Car wash water recycling system
The high rate of transportation and vehicle washing centers led to an increase in water consumption. When the water consumption increase, the amount of wastewater discharged and the cost of utility will also increase. Only the right technique used for washing the vehicles can minimize the amount of...
| Main Authors: | Nawawi, Muhammad Amirul, Kamisan, Muhamad Nurul Fitri, Adam, Nur Farah Aqilah, Tuan Ibrahim, Tuan Mohd Hafeez, Ismail, Fadillah |
|---|---|
| Other Authors: | Kassim, Noraniah |
| Format: | Book Section |
| Language: | English |
| Published: |
Penerbit UTHM
2020
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/2516/ http://eprints.uthm.edu.my/2516/1/Ch08%20Car%20wash%20water.pdf |
Similar Items
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018)
by: Abdullah, Haslina, et al.
Published: (2018)
Camera stabilizer
by: Tuan Ibrahim, Tuan Mohd Hafeez, et al.
Published: (2020)
by: Tuan Ibrahim, Tuan Mohd Hafeez, et al.
Published: (2020)
Portable organic water filter with the use of coconut shell and seashells
by: Ahmad Nordin, Norain, et al.
Published: (2020)
by: Ahmad Nordin, Norain, et al.
Published: (2020)
What is brand? Some insights in the historical development
by: Ur Rehman, Fazal, et al.
Published: (2018)
by: Ur Rehman, Fazal, et al.
Published: (2018)
Mechanical design of an automated vehicle driving system for drive cycle testing
by: Saini, Adam
Published: (2016)
by: Saini, Adam
Published: (2016)
Performance evaluation of FDM water works system for ABS part
by: Marwah, Omar Mohd Faizan
Published: (2006)
by: Marwah, Omar Mohd Faizan
Published: (2006)
The Relationship Between Employees' Safety Knowledge on Slips and Falls at Workplace and Working Environment A Case Study in Malayan Sugar Manufacturing Co. Bhd (MSM), Prai
by: Muhamad Fauzi, Ibrahim
Published: (2012)
by: Muhamad Fauzi, Ibrahim
Published: (2012)
Design optimization of ANN-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
Oil Palm Empty Fruit Bunch (OPEFB) handsheet production from optimized biodelignification of rhynchophorus ferrugineus microbiome’s enzymes
by: Mohd Aripin, Ashuvila, et al.
Published: (2020)
by: Mohd Aripin, Ashuvila, et al.
Published: (2020)
Improvement design of existing threshing machine at Kilang Sawit Risda, Ulu Keratong
by: Gelau, Daryl, et al.
Published: (2020)
by: Gelau, Daryl, et al.
Published: (2020)
Work flow improvement at Kenny Leather (M) Sdn. Bhd.
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
A study of micro to nano structure fine solid line printing for graphene ink by micro-flexographic printing method
by: Hassan, Suhaimi, et al.
Published: (2016)
by: Hassan, Suhaimi, et al.
Published: (2016)
Potential impacts for monitoring sustainability: case study of hollow fiber membrane
by: Mahmood, Salwa, et al.
Published: (2017)
by: Mahmood, Salwa, et al.
Published: (2017)
Sustainability in the product design: A review of recent development based on LCA
by: Mahmood, Salwa, et al.
Published: (2018)
by: Mahmood, Salwa, et al.
Published: (2018)
Two-level factorial design of the
pre-processing activities of polyamide 12
powder in selective laser sintering
three-dimensional printing process
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2020)
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2020)
Indoor air concentration from selective laser sintering 3d printer using Virgin Polyamide Nylon (PA12) Powder: a pilot study
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2019)
by: Muhamad Damanhuri, Amir Abdullah, et al.
Published: (2019)
Quality control improvement at Jana DCS Sdn. Bhd.
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
The mediating effect of green innovation on the relationship between green supply chain management and environmental performance
by: Abu Seman, Noor Aslinda, et al.
Published: (2019)
by: Abu Seman, Noor Aslinda, et al.
Published: (2019)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
by: Yin Lee, Jocelyn Ke, et al.
Published: (2021)
Sustainability-oriented application of value
stream mapping: a review and classification
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
by: Lee, Jocelyn Ke Yin, et al.
Published: (2021)
Kajian terhadap sifat mekanik bagi jenis corak pengisian dalam proses pembuatan tiga demensi
by: Shamsudin, Muhamad Khairy
Published: (2014)
by: Shamsudin, Muhamad Khairy
Published: (2014)
Design optimization of ann-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Similar Items
-
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018) -
Camera stabilizer
by: Tuan Ibrahim, Tuan Mohd Hafeez, et al.
Published: (2020) -
Portable organic water filter with the use of coconut shell and seashells
by: Ahmad Nordin, Norain, et al.
Published: (2020) -
What is brand? Some insights in the historical development
by: Ur Rehman, Fazal, et al.
Published: (2018) -
Mechanical design of an automated vehicle driving system for drive cycle testing
by: Saini, Adam
Published: (2016)