A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
Flowshop is the most common production system in the industry, and there are many documented efforts to improve the performance of the flowshop. The range spreads from the usage of heuristics to metaheuristics, and one of the promising methods is NEH (Nawaz, Enscore & Ham) heuristics. This st...
| Main Author: | Sidek, Noor Azizah |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1832/ http://eprints.uthm.edu.my/1832/2/NOOR%20AZIZAH%20BINTI%20SIDEK%20-%20declaration.pdf http://eprints.uthm.edu.my/1832/1/NOOR%20AZIZAH%20BINTI%20SIDEK%20-%2024p.pdf http://eprints.uthm.edu.my/1832/3/NOOR%20AZIZAH%20BINTI%20SIDEK%20-%20full%20text.pdf |
Similar Items
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017)
by: Isa, Noor Amira
Published: (2017)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018)
by: Abdullah, Haslina, et al.
Published: (2018)
Tool path generation of contour parallel based on ant colony optimisation
by: Abdullah, Haslina, et al.
Published: (2016)
by: Abdullah, Haslina, et al.
Published: (2016)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Global gbest guided-artificial bee colony algorithm for numerical function optimization
by: Shah, Habib, et al.
Published: (2018)
by: Shah, Habib, et al.
Published: (2018)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020)
by: Isa, Noor Amira, et al.
Published: (2020)
Synergistic artificial neural network scheme for monitoring and diagnosis of multivariate process variation in mean shifts
by: Marian, Mohd Fairuz
Published: (2014)
by: Marian, Mohd Fairuz
Published: (2014)
Study of artificial neural network scheme application in manufacturing industry for monitoring-diagnosis bivariate process variation
by: Majid, Mariam
Published: (2014)
by: Majid, Mariam
Published: (2014)
Integer linear programming on preference maximized of workforce scheduling
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
by: Mohd Razali, Siti Noor Asyikin, et al.
Published: (2018)
A quick gbest guided artificial bee colony algorithm for stock market prices prediction
by: Shah, Habib, et al.
Published: (2018)
by: Shah, Habib, et al.
Published: (2018)
Production improvement in ACM manufacturing company using lean manufacturing approach
by: Sidek, Kamsidi @ Abd Malek
Published: (2013)
by: Sidek, Kamsidi @ Abd Malek
Published: (2013)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Similar Items
-
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017) -
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)