Synergistic artificial neural network scheme for monitoring and diagnosis of multivariate process variation in mean shifts
In quality control, monitoring and diagnosis of multivariate out of control condition is essential in today’s manufacturing industries. The simplest case involves two correlated variables; for instance, monitoring value of temperature and pressure in our environment. Monitoring refers to the ide...
| Main Author: | Marian, Mohd Fairuz |
|---|---|
| Format: | Thesis |
| Language: | English English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1540/ http://eprints.uthm.edu.my/1540/1/24p%20MOHD%20FAIRUZ%20MARIAN.pdf http://eprints.uthm.edu.my/1540/2/MOHD%20FAIRUZ%20MARIAN%20WATERMARK.pdf |
Similar Items
A scheme for balanced monitoring and accurate diagnosis of bivariate process mean shifts
by: Masood, Ibrahim
Published: (2012)
by: Masood, Ibrahim
Published: (2012)
Study of artificial neural network scheme application in manufacturing industry for monitoring-diagnosis bivariate process variation
by: Majid, Mariam
Published: (2014)
by: Majid, Mariam
Published: (2014)
Diagnosis of bivariate process variation using an integrated mspc-ann scheme
by: Masood, Ibrahim, et al.
Published: (2016)
by: Masood, Ibrahim, et al.
Published: (2016)
SPC charting procedure for monitoring of small and large shifts in process mean
by: Masood, Ibrahim
Published: (2004)
by: Masood, Ibrahim
Published: (2004)
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)
Identification of shift variation in bivariate process using pattern recognition technique
by: Mohd Haizan, Mohamad Azrul Azhad
Published: (2019)
by: Mohd Haizan, Mohamad Azrul Azhad
Published: (2019)
Control chart pattern recognition using small window size for identifying bivariate process mean shifts
by: Kasmin, A., et al.
Published: (2021)
by: Kasmin, A., et al.
Published: (2021)
Design optimization of ANN-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
Design optimization of ann-based pattern recognizer for multivariate quality control
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
by: Abdul Jamil, Muhamad Faizal
Published: (2013)
Design optimization for the two-stage bivariate pattern recognition scheme
by: Mokhtar, Mohd Shukri
Published: (2015)
by: Mokhtar, Mohd Shukri
Published: (2015)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Prediction of flank wear and surface roughness by recurrent neural network in turning process
by: W. K., Lee, et al.
Published: (2021)
by: W. K., Lee, et al.
Published: (2021)
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
by: Yeong, Kah Wai
Published: (2008)
by: Yeong, Kah Wai
Published: (2008)
Fuzzy random based mean variance model for agricultural production planning
by: Othman, Mohammad Haris Haikal, et al.
by: Othman, Mohammad Haris Haikal, et al.
EPM 441E(4) - PENGURUSAN PENGELUARAN OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
EPM 441E(4) - PRODUCTION MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - COMPUTER INTEGRATED MANUFACTURING OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EPP 441(3) - PEMBUATAN TERSEPADU KOMPUTER OKT-NOV 06.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2006)
Kesan Perkhidmatan Pengurusan Fasiliti Ke Atas Kepuasan Penyelia Kilang Elektrik Dan Elektronik (E&E) Di Malaysia [TS155. A827 2005 f rb].
by: Zainuddin, Ashrof
Published: (2005)
by: Zainuddin, Ashrof
Published: (2005)
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
by: Retnasamy, Vithyacharan
Published: (2005)
by: Retnasamy, Vithyacharan
Published: (2005)
Development Of Decision Model For Maintenance Analysis Of Non-Repairable Component By Considering The External Factor [TS192. R821 2007 f rb].
by: Rosmaini, Ahmad
Published: (2007)
by: Rosmaini, Ahmad
Published: (2007)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
EPM 441(4) - PENGURUSAN PENGELUARAN OKT 04.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2004)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
AGW 617 - OPERATIONS STRATEGY SEPT. 1999.
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
by: PPP, Pusat Pengajian Pengurusan
Published: (1999)
EPM 321 MANUFACTURING SYSTEM (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 451 COMPUTER INTEGRATED MANUFACTURING (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPP 331 MANUFACTURING TECHNOLOGY II (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 342/3 – Production Management [Pengurusan Pengeluaran] Duration: 3 hours [Masa: 3 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
Employee Involvement In EMS/ISO 14001 And Its Spillover Effect In Creating Consumer Environmentally Responsible Behavior [TS155.7. R173 2007 f rb].
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
by: Nik Abdul Rashid, Nik Ramli
Published: (2007)
EEM 421 - KAEDAH KUALITI MAC 05.
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
Published: (2005)
APP403 - PRODUKTIVITI DAN KAWALAN MUTU - FEBRUARI 1998.
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
by: PPP, Pusat Pengajian Pengurusan
Published: (1998)
ASU661 - PRODUVTIVITY AND QUALITY MANAGEMENT - APRIL 1995.
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
by: PPP, Pusat Pengajian Pengurusan
Published: (1995)
ATP204 - PENGURUSAN PENGELUARAN - APRIL 1987.
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
by: PPP, Pusat Pengajian Pengurusan
Published: (1987)
ATP204 - PENGURUSAN PENGELUARAN - JUN 1994.
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
by: PPP, Pusat Pengajian Pengurusan
Published: (1994)
ATP204 - PENGURUSAN PENGELUARAN - OKT- NOVEMBER 1993.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
ATP204 - PENGURUSAN PENGELUARAN - PEPERIKSAAN TAMBAHAN SIDANG 1992-93.
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
by: PPP, Pusat Pengajian Pengurusan
Published: (1993)
Similar Items
-
A scheme for balanced monitoring and accurate diagnosis of bivariate process mean shifts
by: Masood, Ibrahim
Published: (2012) -
Study of artificial neural network scheme application in manufacturing industry for monitoring-diagnosis bivariate process variation
by: Majid, Mariam
Published: (2014) -
Diagnosis of bivariate process variation using an integrated mspc-ann scheme
by: Masood, Ibrahim, et al.
Published: (2016) -
SPC charting procedure for monitoring of small and large shifts in process mean
by: Masood, Ibrahim
Published: (2004) -
Pattern recognition for manufacturing process variation using integrated statistical process control – artificial neural network
by: Mohd Ariffin, Ahmad Azrizal
Published: (2015)