Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)

Post Occupancy Evaluation (POE) is an activity of the building evaluation process with a focus on quality, operational performance and satisfaction of the occupants. The POE is important to evaluate completed and occupied buildings to identify weaknesses and potential for future improvement. To date...

Full description

Bibliographic Details
Main Authors: Musaa, M. K., A. Rahman, M. A., H., Nurzalina, Lip, R.
Format: Article
Language:English
Published: 2021
Subjects:
Online Access:http://eprints.uthm.edu.my/1756/
http://eprints.uthm.edu.my/1756/1/J12112_0af41dabaa82c4a20f6214dc212ad88a.pdf
_version_ 1848887552475398144
author Musaa, M. K.
A. Rahman, M. A.
H., Nurzalina
Lip, R.
author_facet Musaa, M. K.
A. Rahman, M. A.
H., Nurzalina
Lip, R.
author_sort Musaa, M. K.
building UTHM Institutional Repository
collection Online Access
description Post Occupancy Evaluation (POE) is an activity of the building evaluation process with a focus on quality, operational performance and satisfaction of the occupants. The POE is important to evaluate completed and occupied buildings to identify weaknesses and potential for future improvement. To date, there have been various variations of POE instruments and tools to evaluate occupied buildings. However, the POE instrument for assessing high-rise housing constructed using the industrialized building system (IBS) method has not been developed specifically. In this regard, this study aims to discuss the construction of an effective POE instrument to measure the quality and performance of high-rise housing built using the IBS method. For this purpose, the 3 round Delphi method was adapted by involving 15 experts selected based on their background and experience related to IBS. The results of a three-round Delphi study found that 33 out of all sub-constructs were dropped because of low mean scores (<4.2 in two rounds) while 75 sub-constructs were identified as final items. The results of the Delphi study also found that all 10 constructs were 1) Spatial; 2) Design and aesthetics; 3) Physical; 4) Building materials; 5) Quality of work; 6) Comfort and well-being; 7) Environment and health; 8) Maintenance; 9) Value and 10) Cost is the most significant construct for developing PPP instruments. Accordingly, an effective Post-Occupancy Assessment Instrument for measuring the quality, performance and value of a home built using the IBS method should include all of these constructs.
first_indexed 2025-11-15T19:56:12Z
format Article
id uthm-1756
institution Universiti Tun Hussein Onn Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T19:56:12Z
publishDate 2021
recordtype eprints
repository_type Digital Repository
spelling uthm-17562021-10-18T02:45:02Z http://eprints.uthm.edu.my/1756/ Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS) Musaa, M. K. A. Rahman, M. A. H., Nurzalina Lip, R. TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Post Occupancy Evaluation (POE) is an activity of the building evaluation process with a focus on quality, operational performance and satisfaction of the occupants. The POE is important to evaluate completed and occupied buildings to identify weaknesses and potential for future improvement. To date, there have been various variations of POE instruments and tools to evaluate occupied buildings. However, the POE instrument for assessing high-rise housing constructed using the industrialized building system (IBS) method has not been developed specifically. In this regard, this study aims to discuss the construction of an effective POE instrument to measure the quality and performance of high-rise housing built using the IBS method. For this purpose, the 3 round Delphi method was adapted by involving 15 experts selected based on their background and experience related to IBS. The results of a three-round Delphi study found that 33 out of all sub-constructs were dropped because of low mean scores (<4.2 in two rounds) while 75 sub-constructs were identified as final items. The results of the Delphi study also found that all 10 constructs were 1) Spatial; 2) Design and aesthetics; 3) Physical; 4) Building materials; 5) Quality of work; 6) Comfort and well-being; 7) Environment and health; 8) Maintenance; 9) Value and 10) Cost is the most significant construct for developing PPP instruments. Accordingly, an effective Post-Occupancy Assessment Instrument for measuring the quality, performance and value of a home built using the IBS method should include all of these constructs. 2021 Article PeerReviewed text en http://eprints.uthm.edu.my/1756/1/J12112_0af41dabaa82c4a20f6214dc212ad88a.pdf Musaa, M. K. and A. Rahman, M. A. and H., Nurzalina and Lip, R. (2021) Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS). Jurnal Teknologi, 83 (2). pp. 85-94. https://doi.org/10.11113/jurnalteknologi.v83.15081
spellingShingle TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Musaa, M. K.
A. Rahman, M. A.
H., Nurzalina
Lip, R.
Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title_full Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title_fullStr Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title_full_unstemmed Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title_short Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
title_sort pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah sistem binaan berindustri (ibs)
topic TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
url http://eprints.uthm.edu.my/1756/
http://eprints.uthm.edu.my/1756/
http://eprints.uthm.edu.my/1756/1/J12112_0af41dabaa82c4a20f6214dc212ad88a.pdf