Bottleneck-based heuristic for three-machine flow shop scheduling
This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...
| Main Author: | Abdul Rahim, Mohd Salleh |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2011
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2724/ http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf |
Similar Items
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
Machining feature-based system for supporting step-compliant milling process
by: Chen, Wong Keong
Published: (2017)
by: Chen, Wong Keong
Published: (2017)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
A three-stage methodology for design evaluation in product development
by: Mohd Turan, Faiz
Published: (2013)
by: Mohd Turan, Faiz
Published: (2013)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Tribological evaluations of modified RBD palm olein-based lubricants in machining processes
by: T., Norfazillah, et al.
Published: (2018)
by: T., Norfazillah, et al.
Published: (2018)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Design optimization of ann-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
Improvement design of existing threshing machine at Kilang Sawit Risda, Ulu Keratong
by: Gelau, Daryl, et al.
Published: (2020)
by: Gelau, Daryl, et al.
Published: (2020)
Work flow improvement at Kenny Leather (M) Sdn. Bhd.
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
Development of layout design and improvement of the working flow at Erul Food Industries
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2020)
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2020)
Two-level factorial design of the
pre-processing activities of polyamide 12
powder in selective laser sintering
three-dimensional printing process
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2020)
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2020)
Kajian terhadap sifat mekanik bagi jenis corak pengisian dalam proses pembuatan tiga demensi
by: Shamsudin, Muhamad Khairy
Published: (2014)
by: Shamsudin, Muhamad Khairy
Published: (2014)
Efficiency improvement of assembly line: case study of bus seat manufacturer
by: Yeoh, Kim Hao
Published: (2013)
by: Yeoh, Kim Hao
Published: (2013)
Developing people capabilities for the promotion of sustainability in facility management practices
by: Sarpin, Norliana
Published: (2015)
by: Sarpin, Norliana
Published: (2015)
A scheme for balanced monitoring and accurate diagnosis of bivariate process mean shifts
by: Masood, Ibrahim
Published: (2012)
by: Masood, Ibrahim
Published: (2012)
Camera stabilizer
by: Tuan Ibrahim, Tuan Mohd Hafeez, et al.
Published: (2020)
by: Tuan Ibrahim, Tuan Mohd Hafeez, et al.
Published: (2020)
Car wash water recycling system
by: Nawawi, Muhammad Amirul, et al.
Published: (2020)
by: Nawawi, Muhammad Amirul, et al.
Published: (2020)
Printing and curing silver conductive ink tracks from modified on-shelf inkjet printer on fabric
by: Khirotdin, Rd Khairilhijra', et al.
Published: (2017)
by: Khirotdin, Rd Khairilhijra', et al.
Published: (2017)
FM Help Desk: user complaint system as an FM approach for facilities management services in Universiti Tun Hussein Onn Malaysia (UTHM)
by: Shafie, Fazira
Published: (2013)
by: Shafie, Fazira
Published: (2013)
Study of artificial neural network scheme application in manufacturing industry for monitoring-diagnosis bivariate process variation
by: Majid, Mariam
Published: (2014)
by: Majid, Mariam
Published: (2014)
Synergistic artificial neural network scheme for monitoring and diagnosis of multivariate process variation in mean shifts
by: Marian, Mohd Fairuz
Published: (2014)
by: Marian, Mohd Fairuz
Published: (2014)
Mango (Harum Manis) quality grading system
by: Mohd Mokhtar, Mohd Firdaus
Published: (2014)
by: Mohd Mokhtar, Mohd Firdaus
Published: (2014)
Line and wall follower hexapod robot
by: Ibrahim, Mohd Tarmizi
Published: (2011)
by: Ibrahim, Mohd Tarmizi
Published: (2011)
Corporation robots
by: Mansour, Saleh Faraj
Published: (2011)
by: Mansour, Saleh Faraj
Published: (2011)
Production management and improvement initiatives: case studies of two Malaysian manufacturing companies
by: Ab Latif, Mohd Noor Hisyam
Published: (2013)
by: Ab Latif, Mohd Noor Hisyam
Published: (2013)
The effect of vortex well thickness on microstructure and mechanical properties of aluminium LM6
by: Hehsan, Haffidzudin
Published: (2013)
by: Hehsan, Haffidzudin
Published: (2013)
Production improvement in ACM manufacturing company using lean manufacturing approach
by: Sidek, Kamsidi @ Abd Malek
Published: (2013)
by: Sidek, Kamsidi @ Abd Malek
Published: (2013)
Parameter optimization for photo polymerization of mask projection micro stereolithography
by: kamarudin, Khairu
Published: (2013)
by: kamarudin, Khairu
Published: (2013)
A fuzzy approach to support DFA evaluation of design concepts
by: Omar, Badrul
Published: (2008)
by: Omar, Badrul
Published: (2008)
CIM control design using grafcet
by: Rusin, Siti Ruzaimah
Published: (2005)
by: Rusin, Siti Ruzaimah
Published: (2005)
Optimisation deep drawing process parameters using FE simulation
by: Katimon, Mohd Nizam
Published: (2008)
by: Katimon, Mohd Nizam
Published: (2008)
Performance evaluation of FDM water works system for ABS part
by: Marwah, Omar Mohd Faizan
Published: (2006)
by: Marwah, Omar Mohd Faizan
Published: (2006)
Similar Items
-
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009) -
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021) -
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)