Critical success factor model framework for lean management application in industrialised building system (IBS) production
In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method whi...
| Main Author: | Mohd Noor, Siti Rahimah |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2020
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/1155/ http://eprints.uthm.edu.my/1155/2/24p%20SITI%20RAHIMAH%20MOHD%20NOOR.pdf http://eprints.uthm.edu.my/1155/1/SITI%20RAHIMAH%20MOHD%20NOOR%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1155/3/SITI%20RAHIMAH%20MOHD%20NOOR%20WATERMARK.pdf |
Similar Items
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)
by: Ismail, Hassan
Published: (2020)
Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
by: Musaa, M. K., et al.
Published: (2021)
by: Musaa, M. K., et al.
Published: (2021)
Benefits for public healthcare buildings towards Net Zero
Energy Buildings (NZEBs): initial reviews
by: Sulzakimin, M. Sulzakimin, et al.
Published: (2020)
by: Sulzakimin, M. Sulzakimin, et al.
Published: (2020)
Critical information infrastructure protection requirement for the Malaysia public sector
by: Mohd Sabtu, Saiful Bahari, et al.
by: Mohd Sabtu, Saiful Bahari, et al.
Comparative study on the Malaysian sustainable building rating systems
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
by: Mohammed Usman, Abdullahi, et al.
Published: (2018)
Exploration to find green building materials from recycled solid wastes
by: Din, Abdul Talib, et al.
Published: (2018)
by: Din, Abdul Talib, et al.
Published: (2018)
Decision-making process framework at the planning phase of housing development project
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
by: Mohd Sofberi, Nurul Atiqah
Published: (2021)
Noise assessment at construction site which uses IBS formwork system
by: Abas, Nor Haslinda, et al.
Published: (2018)
by: Abas, Nor Haslinda, et al.
Published: (2018)
Comparative study on the perspective towards the benefits and hindrances of implementing building information modelling (BIM)
by: Ang, Peniel Soon Ern, et al.
Published: (2020)
by: Ang, Peniel Soon Ern, et al.
Published: (2020)
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
by: Karunakaran, Priyadatchini
Published: (2020)
by: Karunakaran, Priyadatchini
Published: (2020)
Assessing the level of community involvement in post-disaster
housing reconstruction and current green design practices towards
net-zero energy buildings
by: M, Sulzakimin, et al.
Published: (2020)
by: M, Sulzakimin, et al.
Published: (2020)
Fine recycled concrete aggregate as a material replacement in concrete production
by: Zaki, Zahir, et al.
Published: (2020)
by: Zaki, Zahir, et al.
Published: (2020)
Green concrete production incorporating waste carpet fiber and palm oil fuel ash
by: Mohammadhosseini, Hossein, et al.
Published: (2016)
by: Mohammadhosseini, Hossein, et al.
Published: (2016)
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019)
by: AL-Fadhali, Najib, et al.
Published: (2019)
Concrete brick properties incorporating EPS and POFA as replacement materials
by: Adnan, Suraya Hani, et al.
Published: (2021)
by: Adnan, Suraya Hani, et al.
Published: (2021)
Structural relationship model of causes and effects of construction changes in UAE construction industry
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
by: Al Ameri, Abdulla Eissa Saleh
Published: (2021)
Removal of phosphorus from synthetic wastewater using recycled concrete aggregates as a filter medium
by: Adnan, Suraya Hani, et al.
Published: (2018)
by: Adnan, Suraya Hani, et al.
Published: (2018)
E-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)
Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
by: Masrom, Md Asrul Nasid, et al.
Published: (2015)
Effect of rubber powder particle on the strength of foamed concrete
by: Abdullah, Siti Radziah, et al.
Published: (2017)
by: Abdullah, Siti Radziah, et al.
Published: (2017)
Determinants of contractor satisfaction
by: Masrom, M. A .N., et al.
Published: (2013)
by: Masrom, M. A .N., et al.
Published: (2013)
Mechanical properties and thermal behaviour of two-stage concrete containing palm oil fuel ash
by: Abdul Awal, A.S.M., et al.
Published: (2017)
by: Abdul Awal, A.S.M., et al.
Published: (2017)
Strength and water absorption rate of concrete made from palm oil fuel ash
by: Manap, Norpadzlihatun, et al.
Published: (2017)
by: Manap, Norpadzlihatun, et al.
Published: (2017)
Preparation and characterization of cogon grass
natural fiber as a concrete filler for gamma radiation
shielding
by: Mohd Yusof, Yusrina, et al.
Published: (2021)
by: Mohd Yusof, Yusrina, et al.
Published: (2021)
The suitability of coconut shell concrete as a replacements in term of mechanical and thermal properties – a review
by: Leman, Alif Syazani, et al.
Published: (2020)
by: Leman, Alif Syazani, et al.
Published: (2020)
Mechanical and durability performance of lightweight concrete brick with palm oil fuel ash (POFA)
by: Mohd Yassin, Nurain Izzati, et al.
Published: (2020)
by: Mohd Yassin, Nurain Izzati, et al.
Published: (2020)
Investigation on the performance of crushed tires as cement replacement in concrete
by: Wan Mohammad, Wan Ahmad Soffian, et al.
Published: (2020)
by: Wan Mohammad, Wan Ahmad Soffian, et al.
Published: (2020)
Malaysia attempts in reduce carbon dioxide (CO2) emission and sequestration in bio-concrete system; a future direction
by: Alshalif, A Faisal, et al.
Published: (2020)
by: Alshalif, A Faisal, et al.
Published: (2020)
Properties of concrete containing coal bottom ash and fine coconut shell as partial sand replacement
by: Mazenan, Puteri Natasya, et al.
Published: (2020)
by: Mazenan, Puteri Natasya, et al.
Published: (2020)
Properties of concrete containing recycled PET bottles as sand replacement
by: Misri, Zainora, et al.
Published: (2020)
by: Misri, Zainora, et al.
Published: (2020)
A review on seawater as concrete composites and its effects on the strength and durability
by: Hussain, Zahid, et al.
Published: (2020)
by: Hussain, Zahid, et al.
Published: (2020)
Flexural strength of concrete prism strengthened using CFRP with modified mortar
by: Radzuan, Nurshafiqah, et al.
Published: (2020)
by: Radzuan, Nurshafiqah, et al.
Published: (2020)
Quantitative investigation of physical and mechanical properties of different artificial aggregate
by: Mokhatar, ShahrulNiza, et al.
Published: (2020)
by: Mokhatar, ShahrulNiza, et al.
Published: (2020)
Overview of empirical equation prediction for ultimate axial load of precast lightweight foamed concrete sandwich panel (PLFP)
by: Goh, Wan Inn, et al.
Published: (2016)
by: Goh, Wan Inn, et al.
Published: (2016)
Similar Items
-
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018) -
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016) -
The selection of IBS precast manufacturing plant in Malaysia using GIS
by: Azman, Mohamed Nor Azhari, et al.
Published: (2012)