Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
Post Occupancy Evaluation (POE) is an activity of the building evaluation process with a focus on quality, operational performance and satisfaction of the occupants. The POE is important to evaluate completed and occupied buildings to identify weaknesses and potential for future improvement. To date...
| Main Authors: | Musaa, M. K., A. Rahman, M. A., H., Nurzalina, Lip, R. |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
2021
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1756/ http://eprints.uthm.edu.my/1756/1/J12112_0af41dabaa82c4a20f6214dc212ad88a.pdf |
Similar Items
Pembangunan instrumen penilaian pasca penghunian bagi perumahan bertingkat yang dibina menggunakan kaedah sistem binaan industri
by: Musa, Mohd Kamaruzaman
Published: (2022)
by: Musa, Mohd Kamaruzaman
Published: (2022)
Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam
Industri Binaan Serta Impak Terhadap Kos
by: Nordin, Mohd Taufik
Published: (2007)
by: Nordin, Mohd Taufik
Published: (2007)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Perbandingan kepuasan penghuni terhadap penyelenggaraan fasiliti perumahan bertingkat di Pantai Dalam Kuala Lumpur
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020)
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020)
Critical success factor model framework for lean management application in industrialised building system (IBS) production
by: Mohd Noor, Siti Rahimah
Published: (2020)
by: Mohd Noor, Siti Rahimah
Published: (2020)
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Noise assessment at construction site which uses IBS formwork system
by: Abas, Nor Haslinda, et al.
Published: (2018)
by: Abas, Nor Haslinda, et al.
Published: (2018)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
Keberkesanan sistem binaan berindustri (IBS) kerangka keluli
dalam pembinaan rumah teres
by: I.M.S. Usman,, et al.
Published: (2019)
by: I.M.S. Usman,, et al.
Published: (2019)
RAE 315 - SISTEM BANGUNAN BERINDUSTRI – APRIL 1987.
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1987)
by: PPPB, Pusat Pengajian Perumahan Dan Bangunan
Published: (1987)
Model keberkesanan pengurusan fasiliti perumahan bertingkat bukan kos rendah di Malaysia / Adi Irfan Che Ani
by: Adi Irfan, Che Ani
Published: (2007)
by: Adi Irfan, Che Ani
Published: (2007)
Kepuasan Penghuni Terhadap Kualiti Reka Bentuk Di Perumahan Kos Rendah Bertingkat Tinggi Di Pulau Pinang
by: Arshard, Wan Nur Rukiah Mohd
Published: (2019)
by: Arshard, Wan Nur Rukiah Mohd
Published: (2019)
Faktor penggunaan sistem binaan berindustri (IBS) di Malaysia
by: Che Ngah, Mohd Syafiq, et al.
Published: (2013)
by: Che Ngah, Mohd Syafiq, et al.
Published: (2013)
Kajian baseline sistem binaan bangunan berindustri (IBS): perspektif pemaju perumahan negeri Kedah dan Perlis
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012)
Rumah pangsa bertingkat jenis sederhana di Ulu Kelang / A. Karim Zakaria
by: Zakaria, A. Karim
Published: (1985)
by: Zakaria, A. Karim
Published: (1985)
Potensi pengunaan maklumat permodelan bangunan (BIM) dalam sistem binaan berindustri (IBS)
by: Mohamad, Mohamad Fildza Azwan, et al.
Published: (2013)
by: Mohamad, Mohamad Fildza Azwan, et al.
Published: (2013)
Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
by: Umar, Kassim
Published: (2015)
by: Umar, Kassim
Published: (2015)
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
Concrete brick properties incorporating EPS and POFA as replacement materials
by: Adnan, Suraya Hani, et al.
Published: (2021)
by: Adnan, Suraya Hani, et al.
Published: (2021)
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
Removal of phosphorus from synthetic wastewater using recycled concrete aggregates as a filter medium
by: Adnan, Suraya Hani, et al.
Published: (2018)
by: Adnan, Suraya Hani, et al.
Published: (2018)
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
Effect of rubber powder particle on the strength of foamed concrete
by: Abdullah, Siti Radziah, et al.
Published: (2017)
by: Abdullah, Siti Radziah, et al.
Published: (2017)
Determinants of contractor satisfaction
by: Masrom, M. A .N., et al.
Published: (2013)
by: Masrom, M. A .N., et al.
Published: (2013)
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
Exploration to find green building materials from recycled solid wastes
by: Din, Abdul Talib, et al.
Published: (2018)
by: Din, Abdul Talib, et al.
Published: (2018)
Mechanical properties and thermal behaviour of two-stage concrete containing palm oil fuel ash
by: Abdul Awal, A.S.M., et al.
Published: (2017)
by: Abdul Awal, A.S.M., et al.
Published: (2017)
Strength and water absorption rate of concrete made from palm oil fuel ash
by: Manap, Norpadzlihatun, et al.
Published: (2017)
by: Manap, Norpadzlihatun, et al.
Published: (2017)
Preparation and characterization of cogon grass
natural fiber as a concrete filler for gamma radiation
shielding
by: Mohd Yusof, Yusrina, et al.
Published: (2021)
by: Mohd Yusof, Yusrina, et al.
Published: (2021)
The suitability of coconut shell concrete as a replacements in term of mechanical and thermal properties – a review
by: Leman, Alif Syazani, et al.
Published: (2020)
by: Leman, Alif Syazani, et al.
Published: (2020)
Mechanical and durability performance of lightweight concrete brick with palm oil fuel ash (POFA)
by: Mohd Yassin, Nurain Izzati, et al.
Published: (2020)
by: Mohd Yassin, Nurain Izzati, et al.
Published: (2020)
Investigation on the performance of crushed tires as cement replacement in concrete
by: Wan Mohammad, Wan Ahmad Soffian, et al.
Published: (2020)
by: Wan Mohammad, Wan Ahmad Soffian, et al.
Published: (2020)
Malaysia attempts in reduce carbon dioxide (CO2) emission and sequestration in bio-concrete system; a future direction
by: Alshalif, A Faisal, et al.
Published: (2020)
by: Alshalif, A Faisal, et al.
Published: (2020)
Properties of concrete containing coal bottom ash and fine coconut shell as partial sand replacement
by: Mazenan, Puteri Natasya, et al.
Published: (2020)
by: Mazenan, Puteri Natasya, et al.
Published: (2020)
Properties of concrete containing recycled PET bottles as sand replacement
by: Misri, Zainora, et al.
Published: (2020)
by: Misri, Zainora, et al.
Published: (2020)
Fine recycled concrete aggregate as a material replacement in concrete production
by: Zaki, Zahir, et al.
Published: (2020)
by: Zaki, Zahir, et al.
Published: (2020)
Similar Items
-
Pembangunan instrumen penilaian pasca penghunian bagi perumahan bertingkat yang dibina menggunakan kaedah sistem binaan industri
by: Musa, Mohd Kamaruzaman
Published: (2022) -
Tahap Penggunaan Sistem Bangunan Berindustri (Ibs); Konkrit Pratuang Dalam
Industri Binaan Serta Impak Terhadap Kos
by: Nordin, Mohd Taufik
Published: (2007) -
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016) -
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012) -
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)