Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells

In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method whi...

Full description

Bibliographic Details
Main Author: Othman, Sheril Amira
Format: Thesis
Language:English
English
English
Published: 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/1153/
http://eprints.uthm.edu.my/1153/1/24p%20SHERIL%20AMIRA%20OTHMAN.pdf
http://eprints.uthm.edu.my/1153/2/SHERIL%20AMIRA%20OTHMAN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1153/3/SHERIL%20AMIRA%20OTHMAN%20WATERMARK.pdf
_version_ 1848887389419732992
author Othman, Sheril Amira
author_facet Othman, Sheril Amira
author_sort Othman, Sheril Amira
building UTHM Institutional Repository
collection Online Access
description In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method which leads to a longer duration, lower productivity and poor quality of the building. The adoption of IBS requires systematic project management to ensure the best output in improving construction deliverables. Improper IBS project management can generate physical and non-physical waste in the production and construction tasks. This research aimed to evaluate on how to prevent waste and any types of loss during IBS construction by implementing lean management. This research examined the relation between critical factors in implementing lean management technique using the Interpretative Structural Modelling (ISM) method. In establishing ISM model, 51 influencing factors in implementing lean management based on lean construction key principles had been identified throughout an extensive literature review. The results from questionnaire survey identified 18 critical success factors for lean management adoption in IBS application. For further investigation, semi-structured interviews were conducted to collect the qualitative data for the critical factors. ISM analysis method was used to study the association between each critical success factor. The initial model was developed to promote the adoption of lean management technique in IBS construction. Deeper ISM analysis established a Matrice d’Impacts Croisés Multiplication Appliqués à un Classement (MICMAC). The MICMAC results in this research demonstrated that four important factors are categorised as Independent / Driving factors namely ‘planning’, ‘educate labour’, ‘modularisation’, and ‘standardisation’. These factors were explored in detail to drive the performance elements categorised in Dependent factor which is ‘reduce production time’. The findings provide a model that prioritised the critical success factors which lead to framework of lean management application in IBS production.
first_indexed 2025-11-15T19:53:37Z
format Thesis
id uthm-1153
institution Universiti Tun Hussein Onn Malaysia
institution_category Local University
language English
English
English
last_indexed 2025-11-15T19:53:37Z
publishDate 2020
recordtype eprints
repository_type Digital Repository
spelling uthm-11532021-09-30T05:45:59Z http://eprints.uthm.edu.my/1153/ Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells Othman, Sheril Amira TA1501-1820 Applied optics. Photonics In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method which leads to a longer duration, lower productivity and poor quality of the building. The adoption of IBS requires systematic project management to ensure the best output in improving construction deliverables. Improper IBS project management can generate physical and non-physical waste in the production and construction tasks. This research aimed to evaluate on how to prevent waste and any types of loss during IBS construction by implementing lean management. This research examined the relation between critical factors in implementing lean management technique using the Interpretative Structural Modelling (ISM) method. In establishing ISM model, 51 influencing factors in implementing lean management based on lean construction key principles had been identified throughout an extensive literature review. The results from questionnaire survey identified 18 critical success factors for lean management adoption in IBS application. For further investigation, semi-structured interviews were conducted to collect the qualitative data for the critical factors. ISM analysis method was used to study the association between each critical success factor. The initial model was developed to promote the adoption of lean management technique in IBS construction. Deeper ISM analysis established a Matrice d’Impacts Croisés Multiplication Appliqués à un Classement (MICMAC). The MICMAC results in this research demonstrated that four important factors are categorised as Independent / Driving factors namely ‘planning’, ‘educate labour’, ‘modularisation’, and ‘standardisation’. These factors were explored in detail to drive the performance elements categorised in Dependent factor which is ‘reduce production time’. The findings provide a model that prioritised the critical success factors which lead to framework of lean management application in IBS production. 2020-01 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1153/1/24p%20SHERIL%20AMIRA%20OTHMAN.pdf text en http://eprints.uthm.edu.my/1153/2/SHERIL%20AMIRA%20OTHMAN%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1153/3/SHERIL%20AMIRA%20OTHMAN%20WATERMARK.pdf Othman, Sheril Amira (2020) Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells. Masters thesis, Universiti Tun Hussein Onn Malaysia.
spellingShingle TA1501-1820 Applied optics. Photonics
Othman, Sheril Amira
Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title_full Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title_fullStr Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title_full_unstemmed Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title_short Development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
title_sort development of a 3d bioprinting system, characterisation of bioink and printing microspheroids of hela cells
topic TA1501-1820 Applied optics. Photonics
url http://eprints.uthm.edu.my/1153/
http://eprints.uthm.edu.my/1153/1/24p%20SHERIL%20AMIRA%20OTHMAN.pdf
http://eprints.uthm.edu.my/1153/2/SHERIL%20AMIRA%20OTHMAN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1153/3/SHERIL%20AMIRA%20OTHMAN%20WATERMARK.pdf