Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment
Asset Management (AM) is the systematic and coordinated activity of an organization to realize value from assets, through which an organization optimally and sustainably manages its assets and asset systems, their associated performance, risk and expenditures over their life cycle for the purpose of...
| Main Authors: | , , , , , |
|---|---|
| Other Authors: | |
| Format: | Book Section |
| Language: | English |
| Published: |
Penerbit UTHM
2020
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2731/ http://eprints.uthm.edu.my/2731/1/Ch02.pdf |
| _version_ | 1848887822680850432 |
|---|---|
| author | S. Balasubramaniam, Yogendra Talib, Mohd Aizam Raj, Avinash Dzaki, Mohd Bala Sundaram, Mithila Seva Mohd Yousof, Mohd Fairouz |
| author2 | Mohd Jamail, Nor Akmal |
| author_facet | Mohd Jamail, Nor Akmal S. Balasubramaniam, Yogendra Talib, Mohd Aizam Raj, Avinash Dzaki, Mohd Bala Sundaram, Mithila Seva Mohd Yousof, Mohd Fairouz |
| author_sort | S. Balasubramaniam, Yogendra |
| building | UTHM Institutional Repository |
| collection | Online Access |
| description | Asset Management (AM) is the systematic and coordinated activity of an organization to realize value from assets, through which an organization optimally and sustainably manages its assets and asset systems, their associated performance, risk and expenditures over their life cycle for the purpose of achieving its organizational strategic plan. An effective AM System enables TNB Distribution to establish and verify a holistic view of asset management throughout an asset’s whole life. It facilitates an optimal mixture of capital, operations, maintenance, resourcing, risks, performance and sustainability within a framework of good governance. |
| first_indexed | 2025-11-15T20:00:30Z |
| format | Book Section |
| id | uthm-2731 |
| institution | Universiti Tun Hussein Onn Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T20:00:30Z |
| publishDate | 2020 |
| publisher | Penerbit UTHM |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | uthm-27312021-11-29T03:20:53Z http://eprints.uthm.edu.my/2731/ Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment S. Balasubramaniam, Yogendra Talib, Mohd Aizam Raj, Avinash Dzaki, Mohd Bala Sundaram, Mithila Seva Mohd Yousof, Mohd Fairouz TK3001-3521 Distribution or transmission of electric power Asset Management (AM) is the systematic and coordinated activity of an organization to realize value from assets, through which an organization optimally and sustainably manages its assets and asset systems, their associated performance, risk and expenditures over their life cycle for the purpose of achieving its organizational strategic plan. An effective AM System enables TNB Distribution to establish and verify a holistic view of asset management throughout an asset’s whole life. It facilitates an optimal mixture of capital, operations, maintenance, resourcing, risks, performance and sustainability within a framework of good governance. Penerbit UTHM Mohd Jamail, Nor Akmal Othman, Nordiana Azlin Kamarudin, Muhammad Saufi 2020 Book Section PeerReviewed text en http://eprints.uthm.edu.my/2731/1/Ch02.pdf S. Balasubramaniam, Yogendra and Talib, Mohd Aizam and Raj, Avinash and Dzaki, Mohd and Bala Sundaram, Mithila Seva and Mohd Yousof, Mohd Fairouz (2020) Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment. In: High Voltage Technologies. Penerbit UTHM, pp. 12-20. ISBN 978-967-2916-05-5 |
| spellingShingle | TK3001-3521 Distribution or transmission of electric power S. Balasubramaniam, Yogendra Talib, Mohd Aizam Raj, Avinash Dzaki, Mohd Bala Sundaram, Mithila Seva Mohd Yousof, Mohd Fairouz Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title | Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title_full | Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title_fullStr | Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title_full_unstemmed | Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title_short | Development of TNB distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| title_sort | development of tnb distribution network risk based asset replacement policy and guideline for medium voltage primary equipment |
| topic | TK3001-3521 Distribution or transmission of electric power |
| url | http://eprints.uthm.edu.my/2731/ http://eprints.uthm.edu.my/2731/1/Ch02.pdf |