Structural modelling of cost overrun factors in construction industry

Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia...

Full description

Bibliographic Details
Main Author: Memon, Aftab Hameed
Format: Thesis
Language:English
English
English
Published: 2013
Subjects:
Online Access:http://eprints.uthm.edu.my/2190/
http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf
http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf
_version_ 1848887669207072768
author Memon, Aftab Hameed
author_facet Memon, Aftab Hameed
author_sort Memon, Aftab Hameed
building UTHM Institutional Repository
collection Online Access
description Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia. Cost overrun is resulted from various factors which are essential to identify for improving cost performance in construction project. Hence, this study focused on identifying and modelling the factors of cost overrun for construction projects in Malaysia. Data collection was done through structured questionnaire, which was designed based on 78 factors found from the literature. Qualitative pilot study was done based on the opinions of 15 experts in the construction industry to improve the questionnaire by reducing the factors to 58. The questionnaire survey was carried out among clients, consultants and contractors. A total of 231 questionnaires were collected of which 213 responses were found valid. Partial Least Square Structural Equation (PLS-SEM) model was developed based on 8 categories/constructs generated through factor analysis test and found that Global Fit Index (GOF) of the model to be 0.37. The findings from the model indicate that all the 8 categories have significant effect on the cost overrun. The most significant category is contractor's site management related issues with path co-efficient value of 0.448. The developed model was validated statistically (using power analysis and predictive relevancy) and through interviewing 21 experienced practitioners. Statistical validation tests showed that the developed model had achieved substantial power in explaining cost overrun problem. All the experts agreed with the factors and also categories of the model have significant impact to cost overrun.
first_indexed 2025-11-15T19:58:03Z
format Thesis
id uthm-2190
institution Universiti Tun Hussein Onn Malaysia
institution_category Local University
language English
English
English
last_indexed 2025-11-15T19:58:03Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling uthm-21902021-10-31T03:59:21Z http://eprints.uthm.edu.my/2190/ Structural modelling of cost overrun factors in construction industry Memon, Aftab Hameed TA Engineering (General). Civil engineering (General) TA630-695 Structural engineering (General) Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others. Of all these, cost overrun is a major problem that occurs globally including Malaysia. Cost overrun is resulted from various factors which are essential to identify for improving cost performance in construction project. Hence, this study focused on identifying and modelling the factors of cost overrun for construction projects in Malaysia. Data collection was done through structured questionnaire, which was designed based on 78 factors found from the literature. Qualitative pilot study was done based on the opinions of 15 experts in the construction industry to improve the questionnaire by reducing the factors to 58. The questionnaire survey was carried out among clients, consultants and contractors. A total of 231 questionnaires were collected of which 213 responses were found valid. Partial Least Square Structural Equation (PLS-SEM) model was developed based on 8 categories/constructs generated through factor analysis test and found that Global Fit Index (GOF) of the model to be 0.37. The findings from the model indicate that all the 8 categories have significant effect on the cost overrun. The most significant category is contractor's site management related issues with path co-efficient value of 0.448. The developed model was validated statistically (using power analysis and predictive relevancy) and through interviewing 21 experienced practitioners. Statistical validation tests showed that the developed model had achieved substantial power in explaining cost overrun problem. All the experts agreed with the factors and also categories of the model have significant impact to cost overrun. 2013-03 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf text en http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf Memon, Aftab Hameed (2013) Structural modelling of cost overrun factors in construction industry. Doctoral thesis, Universiti Tun Hussein Malaysia.
spellingShingle TA Engineering (General). Civil engineering (General)
TA630-695 Structural engineering (General)
Memon, Aftab Hameed
Structural modelling of cost overrun factors in construction industry
title Structural modelling of cost overrun factors in construction industry
title_full Structural modelling of cost overrun factors in construction industry
title_fullStr Structural modelling of cost overrun factors in construction industry
title_full_unstemmed Structural modelling of cost overrun factors in construction industry
title_short Structural modelling of cost overrun factors in construction industry
title_sort structural modelling of cost overrun factors in construction industry
topic TA Engineering (General). Civil engineering (General)
TA630-695 Structural engineering (General)
url http://eprints.uthm.edu.my/2190/
http://eprints.uthm.edu.my/2190/1/24p%20AFTAB%20HAMEED%20MEMON.pdf
http://eprints.uthm.edu.my/2190/2/AFTAB%20HAMEED%20MEMON%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2190/3/AFTAB%20HAMEED%20MEMON%20WATERMARK.pdf