In-success factor for project management in high-rise building project
Success of each project and efficiency is required to achieve a greater advantage over the firms in construction industry today. Effective project management overcomes these types of challenges such as good communication and good planning and scheduling. Each big construction project company s...
| Main Author: | Yahya Al-Tawil, Yahya Mohsen |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1173/ http://eprints.uthm.edu.my/1173/1/24p%20YAHYA%20MOHSEN%20YAHYA%20AL-TAWIL.pdf http://eprints.uthm.edu.my/1173/2/YAHYA%20MOHSEN%20YAHYA%20AL-TAWIL%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1173/3/YAHYA%20MOHSEN%20YAHYA%20AL-TAWIL%20WATERMARK.pdf |
Similar Items
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021)
by: Chin Foo, Lee
Published: (2021)
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry
by: Shaikh, Haseeb Halim
Published: (2021)
by: Shaikh, Haseeb Halim
Published: (2021)
Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate
by: Alnadish, Adham, et al.
Published: (2018)
by: Alnadish, Adham, et al.
Published: (2018)
EAA384 CONSTRUCTION TECHNOLOGY (JAN 2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
by: Pusat Pengajian Kejuruteraan Awam, PPKAW
Published: (2016)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Static strength of tubular DT joints using lusas finite element software
by: Abd. Rahman, Norashidah
Published: (2005)
by: Abd. Rahman, Norashidah
Published: (2005)
Significant factors of construction delays among contractors in Klang Valley and its mitigation
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
by: Hasmori, Muhammad Fikri, et al.
Published: (2018)
The challenges Of quantity surveying practice in
sustainable construction project
by: Che Haron, Roziha, et al.
Published: (2017)
by: Che Haron, Roziha, et al.
Published: (2017)
Contributing cost variation factors in highway projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan
by: Kong, H. P., et al.
Published: (2018)
by: Kong, H. P., et al.
Published: (2018)
Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
by: Mohd Nawawi, Norwina, et al.
Published: (2017)
Impact of procurement methods and project types on construction projects performance / Jimoh Richard, Oyewobi Luqman and Aliu Nurayn
by: Richard, Jimoh, et al.
Published: (2015)
by: Richard, Jimoh, et al.
Published: (2015)
Safety management among contractor g7 in the construction of high rise building / Zulaikha Ismail
by: Ismail, Zulaikha
Published: (2013)
by: Ismail, Zulaikha
Published: (2013)
Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
by: Che Ibrahim, Che Khairil Izam, et al.
Published: (2009)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Kajian terhadap kepentingan dan penggunaan kawasan lapang bagi kawasan perumahan awam / Syamsuri Daud
by: Daud, Syamsuri
Published: (1999)
by: Daud, Syamsuri
Published: (1999)
Improvement of constructability guidelines for design phase in highway project / Siti Hafizan Hassan, Nadira Ahzahar and Hazrina Ahmad
by: Hassan, Siti Hafizan, et al.
Published: (2009)
by: Hassan, Siti Hafizan, et al.
Published: (2009)
A generic process of documentation and data management for historical Malay architecture using BIM
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
by: Mustafa, Muhammad Hadi, et al.
Published: (2020)
Developing a framework for the success of international development projects in the Maldives / Mohamed Yamin… [et.al]
by: Yamin, Mohamad, et al.
Published: (2017)
by: Yamin, Mohamad, et al.
Published: (2017)
New towns in Peninsular Malaysia: planning and development / Dasimah Omar
by: Omar, Dasimah
Published: (2004)
by: Omar, Dasimah
Published: (2004)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Cost implication for a residential high-rise project to achieve certified level Green Building Index (GBI) rating.
by: Lai, Wei Chian
Published: (2013)
by: Lai, Wei Chian
Published: (2013)
Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
by: Mohd Tarjuddin, Muhammad Faiz
Published: (2015)
Project Management Success Factors For Sustainable Housing: A Framework
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
by: Bakar, Abu Hassan Abu, et al.
Published: (2009)
To determine the customer satisfaction factor to architecture design of Malaysia high rise residential building projects during the design and planning stage / Lo Jia Woei
by: Lo, Jia Woei
Published: (2022)
by: Lo, Jia Woei
Published: (2022)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Kesan pengangkutan LRT (Transit Laju Ringan) terhadap mobiliti penduduk bandar (kes kajian: Kuala Lumpur) / Maimoon Zainal
by: Zainal, Maimoon
Published: (1998)
by: Zainal, Maimoon
Published: (1998)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
The application of industrialised building system in residential project
by: Syazana, Abdul Aziz
Published: (2010)
by: Syazana, Abdul Aziz
Published: (2010)
Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop
by: Lop, Nor Suzila
Published: (2019)
by: Lop, Nor Suzila
Published: (2019)
The labour attitude towards personal protective equipment in high rise construction / Nur Azlina Hanafi
by: Hanafi, Nur Azlina
Published: (2013)
by: Hanafi, Nur Azlina
Published: (2013)
Agreement Options in Multi-person Decision Optimizing High-rise Buildings Columns
by: Utomo, Christiono, et al.
Published: (2009)
by: Utomo, Christiono, et al.
Published: (2009)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Challanges of building information modelling (BIM) in project implementation
by: Loh, Mei Yee
Published: (2014)
by: Loh, Mei Yee
Published: (2014)
Similar Items
-
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015) -
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019) -
Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia
by: Abas, Nor Haslinda, et al.
Published: (2020) -
Management factors affecting time and cost performance of construction projects
by: Chin Foo, Lee
Published: (2021) -
Risk of construction corruption factors in construction project life cycle from contractors’ perspectives
by: Mohd Saim, Nur Amylia Izrin
Published: (2021)