Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
The common objectives in permutation flowshop scheduling problem are to minimize the total completion time or formally called as makespan and tardiness. Artificial Bee Colony (ABC) algorithm is one of the methods used to solve the flowshop scheduling problem but only a few researches have been found...
| Main Author: | Mohd Pauzi, Nur Fazlinda |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1659/ http://eprints.uthm.edu.my/1659/2/NUR%20FAZLINDA%20MOHD%20PAUZI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1659/1/24p%20NUR%20FAZLINDA%20MOHD%20PAUZI.pdf http://eprints.uthm.edu.my/1659/3/NUR%20FAZLINDA%20MOHD%20PAUZI%20WATERMARK.pdf |
Similar Items
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018)
by: Abdullah, Haslina, et al.
Published: (2018)
Tool path generation of contour parallel based on ant colony optimisation
by: Abdullah, Haslina, et al.
Published: (2016)
by: Abdullah, Haslina, et al.
Published: (2016)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
Development Of Artificial Bee Colony (Abc) Variants And Memetic Optimization Algorithms
by: Sulaiman, Noorazliza
Published: (2017)
by: Sulaiman, Noorazliza
Published: (2017)
Artificial bee colony algorithm with time-varying strategy
by: Qin, Quande, et al.
Published: (2015)
by: Qin, Quande, et al.
Published: (2015)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Basic concept of implementing Artificial Bee Colony (ABC) system in flow shop scheduling
by: Ho, Yoong Chow, et al.
Published: (2013)
by: Ho, Yoong Chow, et al.
Published: (2013)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Synergistic artificial neural network scheme for monitoring and diagnosis of multivariate process variation in mean shifts
by: Marian, Mohd Fairuz
Published: (2014)
by: Marian, Mohd Fairuz
Published: (2014)
Study of artificial neural network scheme application in manufacturing industry for monitoring-diagnosis bivariate process variation
by: Majid, Mariam
Published: (2014)
by: Majid, Mariam
Published: (2014)
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
Similar Items
-
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018) -
Tool path generation of contour parallel based on ant colony optimisation
by: Abdullah, Haslina, et al.
Published: (2016) -
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)