.
Published: (2015)
by: Hasan, Sulaiman, et al.
Published: (2015)
Permutation flow shop scheduling: fuzzy particle swarm optimization approach
by: Ling, S., et al.
Published: (2011)
by: Ling, S., et al.
Published: (2011)
The influence of injection molding parameter on properties of thermally conductive plastic
by: Azis, N. Hafizah, et al.
Published: (2017)
by: Azis, N. Hafizah, et al.
Published: (2017)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Similar Items
-
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011) -
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020) -
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009) -
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021) -
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017)